ML20049J881

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1981
ML20049J881
Person / Time
Site: Humboldt Bay
Issue date: 09/04/1981
From: Weeks E
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20049J882 List:
References
NUDOCS 8203290183
Download: ML20049J881 (1)


Text

o 25A e

PACIFIC GAS AND E LE C T RIC C O M PANY FOW3 l

77 BEALE STREET

  • TWX 910 372 6587 JAMES o SHt9FER DEPORTMENT OF NUCLE AR PLANT OPERATIONS NUCLEAR POWER GENERAflCN September 4, 1981 Office of Management Information and Program Control U

S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-133 License No. DPR-7 Gentlemen:

Enclosed are the completed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for August, 1981.

These forms and the narrative are submitted in accordance with Section IX I.l.c of our Technical Specifications.

Sincerely, 2D&dQ E. D. Weeks Plant Superintendent Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787)

Enclosure cc:

Mr. J. D. Shiffer Mr. R. H. Engelken, Director Directorate of Regulatory Operations Region V Office U. S. Nuclear Regulatory Commission 1990 N. California Boulevard Walnut Creek Plaza, Suite 202 Walnut Creek, California 94596 1

EDWeeks:me

{/

9 8203290183 810904 PDR ADOCK 05000 R

l