Docket flo. 50-397
)9
Q
N
$
Washington Public Power Supply System
[
IIECEi'/ED
P. O. Box 968
42
Richland,liashington 99352
IMR 2 G 1982s-
g
,_
W3R turm enn
Attention: Dr. R. G. Matlock
"*lllm st
/
Program Director
C)
4
Gentlemen:
w
Subject: flRC Inspection
This refers to the inspection conducted by fir. J. O. Elin of this office on
January 11-15 and February 1-5, 1982 of activities authorized by NRC
Construction Permit No. CPPR-93, and to the discussion of our findings held by
Mr. Elin with Mr. C. S. Carlisle and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and obser-
vations by the inspector.
Flo items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days
of the date of this letter. Such application must be consistent with the
requirements of 2.790(b)(1).
Should you have any nuestions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
gtM
PAsbp for:
B. H. Faulkenberry, Chief
g6{$$o$
Reactor Construction Projects Branch
j
3
g
Q
,,,,[///,,,,.
->
. . .RW,
f ,
[ , ,,
,
, ,,, , , , ,,,
,,, ,,,,,,,,,,, ....
, , ,,,,,...., ,,
,,
,,, ,, , ,
- " *"')
. .E L I H . . . . _ . . ..D
DS . . . . . . . . . ..fAUl.K
ERRY
....... . .. ..
. . .... .. .. ..
.. . .
. . ....
..... .. .. . . .
o.u )
2/4/82
2/k/82
. .}. . . . /. ./82
/
..... .... .......
. .. ....... ......
. .,.
..
..... ............ .
........ . . ....
. . . . . . . . . . . . . . . . . .
...... . . . . . . . . . .
mac ronu m no soiwacu o2 o
OFFICIAL RECORD COPY
" " * 32n 24
l
.
- Washington Public Power Supply Systen
-2-
gs
1 1982
l
Enclosure:
Inspection Report
flo. 50-397/82-01
cc w/o enclosure:
C. S. Carlisle, Deputy Progran Director
R. B. Glasscock, Quality Assurance Director
tec:
Si
bcc:
DMB/ Document Control Desk (RIDS)
Distributed by RV:
State of WA (Lewis)
ResidentInspector(5)
Engleken(ltr)
-
tp eg
j
g'o
UNITED STATES
<y
s
[
h
NUCLEAR RECULATERY CDMMISSION
.-
c
REGION V
- o,
[
isso MANA LANE, SUITE 260
%,
,e
wAtmur cnEex cAuronmA e4sse
,
1 ;gy
Docket No. 50-397
.
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention:
Dr. R. G. Matlock
Program Director
Gentlemen:
Subject: NRC Inspection
This refers to the inspection conducted by Mr. J. O. Elin of this office on
January 11-15 and February 1-5, 1982 of activities authorized by NRC
Construction Permit No. CPPR-93, and to the discussion of our findings held by
Mr. Elin with Mr. C. S. Carlisle and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and obser-
vations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Fublic Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days
of the date of this letter.
Such application must be consistent with the
requirementsof2.790(b)(1).
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
m
.
.
B. H. Faulkenberry, Chief
Reactor Construction Projects Branch
t
\\
- . ~ ~ . . -
--
-~
- - - + . .
.
n.
.a
--
--
'A
-
I
>
,
14AR
1 1932
Washington Public Power Supply System
-2-
Enclosure:
Inspection Report
"
flo. 50-397/82-01
cc w/o enclosure:
C. S. Carlisle, Deputy Program Director
R. B. Glasscock, Quality Assurance Director