ML20050B417
| ML20050B417 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/19/1982 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-20485-GHD, DER-81-51, NUDOCS 8204050307 | |
| Download: ML20050B417 (2) | |
Text
_ _ _ _ _ _
Dockst No. 50-528/529/530
.- Q
50 55(e) Report
@ M D N NNb @b W
PHOENIX. ARIZON A 85036 P. O 60 x 216 6 6 March 19, 1982 ANPP-20485-C m
O O
U. S. Nuclear Regulatory Commission gs d
Region V EO j
Creekside Oaks Office Park
~
4 4PR2
- E g j,.Jgg g
-j2 1450 Haria 1.ane - Suite 210 Walnut Creek, California 94596-5368 m.,
7
- reN,
/
Attention: Mr. B. H. Faulkenberry, Chief Reactor Construction and Engineering Support Branch 4
to W
Subject:
Time Extension Report - DER 81-51 A 50.55(e) Potentially Reportable Deficiency Relating to Unit 1 Diesel Generator Control Cabinets Wiring Not Separated Between Class 1E and Non-Class 1E File: 82-0)9-026 D.4.33.2
Reference:
(A) Telephone Conversation between J. Eckhardt and G. Duckworth on December 30, 1981 (B) ANPP-20015, dated January 28, 1982 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A) and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Finsi Report would be available by March 22, 1982.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by April 23, 1982, when a complete report will be submitted.
There is no new information or change to the Interim Report at this tir e.
Very truly yours,
([.
QR M LL I J'
E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects
~e ANPP Froject Director EEVBJr/GHD:ske
~~ "
cc: See Attached Page 2 0:.'...3 h
$l/
8204050307 820319 I h PDR ADOCK 03000528 S
- jf -j
I 1
't
\\
U. S. Nucloor R3gulatory Commisoien Attention: Mr. B. H. Faulkenberry, Chief ANPP-20485-CllD/BSK March 19, 1982 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht C. C. Andognini F. W. Hartley J. H. Allen A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. C. Bingham R. L. Parterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen R. L. Creenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Hs. Patricia Lee llourihan 6413 South 26th Street Phoenix, Arizona 85040 1
1
. ow w e
. _ _ _ _ _ _