MAR 191982
m
r o>
%
'
Docket No. 50-265
66CEjY
g
4
Commonwealth Edison Company
'_
E2
7
1
ATTN:
Mr. Cordell Reed
9
c
A-
Vice President
%
E
Post Office Box 767
Chicago, IL 60690
4'
/
Gentlemen:
This refers to the special safety inspection conducted by Messrs.
D. H. Danielson and K. D. Ward of this office on January 18-21, 29
and 30, February 2-4, 6 and 7, 9 and 10, 16 and 17, 1982, and a meeting
at the Region III office on January 26, 1982, concerning the reactor
water cleanup system. temporary repair at the Quad-Cities Station, Unit 2,
authorized by NRC Operating License No. DPR-30 and to the discussion of our
findings with Mr. N. J. Kalivianakis and others at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
t
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
i
it is necessary that you (a) notify this office by telephone within ten (10)
I
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
l
this letter a written application to this office to withhold such information.
,
l
If your receipt of this. letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so that
a new due date may be established. Consistent with Section 2.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4). The information sought to be
8204050355 820319
DR ADOCK 05000
{g
IfI
,
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
g
.
Commonwealth Edison Company
2
g
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
ii.riair.r.1 Signed ly C.E. J'orciiu
-
C. E. Norelius, Director
Division of Engineering and
Technical Programs
Enclosure:
Inspection Report
No. 50-265/82-04(DETP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
N. Kalivianakis, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RI1I
Mary Jo Murray, Office of
Assistant Attorney General
RIII
-
RIII
II
RJI
RIII
')Vard/so
Da/178
.},bMd
O
,
'
f77/
{[uy
nielson
Walker
IItti
'
.
/y
b (.f
gjll{D
3 f g/ 8*
2/26/82