ML20049J945

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/82-01 on 820111-15 & 0201-05.No Noncompliance Noted
ML20049J945
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/01/1982
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20049J946 List:
References
NUDOCS 8203290246
Download: ML20049J945 (2)


See also: IR 05000397/1982001

Text

_ _ _ _ .

_

m:3g

qg

y

3

-

,

.

MAR

11982

Docket flo. 50-397

)9

Q

N

$

Washington Public Power Supply System

[

IIECEi'/ED

P. O. Box 968

42

Richland,liashington 99352

IMR 2 G 1982s-

g

,_

W3R turm enn

Attention: Dr. R. G. Matlock

"*lllm st

/

Program Director

C)

4

Gentlemen:

w

Subject: flRC Inspection

This refers to the inspection conducted by fir. J. O. Elin of this office on

January 11-15 and February 1-5, 1982 of activities authorized by NRC

Construction Permit No. CPPR-93, and to the discussion of our findings held by

Mr. Elin with Mr. C. S. Carlisle and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and obser-

vations by the inspector.

Flo items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

of the date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1).

Should you have any nuestions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

gtM

PAsbp for:

B. H. Faulkenberry, Chief

g6{$$o$

Reactor Construction Projects Branch

j

3

g

Q

,,,,[///,,,,.

->

. . .RW,

f ,

[ , ,,

,

, ,,, , , , ,,,

,,, ,,,,,,,,,,, ....

, , ,,,,,...., ,,

,,

,,, ,, , ,

" *"')

. .E L I H . . . . _ . . ..D

DS . . . . . . . . . ..fAUl.K

ERRY

....... . .. ..

. . .... .. .. ..

.. . .

. . ....

..... .. .. . . .

o.u )

2/4/82

2/k/82

. .}. . . . /. ./82

/

..... .... .......

. .. ....... ......

. .,.

..

..... ............ .

........ . . ....

. . . . . . . . . . . . . . . . . .

...... . . . . . . . . . .

mac ronu m no soiwacu o2 o

OFFICIAL RECORD COPY

" " * 32n 24

l

.

-2-

gs

1 1982

l

Enclosure:

Inspection Report

flo. 50-397/82-01

cc w/o enclosure:

C. S. Carlisle, Deputy Progran Director

R. B. Glasscock, Quality Assurance Director

tec:

Si

bcc:

DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of WA (Lewis)

ResidentInspector(5)

Engleken(ltr)

-

tp eg

j

g'o

UNITED STATES

<y

s

[

h

NUCLEAR RECULATERY CDMMISSION

.-

c

REGION V

  • o,

[

isso MANA LANE, SUITE 260

%,

,e

wAtmur cnEex cAuronmA e4sse

,

MAR

1 ;gy

Docket No. 50-397

.

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention:

Dr. R. G. Matlock

Program Director

Gentlemen:

Subject: NRC Inspection

This refers to the inspection conducted by Mr. J. O. Elin of this office on

January 11-15 and February 1-5, 1982 of activities authorized by NRC

Construction Permit No. CPPR-93, and to the discussion of our findings held by

Mr. Elin with Mr. C. S. Carlisle and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and obser-

vations by the inspector.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Fublic Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

of the date of this letter.

Such application must be consistent with the

requirementsof2.790(b)(1).

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

m

.

.

B. H. Faulkenberry, Chief

Reactor Construction Projects Branch

t

\\

- . ~ ~ . . -

--

-~

- - - + . .

.

n.

.a

--

--

'A

-

I

>

,

14AR

1 1932

Washington Public Power Supply System

-2-

Enclosure:

Inspection Report

"

flo. 50-397/82-01

cc w/o enclosure:

C. S. Carlisle, Deputy Program Director

R. B. Glasscock, Quality Assurance Director

= = :_..

- ~ . .

~

--

.

. . . .

.

. . - - - _ . _ _ _