Forwards Listing of Changes,Tests & Experiments Completed During Feb 1982
ML20049J342
Person / Time
Site: Quad Cities  
Issue date: 03/01/1982
From: Kalivianakis
COMMONWEALTH EDISON CO.
To: Case E
Office of Nuclear Reactor Regulation
References
NJK-82-104, NUDOCS 8203150136
Download: ML20049J342 (4)


Text

i

@ Commonwealth Edison Ouid Citi;s Nucbir Pow;r St tion 22710 206 Avenue North Cordova, Illinois 61242 Telephone 309/654-2241 i

\\[%,1, c.,

/\\

cjji

~

27

?,y y NJK-82-104 li-0

~

q\\ g@)6 9

~~

$:%[e $

g%g g

'}

k' tiarch 1,1982

'6 i m ffr. Edson G. Case, Deputy Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear ?!r. Case:

Enclosed please find a listing of those changes, tests, and experi-ments completed during the month of February, 1982, for Quad-Cities Station Units 1 and 2, DPR-29 and DPR-30.

A summary of the safety evaluation is being reported in compliance with 10 CFR 50.59.

Thirty-nine copies are provided for your use.

Very truly yours, COMMONWEALTil EDISON COMPANY QUAD-CITIES NUCLEAR P6WER STATION

/

/'

/'//' ta/.9/if tY }

/

N. J. Kalivianakis Station Superintendent bb 00l Enclosure y

cc:

T. J. Rausch lI 8203150136 820301 PDR ADOCK C5000254 R

PDR

F r

~

s M-4-2-77-47 RCIC Automatic initiation Pushbutton Description The installation of the RCIC Automatic initiation Pushbutton will provide a manual fast start capability of the RCIC System, should the need arise, decreasing the time involved from 10 minutes to 20 seconds. The installation consisted of wiring a pushbutton actuator on the 902-4 panel, in parallel with the existing los': for Reactor vessel low low water level.

Evaluation This modification will provide a marked decrease in the system initiation time to allow faster manual actuation of the system.

To prevent accidental initiation, a plexiglass enclosure was Installed around the pushbutton and the switch was wired with a double set of contacts in series to prevent DC arcing. Since existing components of the RCIC System will not be altered, the margins of safety as defined in the Technical Specifications will not be af fected.

i 4

9 i

s 1

l l

4

'1 1

5 4

,,,----.,-n--,-,.~n-m

- - -... ~ - -

~*

M-4-1/2-81-23 1/2 Diesel Generator Bus 13-l/23-1 Tie Description The modification allows the 1/2 Diesel Generator to simultaneously feed Bus 13-1 and Bus 23-1.

Since November 1981 when a leak was found in the underground pipe from RHR Service Water Pumps I A and 18, the 1 A RHR Heat Exchanger has been fed by a crosstic from pumps 2A and 28.

If, with no of f-site power available, RHR is needed on Unit One and the number i Diesel Generator is inoperable, then RHR Pumps I A or 18 and RHR Service Water Pumps 2A or 23 will be requi red for the l A RHR Heat Exchanger.

The 1/2 Diesel Generator will feed Bus 13-1 (RHR Pumps l A or IB) and Bus 23-1 (backfeeding Bus 23 to RHR Service Water Pumps 2A or 28) thus allowing use of the 1 A RHR Heat Exchanger.

The breaker control handles locally on the buses have been rewired so that they will defeat the 1/2 Diesel Generator to Bus 13-1/23-1 interlock, allowing both breakers to be closed at the same time.

Evaluation The complete redundancy of RHR and RHR Service Water Pumps as analyzed by the FSAR is unchanged by this modification.

A worst-case situation as analyzed by the FSAR requires one RHR and one RHR Service Water Pump for each unit. The modification does not reduce the availability of the minimum required RHR Service Water System.

The reduction of RHR Service Water Pumps from 8 to 6 does not affect the safety margin, since only one will be operated per Diesel Generator.

M-4-2-80-10 Modi fy HPCI Control Power Feed Description This modification corrected a cable separation violation found in response to IE Notice 79-32. The HPCI back-up control power feed cables were removed from Division 11 cable trays and re-routed in Division I cable trays.

In addition, the HPCI control circuitry was modified to add the following to the DC automatic throwover scheme:

1)

Motor Gear Unit 2)

Motor Speed Changer

3) Turbine Stop Valve Reset 4)

Drain Valve Control Circuits 5)

Power to Turbine Trips

6) Power to Logic Circuitry The change was accomplished by adding a relay in parallel with the existing throwover relay.

Evaluation This modification increases the reliability of the HPCI System and ensures that it will operate as postulated in the FSAR.