ML20049J883
| ML20049J883 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 09/04/1981 |
| From: | Baum P PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20049J882 | List: |
| References | |
| NUDOCS 8203290184 | |
| Download: ML20049J883 (4) | |
Text
. _ _.._.
v i
MONTHLY NARRATIVE REPORT 0F OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of August 1981.
This report was prepared by the Plant Staff and is submitted in accordance with Section IX:I.l.c. of the Technical Specifications.
During the report period the reactor remained in the cold shutdown mode of operation. There were no significant events associated with the 4
operation of the Unit. There was no significant maintenance completed during the month.
1 1
1 i
I.
i 0$0hf33 PDR
. ~
OPERATLNG DATA REPORT DOCKET NO. 50-/.33 DATE 9 81 COMPLETED BY PW.GAdm TELEPilONE 7ert/43 t787 OPER ATING STAT US
- 1. Unit Name:
OM Mt.W.
AY GE w durr3 N"
- 2. Reporting Period:
A0605 T~
/981
- 3. Licensed Thermal Power (MWil:
2M
- 4. Nameplate Rating (Gross MWel:
SC
- 5. Design Electrical Rating (Net MWel:
- 6. Masimum Dependable Capacity (Gross MWel:
M
- 7. Maximum Dependable Capacity (Net MWe):
63
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasons:
ra / A A.1/A
- 9. Power Level To which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
N/d' This Month Yr..to Date Cumularise
- 11. Ilours In Reporting Period 7N 883I
/fB. S*/ 7
- 12. Number Of flours' Reactor Was Critical O
O
<a g,l '71
- 13. Reactor Reserve Shutdown flours a
- 14. Ilours Generator On Line
'3 ?, M2,
- 15. Unit Reserse Shutdown flours o
- 16. Gross Thermal Energy Generated (MWil)
/f//8ff8
- 17. Gross Electrical Energy Generated (MWlu Y
Y d,73 '5 73 7
- 18. Net Electrical Energy Generated (MWil)
_ _-111
- / 9M
- 4. S-4 7.. /2 3
- 19. Unit Service Factor o
O f/.47,
- 20. Unit Availability Factor 4/.4 %
- 21. Unit Capacity Factor (Using MDC Net) ff65'E
- 22. Unit Capacity Factor IU>ing DER Net) 44.19, _
- 23. Unit Forced Outage Rate P
V
/.9/ %
- 24. Shutdowns Scheduled Oser Next 6 Months tType.Date.and Duration of Eacht:
a/A-
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
/ M D d-II k M /A N I b -
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCI AL OPER ATION (9/771 O
r s
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETS 0.
So -/ 3 3 UNIT NAME # 8 P P n3 DATE T - R f COMPLETED BY Eddum REPORT MONT11 TELEPilONE '7o7 44 3 'L187 e.
E c
3?
"g
$ YE Licensee
[cs K
Cause & Corrective No.
Date g
gg jg&
Event gy a-3 Action to fU
$E 5
jdg Report a vi U Prevent Recurrence 6
?!-f 7 Lo 7 o2.
S 344
<;a l
M/A S's.s.smic. m o oPtcs n o a s I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions 5: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Repost (LER) File INURI:G-D Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & Ucense Examination F Administrative 5
G-Operational E ror (Explain)
Esinbit 1 Same Source (9/77)
Il Other (Explain)
s 3.'-
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
f0 -/ 33 UNIT NOY 3
DATE 9~ b81 COMPLETED llY M. bM AA TELEPflONE 7 07 - N3~Y/0 7 MONT11 t> 4 0 5T I 16 l.
DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (M We-Net i (MWe-Net )
I O
O i7 2
is 3
19 4
30 5
21 6
22 7
23 8
24 9
25 10 26 Il 27 12 28 33 29 14 30 15 3g V
16 INSTRUCTIONS On this format, hst the average daily umt power level in MWe.Nc for each day in the reportinc month. Compute to the nearest whole megawatt.
(9/771