ML20049H767
| ML20049H767 | |
| Person / Time | |
|---|---|
| Site: | 07000025 |
| Issue date: | 02/23/1982 |
| From: | Norderhaug L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Rosalyn Jones ROCKWELL INTERNATIONAL CORP. |
| References | |
| NUDOCS 8203030534 | |
| Download: ML20049H767 (2) | |
Text
._.
, SAFEGUARDS pFORMAff0N y
y s
d FEB 2 31982 Docket No. 70-25
~
8:,%oe g'-
Energy Systems Group
{
Rockwell International i
8900 De Soto Avenue N
l Canoga Park, California 91304 y
Attention: Mr. R. G. Jones i
Vice President and Controller Gentlemen:
Subject:
tRC Inspection This letter refers to the routine safeguards inspection of your activities authorized under tRC License No. SNM-21 conducted by Mr. D. W. Schaefer j
of this office on February 16-19, 1982.
It also refers to the discussion of our inspection findings held by the inspector with you and members of l
your staff on February 19, 1982.
The inspection included examination of activities related to your program j
for physical protection against radiological sabotage and against theft
~
of special nuclear material in accordance with applicable requirements of Title 10, Code of Federal Regulations, Part 73 " Physical Protection of Plants i
l and Materials," your Security Plan, and pertinent license conditions pertaining to physical protection as described in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and records, interviews with facility personnel, and observations by the inspector.
Withinthescopeofthisinspection,oneitemofnoncompliancewasbserved.
Based on the results of this inspection it appears that one of your activities was not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.
Pursuant to the provisions of 10 CFR 2.201 you are required to respond as indicated therein.
In accordance with S ction 2.790(d) of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, documentation of the findings of
,. C [U your safeguards and security measures are exempt from public disclosure;
/ g \\ d, ( -
therefore, the enclosures to this letter, and your response to the itera listed in the enclosure to this letter will not be placed in the Public Document Room and will receive limited distr %iition.
/
ELOSURE 00tfTAINS SAFEGUARDSTMwcasAvrna, omce)
RV/dotd 045 W
UPON SEPARATIoT THIS
"" "$CHAEFEft"'5CNU$TER""NORDERHAUG"
' ' ' "" """" ? AGE ISDFw= &f.rm;
,,,, _ p
""""yjyrigg "fyWygr" yj EGUARDS1NFORMATION~
' ~ ' ' ' " "
8203030534 820223
"~' '
Energy Syste.2 Group pg ;
We have determined that the enclosures so designated contain Safeguards Information and therefore are subject to the controls of 10 CFR 73.21.
The responses directed by this letter and the accompanying flotice are not subject to the clearance procedwet of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, j
+.
LeRoy R. Norderhaug, Chief Safeguards Branch
Enclosures:
A.
Appendix A - Notice of Violation B.
Inspection Report No. 70-25/82-01 (IE-V-483) cc w/ enclosures:
Dr. M. Renley, ESG bcc:
DMB/ Document Control Desk (RIDS)
Distributed by RV:
RHE (w/o enc B)
A. Johnson (w/o enc B)
State of CA (w/o enclosures)
LFMB (w/o enclosures) t
_