ML20049J129
| ML20049J129 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 03/05/1982 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML20049J130 | List: |
| References | |
| NUDOCS 8203120122 | |
| Download: ML20049J129 (1) | |
Text
__
-am gka atCg o
f y
'o, UNITED STATES y }^...
l',g NUCLEAR REGULATORY COMMISSION
'. E WASH!NG TON, D. C. 20555 i
o,
'S
%, '/ /
March 5, 1982
....+
to to Ah
- y'
/
k$
!?,i
^
':D sq a e h, (?,I332}g-4 50-344 Trojan
.1 L S}
"~
p.
p Chief, Document Management Branch, TIDC'N/7%3 7 6 "
MEMORANDUM FOR:
5 i
FROM:
Director, Divison of Rules and Records, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The submitter of the attached document has expressed no desire to withhold any information contained therein. Therefore, this material may now be made publicly available.
AV[ ', f %. 7, 7
J. M. Felton, Director Division of Rules and Records Office of Administration
Attachment:
As stated l
l l
4 P
8203120122 820305 PDR ADOCK 05000344 F
pon
f, M ar: Se v a Eec c i
~
TROJAN NUCII.AR ?I. ANT Transsi::al No.
v oni Copy No. 81 thru 89 February 18, 1982
. )
ATTN: HR. ROBERT A.
CLARK DIRECTOR OF NUCLEAR REACTOR REGULATICMi 0:
US NUCLEAR REGULATORY COMMISSION 4
WASHINGTON, DC 20555
//
3~
RECEtVED g/_L./
k MAR 0 21982* {4 aune usansuusse TACM:
s7 A. M. ?uzav meer mammen a
~
6 nos g
SU3JFC :
Troian Nuclear Plant E=ertencr ? ccedures N
Inclosed are changes :o your copy of Volume 4, See:ica 3 of -de Trojan Plan: Operacing Manual. These pages are to be inser:ed in your =anual in accordance vi-3 he attached instructions.
Please acknowledge receipt by ec= placing :he lover portion of this ::ans-
=1:tal and return 1: to the address indicated.
AMP Ac:achsen:
February 18, 1982 Copy No. 81 thru 89 Transmittal No.32-001 Acknowlede=en:
I hereby acknowledge receipt of the changes :o the Trojan Plant Operating Manual Emergency Procedures, Volume 4, Section 3.
1+
t2<ra
- + 5 i d I )
l Signature of Copy Holder
/
Date l
t gi c ini c i ri Return To:
E Office Supervisor gg g Trojan Nuclear Plant
?. O. 3cx 439 b
Rainier, OR 97048
.m
(..
REGblATuPf INFORvaTION DISTRIBUTION SYSTE9 (RIOS)
ACCESSIUM NoA:=?^?^30;^;
OvC.DATE: 82/02/18 NCTARIZED: nc 00CKET a FACIL:50-344 Tro.ian 4uclear Plant, Portlanc General Electric 0500034a AUTH.NAME AUTkUR ArFILISTION PUZEY,A.N.
Portlano General Electric Co.
RECIP.NAME RECIPItNI AFFILIATION CLARn,R.A.
Office of Nuclear Peactor Reculation, Director SU6 JECT: Forwards Central Files version of revisec emereency response plan implementino procecures,inclucing Procedures EP-13 re eersonnel monitorina 6 cecontamination & EP-lo re drills &
exercises. Receipt form & instruction sheet enc 1.
f DISTRIBUTION CODE: X005S. COPIES RECEIVED:LTR _l ENCL lk SIZE: Jdhh_'.I.1___
TITLE: Emero Plan (CF Avail)
NOTES:
HECIPIENT COPIES RECIPIENT COPIES 10 CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL ACTION:
ORo 83 BC 1
0 TRAMMELL,C.
01 1
1 INTERNAL: ADM/ORR Od 1
1 Od d
1 IE/DEP DIR 1
0 IE/0EP/EP06 00 1
1 IE/DEP/EPLB 03 3
3 NRR/OSI/AES 1
1 NRR/OSI/RAB 1
0 REG FILES 07 1
1 TOTAL NUuBER OF COPIES NEuu1 RED: LTTR 14 ENCL 10
_