MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20205C7241985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20134F6881985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program. ML20042F1441989-12-31031 December 1989 New York Power Authority Annual Rept for 1989. W/900430 Ltr ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20151N7881988-07-31031 July 1988 Rev 1 to Charpy Toughness & Brittle Transition Temp Characterization of HAZ High Hardness Zone of Indian Point Unit 2 Steam Generator Girth Weld by Gleeble Weld Thermal Cycle Simulation ML20006B4741988-05-31031 May 1988 Nonproprietary Indian Point Unit 2 Evaluation for Tube Vibration Induced Fatigue. ML20151N7821988-05-31031 May 1988 Fracture Sensitivity Study of Girth Weld 6 Repaired Configuration,Indian Point Unit 2 ML20153F9161988-04-28028 April 1988 Changes,Tests & Experiments - 1986 ML20151T4681988-01-31031 January 1988 Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness 1999-02-09
[Table view] |
Text
l2 4 ~- .
nNIT mtE 2ndian Point t' nit No. 2 DATE April 5, 1977 o
COMPIxTrD BY S. D. Julias q Performance General Supervisor Tele.#914-694-6000 -
1 O P E R A T I *3 c STATur Ext. 231 @ I.P.
I
- 1. REPORTING PPRIOD: 770301 TunOUca 770411 I CROSS nOURS 1*: RE90PTING PC'tIOD: 744 l
- 2. CURRrN LY AU non!'ED POWrR Lr"EL m t 2758 rue-NET 864*
- 1. POWER LEVEL TO WHICP RESTPICTM (IP ANY): Ione , me-NrT 4 PJFrhrr FOR REST).ICTIONS (IP A*TY)t TitIS CUMULATIVE **
MONTH YR-TO-DATE TO DATE
- 5. HOURS REACTCR WAS CRITICAI. . . . . . . ... 653.38 1896.31 15534.95 0 0 0
- 6. REAC-OR RESERVE SHUTDOw:: nouRS (s) . . ....
- 7. nOURS crNr.u TOR ON-TINE . . . . . . . ... 645.62 1865.81* 14958.14
- s. UNIT RrSERvE SnUTDOwN nouns (s> . . . .... 0 0 0
- s. CROSS THE MAL PcwER crNERATEn (Mwu) . ...l.721656 4931945 37266242
- 10. CROSS rtrCTRICAL POWER cENERATED (xwn) . 530240 1522720 11593536
- n. NET ELrctRICAL rOwr.R GrNrnArrD (run) . ...507884 1457627 11038185
- 12. REACTOP AVAIIABILITY FACTOR (1) . . . . ..
b *b 87.8 64.4
- 11. rIAnT AvAIIAn!!.!TY rACTOR m . . . . .... 86.8 86.4 62.0 14 nts: CAPACITY FACTOR M) . . . . . . .... 79.0 78.1 53.0 1s. rORCEn nuTAcr PATE (4) . . . .... 0.82 6.69 7.87
- 16. SPUTDOWUS SCltEDULED TO BFGIN IN NEXT fi MONTHS (STATE TYPE. CATE AND DUuTION Or rACuli Steam generator inspection outage (5 weeks) in April, 1977 i
1
- 17. Ir FHUTDOWN AT r.f;D Or PrPORT DrRIOD, EFTIMTED DATC OF STARTUP
- 19. PLANTS IN TEST STATUS (PRIOR TO CottMEDFIAL OPEPATION) REPORT THE rOLLOWINc3 DATE IAST DATE REASON FOR ,
rGRTCAST PCUIEVED DIrrEPINCE INITIAL CRITICALITY INITIAL ELECTRICAL PowrR GENrRA*IO'l I*b*
COMMERCI AL OPEFATION (1) RrAC"OR AVAIIABILITY rAC"OR
- POURS 9FAC+0R WAS CRITICAL N
x 100 GDOSS HOURS IN RI.PGRTING PERIOD (2) PIANT AVAILABILITY rACTOR = Pot:RS CFNFkATOR ON-LIMP N100 GkOSS HOU9S IN kEPObTING PEPIOD 4100 (3) P! ANT CAPACITY rACTOR = NET rfSCTRICAL POWER CFNFRATFD FIJRRTNTLY LICL!.50D FOWT R LP/EL x r:909S NOURS IN REPORTINt* DrRIOD (4) rORCED OUTAGE RATE = PORCED OUTACE nOURS X 100 HOURS GEt;EkATOR ON-LINE + FORCED OUTAGE HOURS (s) REACTOR RESrRVE SHUTDOWN HOURS
- THr. DUPATION IN HOURS THAT THE REACTOR WAS REMOVED FROM SERVICE FOR ADMINISTRATIVE OR OTHER REASONS BUT WAS AVAIIABLE FOR OPERATION.
(6) UNIT RESERVE SHt1TDOWN HOURS = TUE DUPATION IN POURS T!!AT THE UNIT WAS Rr>tOVED rROat l SERVICE FOR ECONort!C OR SI'tIIAR REASONS, BUT WAS
! AVAIIARIE FOR OPERATION.
O 00 g a
R DO
.. _ N U
3.- , .
UNIT Indian' Point Unit No. 2 i
DATE April 5, 1977 COMPLETED BY S. D. Julias Performance General Supervisor Tele.#914-694-6000 DAILY PLANT POWER OUTPUT Ext. 231 @.I.P.
. MONTH March, 1977 DAY AVERAGE DAILY MWe-net DAY AVERAGE DAILY MWe-net 1 823 21 823 2 827 22 841 3 839 23 829 4 803 24 833 5 640 25 833 6 638 26 834 7 637 27 831 8 637 28 833 9 706 29 833 10 827 30 837 11 464 31 828 12 0 13 0 14 0 15 82 -
16 788 17 825 18 830 19 840 20 835
. . . . .. . - . .u..,, ,
Indian Point '
+
UNIT NAME Unit No. 2 UNIT SIIUTDOWNS AND POWER REDUCTIONS .
DATE April 5, 1977 COMPLETED BY S. D. Julias REPORT MONTII March, 1977 TELEPIIONE 914-694-6000 Ext. 231 0 1.P.
METIIOD OF
, TYPE SIIUTTING DOWN -
F: FORCED DURATION TIIE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS
'i . A . 3/5/77 N.A. M.A. B: NI Cali- N.A. In-core /ex-core nuclear inst, bration calibration test.
145 3/11/77 S 93.02 B 3 Repaired leak on the seal in-jection header downstream of the seal injection filters.
146 3/15/77 F 1.45 A: High S/G 3 None Level #22 S/G 147 3/15/77 F 3.92 A: High S/G 3 None Level #21 S/G
SUMMARY
- Steam generator moisture (1) REASON (2) METHOD carryover test conducted at 100% A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL power. Average carryover was B: MAINT. OR TEST 2: MANUAL SCRAM 0.162% with no significant dif- C: REFUELING
4: OTilER (EXPLAIN)
E: OPERATOR TRAINING AND
.. LICENSE EXAMINATION F: ADMINISTRATIVE -
G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER(EXPLAIN)
'4
. _ - _ _ - _ _ _ _ _ _ _ _ _ _