d T H E C L E V E L A N D E L E CT RIC IL L U MI N AT!?i G C O M P A fiY P o Box 5000 e CLEVELAND ohio 44101 e TELEPHONE (216) 622-9800 e ILLUMINATING BLDG.
e 55 PUBLIC SoVARE wing e B st cation in the Nation Dalwyn R. Davidson VICE PRESIDENT
.,lf:p/
SYSTE M E NGINt E R;NG AND CONSTRUCilON g5,a W,
o>
p
. L,. Mi g
March 25, 1982
_]
g 3 jggy
{_
Mr. A. Schwencer V
g:L. u u a.n c m :: yy tw waa;; u Chief, Licensing Branch No. 2 HT 3
Division of Licensing C
. 43 o
)
U. S. Nuclear Regulatory Comission
,g Washington, D. C.
20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Response to Draft SER Procedures and Test Review Branch
Dear Mr. Schwencer:
'1his letter and its attachment is submitted to provide draft responses to the concerns identified in the Draft SER for Procedures and Test Review.
It is our intention to incorporate these responses in a subsequent amendment to our Final Safety Analysis Report.
Very Truly Yours, M
Dalwy
. Davidson Vice President System Engineering and Construction DRD: mlb cc:
Jay Silberg John Stefano Max Gildner hD
.s I{
8203290453 820325 PDR ADOCK 05000440 E
-.. - - -. - -_ ~ - -
e DSER Item PTRB-1 I
Our review disclosed that'the applicants program-t for use of operating and maintenance procedures meets the relevant requirements of 10 C)R Part i
34, and is consistent with.the guidance provided i
inRegulatoryGuide1.33andANSIN28.7-1976/
ANS 3.2 with the exception that an acceptable
}
date for completion of procedures has not been.
provided. We require procedures to be available 4
about six months prior to' fuel load, in accordance with Standard Review Plan (NUREG-0800) Section 13 5.2.
4
Response
CEI commits to completing the written operating and maintenance instructions for normal and emergency plant conditions about six months prior to fuel load in accordance with Standard Review Plan (NUREG-0800) Section 13.5.'2.
i i
l I
i i
1 4
.i -
4 4
4-y-,,
y-y,-,----7
,3---.
..y, y
,__v-_-
m y_
r,-.
^*
a DGER Item PTRB-2 To date the applicant has not committed to an
- acceptable program for development of Emergency Operating Procedures to meet the requirements of IRJREG-0737, Item I. C.1.
Therefore, the staff has not determined if a Pilot Monitoring Review of Selected Emergency Operating Procedures is in accordance with SMI Action Plan Item I. C.
8 is required for the Perry Iluclear Power Plant.
Response
CEI will prepare emergency operating instruction in accordance with generic Emergency Procedure Guidelines for Boiling Water Reactors developed by General Electric and the BWR Owners Group.
In addition, the Owners Group is currently developing a set of Reactivity Control Guidelines, which will address the procedure for mitigating A'NS.
4
?
DSER Item PTRB-3 In accordance with IUREG-0737, Item I. c. 7, NSSS-vendor review of low power testin6, power ascension and amergency operating procedures is necessary to further verify adequacy of the procedures. To date the applicant has not committed-
- to a satisfactory review of the procedures by the NSSS vendor, General Electric Corporation prior-to implementation of these procedures. The staff will confirm.this review is completed prior to issuance of an operating license. -
1
Response
o CEI will provide for a review of low power testing, power ascension and emergency operating procedures by the NSSS vendor, General Electric Corporation, prior to implementation of these procedures.'
4
)-
i 4
3 a
e 4
, -,. -,