Monthly Operating Rept for Feb 1982
ML20049J681
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 03/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20049J680 List:
References
NUDOCS 8203190192
Download: ML20049J681 (7)


Text

- ._

l i

4 OPERATING DATA REPORT DOCKET NO. 50-369 DATE 1/15/82 COMPLETED BY J. A. Reavis TELEPHONE 704-373-8552 OPERATING 5TATUS McGuire #1 yone,

1. Unit Name: _
2. Reporting Period: February, 1982
3. Licensed Thermal Power dlWt): 3 411 ' s
4. Nameplate Rasing (Gross MWep: 1 220 1
5. Design Electrical Rating (Net MWe): 1 130
6. Maximurn Dependable Capacity 4 Gross MWel:
7. Maximum Dependable Capacity (Net MWe):

S. If Changes Occur in Capacity Ratings I!tems Number 3 Through 7) Since Last Report. Give Reasons:

95 Power Level To Which Restricted. !! Any (Net MWel:

10. Reasons For Resenctions. If Any:

,This Month Yr..to.Date Cumulative a

11. Ilours in Reporttng Period 672.0 1 416.0 2 160.0
12. Number Of Hours Reactor was Cntical 591.4 .1 267.1 1 998.4
13. Reactor Reserve Shutdown Hours - - -
14. Hours Gererator on.Line 587.6 1 254.7 1 300.4
15. Unit Reserve Shutdown Hours -

s - -

16. Gross Thermal Energy Generated (MWH) 1 054 504, 2 328 217 2 413 172 I* Gross Electrical Energy Generated (MWH) 331 951 782 891 811 327
13. Net Electrical Energy Generated (MWH) 308 431 732 453 751 509
19. Unit Semce Factor 87.4 88.6 60.2
20. Unit Availability Factor 87.4 88.6 60.2
21. Unit Capacity Factor IUsing MDC Nets 38.9 43.8 29.5 1 22. Unit Capacity Factor iUsing DER Net) 38.9 43.8 29.5
23. Unit Forced Outage Rate 12.6 11.4 39.8
24. Shutdowns Scheduled Over Next 6 Months iType. Date and Duration of Eaca e None
25. If Shut Down At End Of Report Penod. Estimated Date of ~,tartup: March 15, 1982
26. Umts in Test Status aPnor to Commercial Operations: Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COMM ERCIA L OPER A TION 82O3190192 820315 PDR R

ADOCK 05000369 py- >

PDR

t! NIT SiltJTDOWNS ANI) POWEll HEI)tJC110NS DOCKET NO. 50-369  :

UNIT N Ah!E McGuire 1 DATE 3/15/82 Itt'.poltT MONTil February, 1982 CO.1plETED ilY J.A. Reavis

'." \

TELEPilONE (704)373-8552 u..

- E E

-, jg 3 $ E ~; Licensee E-r, f. Cause & Currective No . Ibte c. ~ E' i js5 Event ~? e? Action to S j@ $ ~gg u itepost e <E C 5b Prevent Iteentrence e o 6

2-p 82-02-01 F --

H --

CB HTEXCH Holding at 50% power until an outage for further inspection and analysis of steam generator condition.

7 82-02-05 F 12.38 8 3 ZZ ZZZZZZ Reactor tripped d'ue to a procedure deficiency while performing a periodic test.

3-p 82-02-07 F --

ri --

CB HTEXCH Holding at 50% power until an outage fo c further inspection and analysis of stea n '

generator condition.

8 82-02-16 F 13.47 A 3 HH PUMPXX Trip of condensate booster pumps resulted in a reactor trip.

4-p 82-02-17 F --

H --

CB- HTEXCH Holding at 50% power until an outage for further inspection and analysis of steam generator condition.

1 2 .I 4 I" l'oseed Iteawn. hiethoti: Exhibit G -Instructions S. Sheduleil A I?quipinent Failure (Explain) I-h1anual for Preparation of Data II.hlaintenance of Test 2-Alanual Scrain. lintiy Sheets foi Licensee i C Itefueling 1 Autoni.itic Sciain. I? vent Iteport (l.1.'11) File (NtiltLG-D Itegulatory itestuction 4 Other (Explain) 0161) l'-Ope.ator Training & License lixainination ILAdininntrative 5 G Opeiational infor (lisplain) Esinbit I Same Sonice p>/77) 11-01her (lixplain)

-_ . _._. . . _ . . - ~__ _ _ - _ _ . _ _ . . _ . .__ _ _.

UNITSilulDOWNS AND POWER REDUC 110NS DOCKET NO. 50-364 -

UNIT NAhlE McGuire 1

^ DATE 3/15/82 i REPORT Af 0NTil February, 1982 COhtPLETED ilY J. A. Reavis TELEPilONE (704)373-F552

, 5g " i- 3 E'i 1.icensee 3-r, 'k cause & co nective No . Date g 3g j ,3 g y Event  ? $3 Avion to

$E c2 e

55g g

lleport # m'U o5' Prevent Recurrente Q

9 82-02-26 F 5.58 A 3 ZZ ZZZZZZ The loss of a 125V AC power supply

.; resulted in a unit. trip.

! 9A 82-02-26 F 53.00 B --

CB HTEXCH Began a 16-day outage for steam generator tube EC-and analysis.

1 a

t l

l

' l 2 '3 4 F: Forced Iteason: hiethod: Exhibit G -Instructions S. Scheduled A Eiluipment Failure (thpiain) 1 -Alanual fin P:cparation of Data ll- Alaintenance oi Test ' 2 klanual Scram.

~

I nt > Sheets Ior I.icensee C-Itefocling 3 Automatic Scram. Event Report II.ER) Fife INtf REG-j D Itegulatory Resisiction 4 Other (Explain) 0101)

l' Ope.ator Trainmg& l.ncense Examination i F Administrative 5 .

l G-Opciational lis tor ( E splain) . Esbibit I - Same Somee

{ p)/77) Il Other IExplain)

.UfER.4GE D AILY L' NIT POWER LEVEL DCCKETNO, 50-369 t,3;7 McGuire 1 D ATE 3/15/82 CostPLEHD BY J. A. Reavis TELEPHONE (704)373-8552

.\t0NT11 February, 1982 DAY AVERAGE DAILY POWER LEVEL DAY 1.\the-Net )

AVER AGE DAILY ?OwER ' IVEL

, ,g g g ,,y,g ,

g 540 319 g.

2 539 536 13 3 530 537 19 4 532 20 539 5 382 21 537 6

312 -a 542 534 539

,3 3

534 534 4

9 534

S 531 538 280 10

- 3 _.

II 531 ~

~.

12 524

g. 534 29 la 544 30 1s 547 31 16 342 INSTRL'CTICNS Cn t..:s for: :t, ;;st :ne y,,r g, .,gy ,3 . ; , ,, . ,,, ,t t ,, t ,,y

, e ,' , ,'-, ", '- ,-, -, -, , . Of ~':v":n 2 . . r :- .

u,.,

'".: ne2r:st .6nete .7,e;2w:::

.a - 1

, MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire Unit 1 .
2. Scheduled next refueling shutdown: June, 1983 .
3. Scheduled restart following refueling: .
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? .

If yes, what will these be?

i j

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

If no, when is review scheduled? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operati.ug procedures). N/A
7. Number of fuel assemblies (a) in the core
193 .

l (b) in the spent fuel pool: 23 .

8. Present licensed fuel pool capacity: 500 .

Size of requested or planned increase: ,

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

i 1 -

DUKE POWER COMPANY Date: March 15 1982 ,

Name of

Contact:

J. A. Reavis

DOCKET NO: 50-369 UNIT: McGuire 1 DATE: March 15, 1982 NARRATIVE

SUMMARY

Month: February, 1982 McGuire 1 began the month operating at 50% power. The unit operated at this level until February 26 at which time an outage commenced for eddy current inspection of the steam generator tubes.

During a periodic test un February 5, a procedure deficiency resulted in a reactor trip. It was returned to service on February 6 and power level increased to 50%.

On February 16, the loss of the condensate booster pumps, tripped the feedwater pump, tripping the reactor. The unit was returned to service on February 17 and power level was increased to 50%.

The loss of a 125V AC' power supply resulted in a unit trip on February 26.

Since an outage for steam generator tube inspection was to begin later in the day, the unit was not returned to service.

/

m a O

I

f, McGUIRE NUCLEAR STATION Operating Status Report

1. Personnel Exposure For the month of January no-individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2. The total station liquid release contribution to whole body dose for January has been compared with_the Technical Specifications annual value of 3 mrem; the total release for January was less than 10 percent of this limit.

The total station gaseous release contribution to any organ dose for January has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for January was less than 10 percent of this limit.

., -,- -