Monthly Operating Rept for Feb 1982
ML20049J301
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/09/1982
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20049J299 List:
References
NUDOCS 8203150003
Download: ML20049J301 (8)


Text

AAAmaaAa.

. a..<.,.....

OPERATIN3 DATA REPCRT DOCKET NO. 50 - 277 DATE MARCH 9, 1982 COMPLETED BT PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPH ON E (215) 841-5022 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 2 l NOTES: UNIT 2 EXPERIENCED l

g g

2. REPORTING PERIOD: FEBRUARY, 1982 l

ONE LOAD REDUCTION l

= _ _ - -...____

g

3. LICENSED THERM AL POWER (MWT) :

3293 l

AND BEGAN ITS FIFTH I

g 4.

NAMEPLATE RATING (GROSS MWE) :

1152 l

REFUELING OUTAGE.

l g

g

5. DESIGN ELECTRICAL RATING (WET MWE):

1065 l

l g

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1098 l

l g

g

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1051 l

l 8.

IF CH ANGES OCCUR IN CAPACITY RATINGS (ITEMS BUMBED 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANT (NET MWE) :
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YB-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 672 1,416 67,104
12. NUMBER OF HOURS REACTOR WAS CRITICAL 457.2 1,182.0 50,925.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 455.9 1,167.1 49,623.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MwH) 1,187,158 3,143,292 144,366,608
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 381,020 1,009,650 47,513,420
18. NET ELECTRICAL ENERGY GENER ATED (MwH) 365,256 970,068 45,560,803
19. UNIT SEEVICE FACTOR 67.0 82.4 74.0
20. UNIT AVAILABILITY FACTOR 67.8 82.4 74.0
21. UNIT CAPACITY FACTOR (USING MDC NET) 51.7 65.2 64.6
22. UNIT CAPACITY F A CTOR (USING DER NET) 51.0 64.3 63.8
23. UNIT FORCED OUTAGE RATE 0.0 2.7 8.0
24. SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TY P3, D ATE, AND DURATION OF EACH):

REFUELING / MAINTENANCE, STARTED 2/20/82, 700RTEEN WEEKS

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIML?ED DATE OF STARTUP: 5/30/82
26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL O?ER ATION) :

FORECAST ACHIEVED INITIAL CRITICALITY CTRICITY 8203150003 820309

- - - " " ~

" " " ~ -

PDR ADOCK 03000277 R

PDR JPERATION

_--- u m uM M u a A A 11

  • 1 L N..o

-wO-.-~

OPERATIN3 pita REPORT DOCKET No. 50 - 278 DATE MARCH 9, 1982 COMPLETED DT PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 3 l NOTES: UNIT 3 EXPERIENCED l

g g

=___

2. REPORTING PERIOD: FEBRUARY, 1982 l

ONE LOAD REDUCTION l

g

3. LICENSED THERMAL POWER (MWT) :

3293 l

AND ONE OUTAGE.

l g

4.

NAMEPLATE RATING (GROSS MWE) :

1152 l

l g

l S. DESIGN ELECTRICAL RATING (NET MWE):

1065 l

l g

l

6. MAIIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098 l

l g

7. MAXIMUM DEPENDABLE CAPACITY (NET MNE) :

1035 l

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NU5BER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO NHICH RESTRICTED, IF ANY (NET MNE) :
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HuuRS IN REPORTING PERIOD 672 1,416 63,000
12. NUMBER OF HOURS REACTOR WAS CRITICAL 611.5 1,355.5 46,842.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 597.1 1,341.1 45,567.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,913,098 4,291,344 130,982,866
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 644,680 1,446,830 42,835,750
18. NET ELECTRICAL ENERGY GENERATED (MWH) 624,826 1,403,097 41,113,570
19. UNIT SERVICE FACTOR 88.9 94.7 72.3
20. UNIT AVAILABILITY FACTOR 68.9 94.7 72.3
21. UNIT CAPACITY FACTOR (USING MDC NET) 89.8 95.7 63.1
22. UNIT CAPACITY FACTOR (USING DER NET) 87.3 93.0 61.3
23. UNIT FORCED OUTAGE RATE 11.1 5.3 7.8
24. SHUTDOWNS SCHF.NILED OVER NEXT 6 MONTHS (TY PE, DATE, AND DUR ATION OF EACH) :

2 5. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED D ATE OF STARTUP:

26. UNITS IN TEST STATUS (b 610B TO COMMERCIAL OPERATION) :

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

_... a AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE dARCH 9, 1982 COMPANY PHILADELPHIA ELECTRIC COMPANY

-W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION

-GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH PEBRUARY 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MW E-N ET)

(M W E-N ET) 1 840 17 798 2

835 18 796 3

830 19 718 4

827 20 0

5 804 21 0

6 680 22 0

7 846 23 0

8 819 24 0

9 822 25 0

10 819 26 0

11 812 27 0

12 817 28 0

13 810 14 809 15 803 16 d00

c

-- x AVLRAGE DAILY UNIT POWER LEVEL DOCKET No. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE MARCH 9, 1982 COMPANY PHILADELPHIA ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CllARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH FEBRUARY 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M WE-N ET)

(MWE-NET) 1 1069 17 1081 2

1067 18 1081 3

1067 19 1081 4

1066 20 1078 5

1072 21 1079 6

63 22 1076 7

0 23 1078 8

0 24 1077 9

531 25 1075 10 1046 26 1075 11 1031 27 1079 12 1003 28 1078 13 852 14 1061 15 1076 16 1061

?

D D

0 UNIT SuUTDOwNS AND eOwER REDUCTIONS DOCKET No. so - 277 UNIT NAME PEACH BOTTOM UNIT 2 0

=------

DATE MARCH 9, 1982 rsILADEtPiiA

~'

O

"EtEcTRiCCosPANI

-~

REPORT nONTa FEsRUARr, 1982 ConPLETED nI W.M.ALDEN O

ENcINEER-IN-CaARcE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR O

TELEPuoNE (215) 8=i-so22


=-

l l TYPE l DURATION l REASON l SHUTTING DONNI EVENT l CODE l CODE l ACTION TO N.i DATE i (i) i (a URS) i (2) i REACTOR (3) i REPORT e i

(a) :

(s) i O

PREVEN 3_ reg 3RRENCE

=

i i

I i

i l

I I

i 2 i 820205 i S I 00.0 l

B 1 4

l NA l HF l HTRICN I LOAD REDUCTION TO INVESTIGATE TUBE LEAKS ON O

I l

l l

1 l

l l

l CONDENSER WATER BOI '2A' AND REPAIR LEAKS.

I 1

1 1

1 1

i i

I 3 1 820219 l S I 216.1 l

C l 1

l NA l RC i FUELII I SHUTDONN FOR REFUEL OUTAGE.

O i

i i

i i

i i

i i 216.1 I

I l

l l

1 O

O (1)

(2)

(3)

(4)

F - FORCED REASON METHOD EIHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPHENT FAILURE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DATA O

B - nAINrENANCE OR TEST 2 - nANUAt SCRAn.

ENTRr SuBETS roR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EIPLAIN)

FILE (N U R EG-0161)

O E - oPERATOs TRAINING + LICENSE EIAeINATION F - ADRINISTRATIVE (5)

G - OPERATIONAL BRROR (EIPLAIN)

O a - oTnER (EIPtAIN)

EIuIsIT I - SANE SOURCE O

,O bO' J.

0 t

I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 9

UNIT NAME PEACH SOTTOM UNIT 3 DATE MARCH 9, 1982 I

R EPORT MONTH FEBRUARY, 1982 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY I

B.M.ALDEN.

ENGIN EER-IN-CH A RGE NUCLEAR SECTION I

GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 I

l

[

]

l l NETHOD OF l LICENSEE lSYSTE3lC05PONENTl CAUSE AND CURRECTI E i

ITYPEl DURATION lREASONISHUTTING DOWNl EVENT l CODE l CODE I ACTION TO' NO.l DATE I (1) I (HOURS) l (2) l REACTOR (3) l REPORT s I (4) l (5) l PREYENT RECURRENCE

)

I I

I I

I I

I I

I 4 l 820206 l F I 74.9 l

1 l 3

l NA l EA l IIIIII l SCRAR CAUSED BY FAILDRE OF TR ANSHISSION LINE

()

l l

l l RESULTING IN TRIPPING OF NO.1 TRaWSFORRER.

I I

I I

I I

I I

I 5 I 820212 l S 1 00.0 l

H l,

4 l NA l

RC l ZZZZZZ l LOAD REDUCTION FOR CONTROL ROD PATTERN I

l l

i l

l l

l l

l ADJUST 5ENT.

1 I

l

-- 1 1

1 I

I I

l l

l 74 9 I l

l l

l l

g)

O

[)

(1)

(2)

(3)

(4)

F - FORCED REASON METHOD EIBIBIT G - INSTRUCTIONS O

S - SCHEDULED A - EQUIPMENT FAILDRE (EIPLAIN) 1 - MANUAL FORnPREPARATION OF DATA B - BAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFDELING 3 - AUTO 5& TIC SCRAR.

EVENT REPORT (LER)

()

D - REGULATORY RESTRICTION 4 - OTHER (EIPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE BIARINATION F - ADRINISTRATIVE

()

(5)

G - OPER ATIONAL ERROR '(EIPLAIN)

H - OTHER (EIPLAIN)

EIMIBIT I - SAME SOURCE O

O

() '

4 O

~'

Docket No. 50-277 Attachment to Monthly Operating Rep /

ort For February, 1982

\\

REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 2 2.

Scheduled date for next refueling shutdown:

refueling bogan February 20, 1982 l

3 Scheduled date for restart following refueling:

fa l

May 30, 1982

4. Will refueling or resumption of operation thereafter require a teahniaal specification change or other 1,ioense amendment?

l Yes.

If answer is yes, what,'in general, will h as be?

Technical Specifications to accommodate reload fuel.

l Modifications to reactor core operating limits are expected.

5 Scheduled date(s) for submitting proposed licensing action and supporting information:

February 24, 1982 6.

Important licensing considerations assoodated with refueling, e.g.,

i l

new or different fuel design or supplier, unreviewed design or perfozmance analysis methods, significant changes in fuel design, new operating procedures:

l None expected.

7 The number of h1 assemblies (a) in h oore and (b) in h spent fuel storage pools 1

(a) Core - 764 h l Assamblias (b) Fuel Pool - 910 h 1 Assemblies 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The opent fuel pool stcrase capacity has been relicensed for 2816 h 1 assemblies.

9 h projected date of the last refu=14=

that can be discharged to the spent fuel pool assuning the present licensed capacity.

t September, 1990

Dockut No. 50-278 Attachment to Monthly Operating Report For February,1982l REFUELING INFORMATION 1.

Name of facility:

Poach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

March 12,1983 3

Scheduled date for restart following refueling:

April 24, 1983

4. Will refueling or resumption of operation thereafter require a teahnia=1 apacification charige or other license m'a~1= ant?

Yoa.

If au:;wer la yes

  • what, in 6eneral, will these be?

Technical opecification nhanges to acon = ~ late reload fuel.

Modifications to reactcir core operating limita are expected.

5 scheduled date(s) for submitting proposed licensing action and supporting information:

December 17, 1982 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or porformance analysis methods, significant changes in fuel design,

{

new operating procedures:

j wone - ted.

1 7.

The number of fuel assemblies (a) in the core and (b) in the apent f

fuel storage Pool:

j i

Core - 764 Fuel Assemblieu l

b Fuel Pool - 928 I m diated Fuel Assemblies 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested j

or la planned, in number of fuel assemblies:

n' The spent fuel pool storage capacity has buen relicensed t

j for 2816 fuel assemblies.

d a

l 9

The projected date of the last refueling that can be diachar6ed to l :

the spent fuel pool assuming the present licensed capacity:

September,1991 1

L

8 PEACH BOTTOM ATOMIC POWER STATION NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES FEBRUARY 1982 OPERATIONS UNIT 2 The unit began the month at 82% power in extended core fl.ow coast down operation.

Or. February 5, load was reduced for several hours to investigate and repair condenser tube leaks.

The unit was removed from service late on February 19 to begin the scheduled refueling, maintenance and major modification outage.

The reactor vessel head was removed on February 22 and fuel transfer to the fuel storage pool commenced on February 26.

UNIT 3 The unit began the month at full power.

On February 6, the unit tripped on loss of the 3 start-up feed.

The 3 start-up feed loss was due to a burned-off lead on the 175 breaker in the 220 KV yard.

The unit was returned to service on February 9 and reached full power on February 10.

A load drop to 650 MWe was taken late on February 12 for

' control rod pattern adjustment.

Full load was attained early on February 14.

1 The High Pressure Coolant Injection system was removed from service for approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on February 18 for the repair of small steam and water leaks.

The unit ended the month at full power.

/'

/

b

-