ML20050A231

From kanterella
Jump to navigation Jump to search
Advises That Listed Documents Reviewed & Will Be Withheld (Ref 10CFR2.790)
ML20050A231
Person / Time
Site: San Onofre  
Issue date: 03/16/1982
From: Miraglia F
Office of Nuclear Reactor Regulation
To: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 8203310610
Download: ML20050A231 (2)


Text

-__

~

/

MAR 161982 W

e (o

EEC& g 7

Docket No.: 50-361/362 g

I 7193gw T

a,$$Qgun rd enn

\\

ifr. A. E. Scherer Tec y

Director of Licensing (9438-1922) g g

Combustion Engineering Q Ig 1000 Prospect Hill Road Windsor, Connecticut 06095 '

Dear Mr. Scherer:

Request for Withholding Infomation from Public Disclosure (San Onofre Nuclear Generating Station, Units 2 and 3)

Subject:

22, 1982, Southern California Edison Company By letter dated Januarysubmitted revisions to documentation concerning themal-and requested that they be withheld from public disclosure pursuant to The documents requested to be withheld were:

10 CFR 2.790.

"CETOP-D Code Structure and flodeling Methods for San Onofre Huclear Generating Station Units 2 and 3 " (CEN-160(S)-P, 1.

Rev. 1-P.

" Responses to Questions on Documents supporting SONGS 2 2.

License Submittal," (CEN-184(S)-P, Rev. 2-P)

"CPC/CEAC System Phase I Software Verification Test Report,"

3.

(CEH-176(s)-P,Rev.01)

"CPC/CEAC System Phase II Software Verification Test Report,"

4.

(CEH-173(s)-P,Rev.,02)

The January 22 letter also transmitted nonproprietary versions of these reports and affidavits which state the bases for requesting that the documents be withheld from'public disclosure.

By letters dated July 7 and November 14, 1931, we advised you that the k previous submittals of the above documents would be 7

and criteria of 10 CFR 2.790'and have determined that the above-m inspections.

douements sought to be withheld also contain trade secrets, confidential, O

N V

proprietary comercial or financial infomation.

/

We also have found at this time that the right of the public to be fully apprised as to the bases for and effects of the proposed action does not j

outweigh the demonstrated con'cern for protection of your co t

i j

9, position.

be withheld from public disclosure.

o

~

~.g s

n 7-q 3

y y

hfAR 181ggg We therefore approve your request for withholding pursuant to Section 2.790 of 10 CFR Part and are withholding the above documents from public inspection as proprietary.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this infomation to our consultants working in this area. We will, of course, assure that the consultants have signed the appropriate agreements for handling proprietary data.

If the basis for withholding this infomation from public inspection should change in the future such that the infomation could then be made available for public inspection, you should promptly notify the NRC.

Sincerely, Frank J. Miraglia, Chief Licensing Branch No. 3 Division of Licensing cc: Mr. Robert Dietch Vice President Southern California Edison Company 2244 Walnut Grove Avenue P. O. Box 800 Rosemead, California 91770 Gary D. Cotton Louis Bernath San Diego Gas & Electric Company 101 Ash Street San Diego, California 92112 DISTRIBUTION:

DOCKET FILE 50-361/362 LPDR PDR ACRS (16)

NSIC l

TERA l

LB#3 Files IE (3)

FJMiraglia HRood IJLee l

  • '"c'>

IB.f 1......0Li.t,B.f(S..DL I B #,3,,,,,,,

~~~>.I...

.J b....V.Ro,k/82od Tf\\,,

F 1ia

.....\\........... 3/ (l.2

. 3. /..(.$. /.8. 2........

out)...../..../ 82 3

..../

3

,NIC FO2M 3tS t10'80lNRCM O240 OFFICIAL RECOFiD COPY

" * P'2"