ML20050B302
| ML20050B302 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 02/05/1982 |
| From: | Rogers L VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML20050B298 | List: |
| References | |
| NUDOCS 8204050183 | |
| Download: ML20050B302 (9) | |
Text
{{#Wiki_filter:__ _ -. 1 VIRGINIA ELECTRIC AND P0kTR COMPANY NORT!! ANNA P0b'ER STATION MONTijiLY OPERATING REPORT MONTli JANUARY YEAR 1982 T APPROVED: STATION hTNMER ~ l B204050183 820212 l PDR ADOCK 05000338 [ R POR l
l o 1 i OPERATING DATA REPORT DOCKET NO. 50-338 DATE 02-05-82 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2401 OPERATING STATUS Notes 1. Unit Neme: North Anna 1 2. Reporting Period: January 1982 3. Licensed Thermal Power (M W): 2775 ~ 4. Nameplate Rating (Gross We): 947 5. Design Electrical Rating (Net We): 907 6. Maximum Dependable Capacity (Gross We): 918 7. Maximum Dependable Capacity (Net We): 865 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons: NA 9. Power Level To Which Restricted, If Any (Net We): N/A
- 10. Reasons For Reat rictions, If Any:
N/A This Month Yr.-to-Date Cumulative II. Ilours In Reporting Period 744 744 32,065 12. Number of Hours Reactor Was Critical 736.3 736.3 24,564.6 13. Reactor Reserve Shutdown llours 7.7 7.7, 242.6 14. Ilours Generator On-Line 730.6 730.o 24,083. 6 15. Unit Reserve Shutdown flours 0 0 0 E6. Gross Thermal Energy Generated (HWil) 1,937,083 1,937,083 62,251,335 17. Gross Electrical Energy Generated (HWil) 625,395 625,395 19,870,917 18. Het Electrical Energy Generated (HWil) 591,615 591,615 18,714,531 19. Unit Service Factor 98.2 98.2
- 75. l__ _
20. Unit Availability Factor 98.2 98.2_ 75.1 31. Unit Capacity Factor (Using HDC Net) 91.9 22. Unit Capacity Factor (Using DER Net) 87.7 91.2 67.5 87.7 64.3 23. Unit Forced Outage Rate 1.8 1.8 4-7 24. Shutdowns Scheduled Over Next 6 Honthe [ Type, Date, and Duration of Eacid: Refueling Outage 05-21-82 thru 07-02-82 25. 11 Shut Down At End Of Report Period, Estimated Date of Startup: NA 26. Units in Test Status (Prior to Cossnercial Operation): Forecast Achieved INITI Al. CRITICAL.lTY INITIAL El.ECTRICITY ~ ~~- - " ~ ~ ~ ~ - " ~ ~ ~ ~ "-~~~~~~~ COMMERCIAL OPERAT10N l l =
I 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1 DATE 02-05-82 COMPLETED BY 1..L. Rogers TELEPHONE 703-894-5151X24 NONTil January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net) (MW'e-Ne t) 1 846 17 847 2 847 18 852 3 847 19 820 4 844 20 805 [ 5 847 21 800 6 848 22 775 7 846 23 73 8 798 24 325 9 845 25 773 10 846 26 842 11 849 27 849 12 852_ 28 845 13 849 29 848 14 849 30 846 . g 15 851 31 <856 16 844 INSTRUCTIONS On this format, list the average daily unit power level In MVe Net for each stay in the report Ing month. Compute to the nearest whole megawatt, 1
~ ~- ^ ~, INIT SHUIDOWS AND POWER REDUCTIONS DOCKET NO. ~ 50-338 ~ 'z, UNIT NAME North Anna 1 DATE 02-05-82 /t_. REPORT tt0 NTH JANUARY COMPLETED BY L. L. ROGERS TELEPHONE (703) 894-5151 X2401 / ~ ^ I 2~ No. Date Type Duration Reason Method of !.tcensee System Component (suse & Corrective (Hours) Shutting Event Code Code Action to Down Reactor Report f - 4 5 3 Prevent Recurrence 2 3' '~,j 'INSTRU._' . Ramped unit down to 75% power 82-01 820107 r Fc- -o 'n G,' 5 LER 82-01 IA to comply with Tech Specs be- ~ cause unable to obtain surveil-lance data. 82-02 820123 F 13.4 8 1 NA NA AA Ramped unit down and removed from service to isolate 58 and 68 feedwater heater. ,s-f 4 s E ? I 2 3 4 F: Forced Reasee: Method: Exhibit F - Instructions 5: ScLeduled A-Equspecat Failure (Explata) 1-Manual for Preparation of Deta B-Masatenance or Test 2-Manual Scras. Entry Sheets for Licensee C-Refeettag 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0101) E-Operator Training & License Examination 5-Load Reduction F-Adelaistrative 9-Other 5 G-operaticsal Error (Explais) l 5-Other (Explais) Exhibit 5 - Same Source I
s A f. Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS [ EXPLANATION SHEET 00CKET No. 50-338 REPORT MONTH JANUARY _ UNIT NAME NA-1 YEAR 1982 DATE 02-05-82 COMPLETED BY L. L. ROGERS 82-01 (G) (5) On January 7, 1982 with the Unit at 100% power, power range detector N-44 drifted low and was declared inoperable. The cause for exceeding the initial 12 hour surveillance was due to improper input of data to the plant computer. The faulty power ragge detector is scheduled to be replaced during the refualink outage. Personnel have been mai.e aware of the 12 hour QPTR surveillance requirement and a more rigorous sc hedule has been set up to implement the surveillance. c f e I l l t
6 ~ ~1.z.'~ ,w. m.;...; 3, ^ ^ ~ c 5 VJ .i OPERATING DATA REPORT - .U ' ' ' ~
- k P',.
. '::. G1. c,%.' "...;p3 DOCKET NO. 50-339 .? 'y (, i.;. c % gt :DATE 02-05 a e i
- COMPLETED BY L. L. Roge rs --.-
c-'
- f / -: ; ;, e.
e. . TELEPHONE (703) 894-5151 X2401 . qj.g OPERATING STATUS ' f.;.2 ~ Notes ?N ' 1.. Unit Naine:' North Anna 2 TJ .2. Reporting' Period: January 1982 .Q l y 3. Licensed Thermal Power (HWt): 2775 9
- 4.. Nameplate Rating (Gross'We):
947 ] 5.? Design Electrical Rating (Net We): 907
- 6.. Maximum Dependable Capacity.(Gross We):
939 s@;;
- 7. '. Maximum Dependable Capacity (Net We):
890 8.. If Changes.0ccur in Capacity, Ratings (Items No. 3 thru 7) Since Last Report, Give Reaso .. :'f;.. ~ NA 'f5?. 9. Power Level To Which Restricted, If Any (Net We): N/A
- Q.
- 10. Reasons For Restrictions, If Any:
N/A ' 'k'lj 3 ..$>3 g 1 This Month Yr.-to-Date cumulative.'M 11.- Hours In Reporting Period 744 744 9,936' M '. 1
- 12. Number of Hours Reactor Was Critical 677.2 677.2 8,092 ' if,
- 13. Reactor Reserve Shutdown Hours 34.6 34.6 1,667.8Fj,
- 14. Hours Generator On-Line 640.1 640.1 7,870.2 P.,-
- 15. Unit Reserve Shutdown Hours 0
0 0 s c, -
- 16. Gross Thermal Energy Generated (MWH)
_1,601,091 1,601,091 20,383,932 aj
- 17. Gross Electrical Energy Generated (MVH) 535,804 535,804 6,873,036 up
- 18. Net Electrical Energy Generated (MWH) 508,654 508,654 6,511,070 wi.
19. Unit Service Factor 86.0 86.0 79.2 F0 20. Unit Availability Factor 86.0 86.0 79.2 t-(
- 21. Unit Capacity Factor (Using MDC Net) 76.8 76.8 73.6 :J,--
- 22. Unit Capacit; Factor (Using DER Net) 75.4 75.4 72.2i-{.
"I
- 23. Unit Forced Outage Rate 12.4 12.4 18.2 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling Outage 03-05-82 thru 05-14-82 25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA 26. Units In Test Status (Prior to Co:mnercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION .y: i .nk"
-lf..*,.,k ~ d:,.'.. c ...n. ' ;.., s
- "idi$
' '$ ~ ' AVERAGE DAILY UNIT POWER LEVEL 1. '..,, :... ' ?,... i. ;, (G.. es,Q ~:. zzra .s ~. 3;y*.;.- " ',. c.; ; ' i. . DOCKET NO. 50-339 9%' ..s . t.-
- =
~..... , :et w.g.v g .c?y - ly..,. UNIT
- NA'-2 **'W m
- ,r..eyng s
. DATE. s02-05 ' ~
- L ' *,
. a p.r y m ?'. COMPLETED BY L.L. Rogers o .s ... ;.1.c wn;. ~.
- ^ -
TELEPHONE 703-894-5151X: <4- .w y i@~ga. -;v ,p HONTH January w iiy:~:i.$y. 'l:N m~ .,7 .s 1 ~ .M DAY.' AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL ~g.yi ~ (MWe-Net) (MWe-Nat):t.p.WcV i. 4' Y Ek;c.1- ~ 1 594 17 869 -;. i ... : ?:4 * ' '3.$f.F. .2 0 18 867 . o. ?. Q' 3 0 19 870 .:n r 4 14 20 874 ' A.P
- r-5 288 21 890
,y i 6 413 22 892 .N .. w. 7 421 23 884 8 388 24 881 9 47 25 885 Q 10 502 26 895 A 11 891 27 891 12 891 28 893 13 880 29 893 i 14 872 30 891 l 15 869 31 883 16 865 INSTRUCTIONS On this format, list the average daily unit power level in HWe-Net for each day in the reporting month. Compute to the nearest whole me8avatt. ~ e
-m Q3 m.. 2 ;,,, f Paga 1
- of 1
- 7. f UNITSHUTDOWNAN5 REDCTIONS J ' '
- 3 g.
..g;. l ~.PLANATION SHEET ' DOCKET NO,.- 50-339 Sq k EX
- c. ;..
-x. 2h... ~ ' REPORT MONTN JANUARY ~-UNIT NAME NA-2 y 7.g U AR 1981 DATE 02-05-82 ~ 5t. c.,, l ;$ COMPLETED BY L. L. ROGERS g: 3 -.. s. Vy 4 ?>
- llQ 82-01
.; (A) (1) On January 1,1982 v'ith the Unit at 100% power it was obser ed((Y. The' Unit was ramped down and removed from s that-identified RCS leakage had increased to approximately li--I 15-30 GPH. is to comply with Tech Specs. The Cause of the excessive RCS F-b sr; leakage was due'to m'issing packing on the RER isolation valve @ f W Thevalvewasrepacked,cycledandleaktestedgf,! (MOV-2700). k ) beforeretuningittoservice...Balancemoveonturbinewasgf made. ru.,.,.. c p.y 82-02 (A) (1) On January 4,1982 with the Unit ~ 20% power, ramped Unit ddwn.khk and removed from service to balance the turbine. h 5". e ~2-fp 83-04 (A) (1) On January 9,1982 with the Unit at 30% ramped the Unit off : If.g line to balance the turbine. 3 i.y-J' vtt. Coolant Loop flow was lost when the power to "C" Reactor. . h, l 'gh ~ 82-05 (A) (1) On January 10, 1982 with the Unit at.20% power "C" Reactor Coolant Pump was lost. This was caused by the failure of '. Ut.t' l the normal supply breaker (25C2) to remain closed during the' 3 transfer of alternate to normal power supply to 2C Station (3 ) Service Bus. The 25C2 breaker was tested and examined both 1 '. 4.' - l electrically and mechanically. The reason for the breaker l opening after it had been closed could not be identified. T86
- t
- rg
\\ s w D ?
UNIT SHUTDOWNS AND P0kT.R REDUCTIONS DOCKET NO. 50-339 l ~ DATE 02-05-82 UNIT NAME North Anna 2 l REPORT MONTH JANUARY COMPLETED BY L. L. ROGERS i TELEPHOME (703) 894-5151 X24' I No. Date Tylac Duration Reason Method of Licensee System Component .Cause & Corrective (Hours) Shutting Event Code Code Action to 3 4 5 Down Reactor Report i Prevent Recurrence 81-01 810101 F 69.3 A 1 LER-82-01 CF VALVEX Ramped unit down and removed unit from service due to ex-essive primary leakage. Balance move on turbine. i 81-02 810104 F 7.8 A 1 NA NA NA Ramped unit down and removed unit from service,to balance turbine. 81-03 310108 S 13.7 9 1 NA NA NA Ramped unit dovn and removed unit from service to balance turbine.- s 81-04 810109 F 8.3 A 1 NA NA NA Ramped unit-down.and: removed unit from service to balance turbine.
- /. -
n '. 81-05 810110 F 4.8 A 1 LER-82-02 CB CKTBRK Manual turbine trip / reactor trip due to loss of power to "C" station service bus when transferring to station ~ service. 1 2 3 4 F: Forced Reason: Method: Exhibit F - Jnstructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161) E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other-G-Operational Error (Explain) . ; N h Y I-S O.- 3 ' ' ~t-
- (;* a - 4 J e > d'46 e
H-Other (Explain) ., Exhibit 1,,S,ame' Source b]lO h'q';N.hyIN fkl iffh.fh. l f-f E '.: L, -}}