ML20049J042
| ML20049J042 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 02/23/1982 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Reed C COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8203110412 | |
| Download: ML20049J042 (2) | |
Text
_
DISTRIBUTION:
l Docket File bcc: TERA l
LB#2 File NSIC FEB 2 3 1982 DEisenhut/RPurple NRC PDR RTedesco Local PDR l
ASchwencer ACRS (16)
ABournia Dick d lips U b 373 ?
EHylton sand: ( S 374i D Woodhead, OELD m
g,I s
0I&E N
Region III h\\
^
l Cordell Reed Resident Inspe fye s i \\
Vice President, Nuclear Operations SHanauer C.
N L.s I
I'bl
,h*ae&JIS82 l
~
Commonwealth Edison Company RMattson P. O. Box 767 HThompson g
MP g.
Chicago, Illinois 60690 RVollmer RHartfield, MPA YT
'/Q
Dear Mr. Reed:
7 REVIEW OF LASALLE'S INDEPENDENT DESIGN VERIF l
sT i
SUBJECT:
In a letter from Commonwealth Edison Company dated January 29, 1982, your program specification that will be performed on LaSalle for the independent design verification was addressed.
In this letter you requested the NRC staff's comments in order that they may be incorporated into the program.
We have reviewed this specification and find it acceptable with the exception that we disagree with the statement that "The electrical aspects of the design do not require review because they are verified during preoperational and startup testing." We believe that all safety-related electrical equipment components presently installed in the system covered by the design verification program must be assessed independently e'
to assure that their mechanical and structural design requirements have been met. This will net be verified during preoperational and startup listing. Therefore, we require that these electrical equipment / components be included withir. the scope of the design verification program.
In f
addition, we had some minor comments that were communicated by telephone to your personnel (L. DelGeorge).
Except for the above, we essentially s
find that the progcam meets our requirements.
Sincerely, l
Original signed by Darrell G. ElSeldlut i
l Darrell G. Eisenhut, Director Division of Licensing cc: See next page h
DL:
2/PM DL:I
( BC..... '..............
DE:
DL:
2 D
0/L
- mna,
,,p,Ef...,,,.........
,,,R,,,,,,,,s,,c,g,,,,,,,R,,,,,,,,,e,p,,,,,
.AB,p,,,,,,,,a,;,9,t,
,,A,Sc,,,,,,,,cg,t,
,s,,
,,g,,,,
e u
.o
= >
2ma2 9 d<at
. 2dres2....... g/..p'.a2........,. 2Ba.e.2....
8203110412 820223 PDR ADOCK 05000373 OFFICIAL RECORD COPY uso m e -au-m A
4 e-Mr. Louis 0. De1 George Director of. Nuclear Licensing Commonwealth Edison Company P. O. Box 767 Chicago, Illinois 60690 cc:
Philip P. Steptoe, Esquire Suite 4200 One First National Plaza Chicago, Illinois 606.03 Dean Hansell, Esquire Assistant Attorney General 188 West Randolph Street Suite 2315 Chicago, Illinois 60601 Roger Walker, Resident Inspector LaSalle NPS, U.S.N.R.C.
P. O. Box 224 Marseilles, Illinois 61364 k
8 i
r S
F i
i I
D
. -'