UNITED STATES
5'
1.
NUCLEAR REGULATORY COMMISSION
,
y.
E
REGION 11
g
f
101 MARIETTA ST.. N.W.. SUITE 3100
d'
ATLANTA, GEORGIA 30703
g % . .
March 8, 1982
.%
South Carolina Electric and Gas Company
\\[
ATTN: Mr. T. C. Nichols, Jr. , Vice President
.rG
Power Production and System Operations
(
F'
P. O. Box 764
-
l , g$hs 12
Columbia, SC 29218
g
g3 3 ; p
,
kb"E
I
Gentlemen:
g.
Subject: Report No. 50-395/82-17
D
This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of
this office on February 9-12, 1982, of activities authorized by NRC Construction
Permit No. CPPR-94 for the V. C. Summer facility and to the discussion of our
findings held with Mr. J. G. Cor.nelly, Deputy Plant Manager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this . office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
o
-
~
F. J. Long, Ic
f
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosure (See Page 2)
$$$
0
OS
0
ZEoISD
.
.
South Carolina Electric and Gas Co.
2
March 8, 1982
Enclosure:
Inspection Report No. 50-395/82-17