ML20049J758
| ML20049J758 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 02/10/1982 |
| From: | Lang F, Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20049J759 | List: |
| References | |
| NUDOCS 8203190406 | |
| Download: ML20049J758 (2) | |
See also: IR 05000395/1982015
Text
^#
SAFEGUARDS INFORMATION
-
.
.
-
.....
. . . . ,
,
i-da 101s32
01
9
%
South Carolina Electric and Gas Company
f
'
ATTN: Mr. T. C. Nichols, Jr.
RECUf y',',
q.
Vice President, Power Production
z.
AqE '8
__.
l
and System Operations
-
-
P. O. Box 764
~%
b '* 1
ff % ,,M
%
Columbia, SC 29218
),
Gentlemen:
C>
c
o)
Subject:
Report No. 50-395/82-15
This refers to the preoperational safeguards inspection conducted by Mr. D. E.
Moore of this office on January 25-29, 1982, of activities authorized by NRC
License No. CPPR-94 at the V. C. Summer Nuclear Station and to the discussions
of our findings held with Mr. O. S. Bradham, Manager, at the conclusion of the
inspection.
Areas examined during this inspection included your physical security pregram
as implemented under the provisions of Title 10, Code of Federal Regulations,
Part 73, " Physical Protection of Plants and Materials" and the specific
requirements of your approved Security Plan. Within these areas, the
inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, performance tests, and
observations by the inspectors.
Within the scope of this inspection, no violations or deviations were
disclosed. However, two items were identified which will require resolution
prior to fuel loading.
These items are discussed in the enclosed report.
We have examined actions you have taken with regard to previously identified
inspector follow-up items.
These are discussed in the enclosed inspection
report.
The material enclosed herewith contains Safeguards Information as defined by
10 CFa 73.21 and its disclosure to unauthorized individuals is prohibited by
Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
(
Sincerely,
'
g on 3ECONTAIUS
gryncut.RDS IN70M!.ATION.
uren SEPARATIO3 THIS
F. J. Long, Acting Chief
FAG 31S DE00gIROI.I.ED.
Reactor Projects Branch 2
OO -
yl
Division of Resident and
_ _ _ _ _ . -
,
Reactor Project Inspection
KEDE78 ,%
g
w
wan InG: SAFEGUARDS INF0m'.ATId
' RE71L*N
SEc1105147 AIOMIC E513GY ACT 1954.h
O
-
TURE)eslh
-
vu Aws of IHE FROTECTION
"nih
oi
8203190406 820210
-"
(" ^ Dock
j!M
IGUARDS INFORMATLOh. l%'s%^Jii1
sixe m N3
5
c r e- o ,
,
r.RDS k.NFORMATION
.
u .t
u
South Carolina Electric and
as
FEB 10 02
.
.
.
.
-
.
Enclosures: Inspection Report No. 50-395/82-15
(Safeguards Information)
Inspection Summary
(Not Exer'pt)
cc w/ encl:
A. A. Smith, Site QA
Coordinator
0. C. Bradham, Station Manager
J. P. Harrison, Manager,
Nuclear Security
C. A. Price, Manager,
Nuclear Engineering
bcc w/ encl:
Document Management Branch
bcc w/ Inspection Summary
NRC Resident Inspector
State of South Carolina
fU 103'J.CC03;AIx3
GAC:DU:2.D3 IU?CN!ATION.
UiT'?! CEPARATION IllIS
I' AGE Is DE 'o;;;ggLtg,
b
JRog[ge
RII
C
RII
V
RII
RI
RIl)sg
DMc aire
AGibson'
Flo
DMoog my
f
02 n /82
02/j/82
025t/82
02/ps2
02py2
SAFEGUARDS INFORMATION