ML20050A457
| ML20050A457 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/24/1982 |
| From: | Mardis D FLORIDA POWER CORP. |
| To: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| 3F-0382-23, 3F-382-23, NUDOCS 8204010308 | |
| Download: ML20050A457 (3) | |
Text
.
- 3*Wo-f.N.6 %s uEh
%p,;.
'p v
M G 'iW W W M-if
%gggp e *
!\\
Rodda Power ca..a.n,"~
liECEIVEO
-9 MAR 311982w March 24,1982
- 3F-0382-23 WMw'm armin
~
File: 3-0-3-e 57*3" IO qb 7 Mr. William O. Miller, Chief N
License Fee Management Branch Office of Administration U. S. Nuclear Regulatory Commission t h nt.--------------
k,'.-Y$$kIk--------
Washington, D. C. 20555 cc Y OO O.s ~ '~~~~~~~~ ' t SUB3ECT: Crystal River Unit 3
/
Docket No. 50-302
- -. 3 f.N E D - i
~
3"3 d < W Operating License No. DPR-72 Technical Specification License Fees
- " ~ ' " '
ne w a Tj.... 3_t b $>--------
Dear Mr. Miller:
- ~ '~ ~
As stated in your letter of December 29,1981,, Florida Power Corporation (FPC) does not consider TechnicaT5pe~Elficallon Change Request No. 64, Revision 1 to be subject to license fees pursuant to 10 CFR 170.22.
We understand that the Office of Nuclear Reactor Regulation (NRR) staff considers the review of our application to be site specific and,thus, not covered by the various safety evaluations published on TMI-2 Lessons Learned. We would have expected such a review, but must state for the record, that we are not aware of one. While the safety evaluation was associated with Crystal River Unit 3 and published "on our docket", all dialogue with the staff was strictly one-sided, (e.g.,
FPC shall utilize the model technical specifications). A checklist review was performed to ensure everything NRR had already approved was appropriately represented in the license amendment. To the best of our knowledge, a specific safety review was not performed.
Those changes that FPC considered appropriate were embodied in Change Request 64, Revision 0, which was about to be submitted when we received the model technical specifications from NRR. However, we were told emphatically that NRR had already determined what was necessary and that few, if any, changes would be considered. It was suggested in a telephone conference with the NRR staff that if we continued to resist the standard approach, we would be subject to an ordered license change. Thus, we were surprised to learn of a site specific safety evaluation beyond the checklist level.
We appreciate your office's efforts to resolve this problem and, based upon yout request, a license fee of 54,000 (four thousand dollars) is hereby remitted. However, we may choose to continue this dialogue with NRR.
/WOOg s
8204010308 820324
/[
PDR ADOCK 05000302 P
PDR General Office 3201 Thirty-fourth street souin. P O Box 14042. St. Petersburg Florida 33733 e 813-866-5151
+
Mr. William O. Miller March 24,1982 Page 2 In order to avoid future misunderstar. dings, we request that your office provide a formal clarification on the matter of license fees required for NRC mandated license changes.
Your office is obviously aware of the need for this clarification and, if we may be of any further assistance, please contact this office.
Very truly yours, David G. Mardis Acting Manager Nuclear Licensing Attachment cc:
Mr. 3. P. O'Reilly, Regional Administrator
~
Of fice of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 3100 Atlanta, GA 30303 I
{
g 7,
..7,.-,
.~
3/30/82 Il0TE T0:
Jeff Bartlett, Document Control Desk (Room 016)
FROM:
Reba Diggs, License Fee Manageaient Branch, ADM-
SUBJECT:
PROCESSIllG LETTERS WITH CHECKS RECEIVED DIRECTLY BY THE LICEllSE F,EE IW AGEP.ENT BP.ANCH Please process the enclosed letter under the applicable docket and give' the following distribution under code M008:
Original of ltr to Regulatory Docket File Action Cy w/ check to,){. O. Miller, LFMB (L-233) 3 cys to applicable B' ranch of DDR or DPM 1 to LPDR 1 to PDR I am retaining the check and the following information is for your records.
Check No.:
488978 Amount:
$4,000 Date:
3/24/82 Ltr. Date:
3/24/82 Applicant:
Flarida pawe rorporation Docket No:
- n_an?
Plant:
Crvstal River 3 Thanks!
~ pd% /g/
~
Reba M. Diggs License Fee Management Branch Office of Administration 0
8 t
S I.
l
~
W*
e
-,,