ML20049A782
| ML20049A782 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 09/23/1981 |
| From: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rich Smith VERMONT YANKEE NUCLEAR POWER CORP. |
| References | |
| NUDOCS 8110020266 | |
| Download: ML20049A782 (2) | |
Text
-
SEP 2 31981 Docket No. 50-271 to Vermont Yankee Nuclear Power Corporation 47
- A E
C-ATTN:
Mr. Robert L. Smith g7 Licensing Engineer 2 g 7
A 7g 1671 Worcester Road 3-4/
Framingham, Massachusetts 01701 i
Gentlemen:
\\
Subject:
Management Meeting Y
i This letter confirms the management meeting to be held at Vermort Yankee Nuclear Power Plant at 1:30 P.M. on September 29, 1981 to discuss the regulatcry performance of your licensed facility as noted in the enclosed agenda. Arrange-ments for this meeting were discussed with Mr. J. P. Pellitter of your staff on September 11, 1981.
No reply to this letter is required; however, if you should have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely, 1
(Q %d-ff Ronal@C. Haynes Director
Enclosure:
Agenda for Vermont Yankee Nuclear Power Corporation Management Conference cc w/ encl:
Mr. W. P. Murphy, Plant Superintendent Mr. W. F. Conway, President and Chief Operating Officer Mr. E. W. Jackson, Manager of Operations Mr. L. H. Heider, Vice President Mr. D. R. Pike, Manager of Quality Assurance Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
((Of NRC Resident Inspector State of New Hampshire 5 ' lL State of Vermont I
bCc w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational pport section (w/o encl)
RI:RPS 1A RI PB#1 RI:DR&PI R
EPAIR RI:D QJOR d
Brunner St stecki A
%l/
Hay 9////81 9/ /81 9/\\f/81 9
/81 9/g)/81 0110020266 810923 0FFICIAL RECORD COPY PDR ADOCK 05000271 P
ENCLOSURE Agcada for Vermont Yankee Nuclear Power Corporation hanagement (pgference September 29, 1981 at 9:00 A.M.
I Arrive on site - 5:00.\\.M.
II Facility Tour - 9:30 - 11:30 A.M.
III Lunch IV Opening Remarks - 1:30 P.M.
R. C. Haynes, Director USHRC, Regior !
V Discussion of Evaluation Topics j
R. M. Gallo, Chief, RPS 1A a.
Enforcement History b.
Inspection Findings c.
Reportable Events d.
Performance Evaluation VI Closing Remarks OFFICIAL RECORD COPY e