ML20049K016

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 3.7.1.2 Re Auxiliary Feedwater Pumps
ML20049K016
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/20/1982
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20049K006 List:
References
TAC-48073, NUDOCS 8203290321
Download: ML20049K016 (1)


Text

.

PLANT SYSTEMS AUX 1LIAPf FEEDWATER PUMPS LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three steam generator auxiliary feedwater pumps shall be OPERABLE with:

a. Two feedwater pumps capable of being powered from separate OPERABLE emergency busses, and
b. One feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: tiODES 1, 2, and 3.

ACTION:

t With one auxiliary feedwater pump inoperable, restore at least three auxiliary feedwater pumps (two capable of being powered from separate OPERABLE emergency busses and one capable of being powe ed by an OPERABLE steam supply system) to OPERABLE status within 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in HOT l SHUTD3WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4 . 7.1. 2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:

l a. At least once per 31 days by:

l

1. Starting ich pump from the control room, l

2'. Verifying that:

{

a) Each motor driven pucp develops a discharge pressure of >1070 psig on recirculation flow, and

, b) The steam turbine driven pump develops a discharge

! pressure of > 1000 psig on recirculation flow. i

  1. For repair efforts commencing 3/18/82 only, an additional 120 hour0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> period is allowed, ending 2240 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.5232e-4 months <br />, 3/25/82. .

MILLSTONE - UNIT 2 3/47-4 8203290321 820320 PDR ADOCK 05000336 i

P PDR

- - - -