Forwards Addl Info Re TMI Action Items for Identification & Environ Qualification of Equipment Installed
ML20049J692
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/11/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.D.2, TASK-2.B.1, TASK-2.B.2, TASK-2.B.3, TASK-2.E.1.2, TASK-2.E.4.2, TASK-2.F.1, TASK-2.F.2, TASK-2.K.1, TASK-3.A.1.2, TASK-TM NUDOCS 8203190233
Download: ML20049J692 (6)


Text

w l,

i w

MSC00 Sin Electnc u cww 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 March 11 1982

\\

r D

Mr. H.

R. Denton, Director

/

s Office of Nuclear Reactor Regulation Ri?Cgrg 9

U.

S. NUCLEAR REGULATORY COMMISSION k

Washington, D.

C.

20555 MAQ181992m

-c

~

Attention:

Mr.

R. A.

Clark, Chief Operating Reactors, Branch 3 g

//

Gentlemen:

g DOCKET NOS. 50-266 AND 50-301 ADDITIONAL INFORMATION REGARDING ENVIRONMENTAL QUALIFICATION OF TMI ACTION PLAN EQUIPMENT POINT BEACH NUCLEAR PLANT, UNITSel AND 2 x

In Mr. Clark's letter dat-FebrMary 18, 1982 additional information was requested regarding-the identification and environmental qualification of equipmen3' installed at Point Beach Nuclear Plant since January 1, 1981 to meet TMI Action-Plan (NUREG-0737) items.

The attachment to this' letter lists new electrical equipment being installed to meet the requirrments of NUREG-0737.

Some of the equipment installed after January 1, 1981 has not been fully implemented since the new instrumentation racks and control panels associated with.this Equipment have not yet beca installed; None of the planned equipment installations

~

requires pre-implementation review in accordance with Wisconsin Electric's irterpretation of NUREG-0737, Enclosure 1.

In addition, various equipment items installed have not yet been environmentally qualified to the latest requirtments.

For example, new pressure

~

'Jand differential pressure transmitters at Point Beach are Foxboro

'N-E10 Series transmitters which are currently undergoing qualifi-cation testing to the requirements of NUREG-0588, Category I.

It is our intention to submit the environmental qualification information only after the equipment has been fully implemented and the final qualification test reports have been evaluated.

~

It is anticipated thatithis submittal can be made in' September 1982 for Foxboro transmitters.

Ah 0s q $'

B203190233 820311 PDR ADOCK 05000266 P

PDR

J M r. II.

R. Denton March 11, 1982 d'

The schedule for the installation of TMI Action Plan equipment was submitted in our letter dated September 14, 1981 regarding response to NUREG-0737.

It is our intention to update the planned NUREG-0737 implementation schedule in a submittal to be made in about a month.

s l

We would be pleased to respond to any questions you j

may have regarding this matter.

i i

I Very truly yours, 1

1

/

Assistant Vice President C. W.

Fay Attachment Copies to NRC Resident Inspector

]

C. J. Crane (Franklin Research Center) i 1

6 e

i

NEW TMI ACTION PLAN ELECTRICAL EQUIPMENT DOINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 I

NUREG-0737 ITEM SHORTENED TITLE EQUIPMENT DESCRIPTION I.D.2 Plant Safety Parameter Safety Assessment System Display Computer (EAI)

  • Auxiliary Safety Indication Panel (including installed equipment)

Instrumentation Racks (Foxboro Spec 200)

Auxiliary Instrumentation Racks (EAI) l Multiplexers (EAI)

Station Batteries (C&D)

Battery Chargers (Power Conversion Products)

Inverters (Elgar)

[

Magnetic Contactors (Square D)

D.C. Buses (Square D)

A.C.

Distribution Panels (Square D)

Air Handling Units (Battery Room)

Motor Controllers (Westing-7 house)

Terminal Blocks (Marathon)

Cable I

II.B.1 RCS Gas Vents Pressure Transmitters (Foxboro)

Solenoid Valves (Target Rock) j Electrical Conductor Seal l

l Assemblies (Conax) l l

' Electrical Penetration Acsemblies (Westinghouse) l Splices (Raychem)

Cable 1

i i

i

  • This equipment is not safety-related i

and is commercial-grade only..

~_.--....

$ NUREG-0737 ITEM SHORTENED TITLE EQUIPMENT DESCRIPTION II.B.2 Plant Shielding (See IEB 79-OlB Master List)

II.B.3 Post-Accident Sampling Solenoid Valves (ASCO)

(Sample Valves Only)

Limit Switches (NAMCO)

Electrical Conductor Seal Assemblies (Conax)

I Electrical Penetration Assemblies (Westinghouse)

Splices (Raychem)

Cable II.D.3 Valve Position Indication Safety Valve Position (Pressurizer Safeties)

Indicators (Crosby)

I Splices (Raychem)

Electrical Penetration i

Assemblies (Westinghouse)

Cable i

II.E.1.2 AFW System Initiation Differential Pressure (Flow) and Flow (S/G AFW Flow)

Transmitters (Foxboro) 2 Cable II.E.4.2 Containment Isolation Solenoid Valves (ASCO)

I Dependability (New Limit Switches (NAMCO)

Isolation Valves Inside Electrical Conductor Seal I

Containment)

Assemblies (Conax)

Splices (Raychem)

Electrical Penetration Assemblies (Westinghouse)

. Cable j

i

-.-i 4

+.1

-A

'A g.

,ms.

J 2__.e A

w.

O

. NUREG-0737 ITEM SHORTENED TITLE EQUIPMENT DESCRIPTION II.F.1 Accident Monitoring High Range Radiation Monitors (General Atomic)

Containment Wide-Range Pressure Transmitters (Foxboro)

Containment Sump Water Level Monitors (Gems Delaval)

Hydrogen Monitors (Exo-Sensors)

Electrical Conductor Seal Assemblies (Conax)

Splices (Raychem)

Electrical Penetration Assemblies (Westinghouse)

Noble Gas Monitoring (Eberline)*

Iodine and Particulate Sampling (Isokinetic Stack Sampling System)

  • Cable II.F.2 Instrumentation for Detection of Inadequate Core Cooling 1.

Subcooling Meter Reactor Coolant System (RCS)

Loop RTD's (Conax)

RCS Wide-Range Pressure Transmitters (Foxboro)

Core-Exit T/C Connectors Splices (Raychem)

Electrical Penetration Assemblies (Westinghouse)

Cable OThis equipment is not safety-related and is commercial-grade only.

. -. _ _ =.. -

i

. BUREG-0737 ITEM SHORTENED TITLE EQUIPMENT DESCRIPTION 2.

Reactor Vessel Level Differential Pressure Transmitters (Foxboro)

Compensating Thermocouples Splices (Raychem)

Electrical Penetration Assemblies (Westinghouse)

Cable II.K.1 IE Bulletins 79-05, Pressure Transmitters (Foxboro) 06, OR ( AFW Pump Suction)

Splices (Raychem)

Cable 4

III.A.l.2 Upgrade Emergency Support Pressure and Differential i

Facilities (R.G. 1.97 Pressure (Flow and Level)

Upgrades)

Transmitters (Foxboro)

RTD's (Conax)

Level Transmitters (Gems Delaval)

Electrical Conductor Seal Assemblies (Conax)

Splices (Raychem)

Electrical Penetration Assemblies (Westinghouse)

Cable Z

-