ML20050A445
| ML20050A445 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/29/1982 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20050A424 | List: |
| References | |
| NUDOCS 8204010297 | |
| Download: ML20050A445 (2) | |
See also: IR 05000348/1981029
Text
.
.
.
.
.
Alabama Power Company
ATTft:
!tr. R. P. licDonald
Vice President-fiuclear Generation
P. O. Box 2641
Hinainghan, AL 35291
Ger f emen:
m
Subject:
Report ilos. [48/81-29/ and 50-364/81-32
This refers to the routine inspection conducted by f!r. W. H. Bradford of this
of fice on flovember 16 - December 15, 1981, of activities authorized by 11RC
Operating License fios. IIPF-2 and flPF-8 for the Farley facility.
Our prelininary
findings were discussed with ifr. W. G. Ibirston, Plant fianager, at the conclusion
of the inspection.
Areas exanined during the inspection and our findings are discussed in the
enclose <1 inspection repart.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, intervie.ss with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activ'ities under your license
dppear 10 Viola te f1RC requirements.
These items and references to pertinent
requirements are listed in the flotice of Violation enclosed herewith as
Appendix A.
Elenents to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the liRC's Public Document Roco unless you notify this of fice,
by telephone, within ten days of the date of this letter and submit written
application to withhold infonution contai.W therein within thirty days of the
date of this letter.
Such application iaust be consistent with the requirements
of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of flanagenent and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
1c
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
See page 2
8204010297 820325
PDR ADOCK 05000348
Q
l
~
,
_.-
-
.-.--
-
---.
_ -
--
.-- . - -
--
.-
-.
-
.
..
.
ukVe d
Alabama Power Company
2
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
<
H. O. Thrash, General fianager-Nuclear Generation
0. D. Kingsley, Jr., Manager, Nuclear Engineering
<
and Technical Services
,
J. W. ficGowan, tianager-Safety Audit
and Engineering Reviev
!
W. C. Carr, Supervisor-Safety Audit
l
and Engineering Review
W. G. Hairston, III, Plant fianager
a
i
.j
bcc w/ encl:
- )
NRC Resident Inspector
Document flanagement Branch
!
State of Alabama
l
i
a
i
t
)
k
1
.
i
!
i
~j
i
i
i
!
i
!
7
l
a
i
RII
RII
RII,
4
-$
f
b
.JR6gge:dt
VBrownlee
PJ@}llogg
1/,s/82
1/g/82
1/ /82
.
.
.
-.
.
.
.
.
.
,
.