Requests temporary,one-time-only,Tech Specs Change for Subj Facil to Extend Inaccessible Inspec Period Thru 781004 Due to Continuing Sys Capacity Shortage Caused by Forced Maintenance Outage
ML20049A136
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/20/1978
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20049A135 List:
References
NUDOCS 7811220180
Download: ML20049A136 (3)


Text

..

u s

e/;;

1e

)_c.l3 g g /3 io g.

[

J um., 3 %, 3. pp O.rm y

I

?

FILE: MG 3$14(3,'.

  • SeptemberJ0s IMS SERIAL: CD-75--2548 Office of leuclear bactor Engulattan ATTENTION-Mr. Thous A. Ippolito, Chief Operatir,g Paactors F>rmac.h Ec. 3 thited States 16xisar legv.latory Commission Etahingcoo, D. C.

20555 FXNNICK STIAM ELECTER; TLGir, tiNIT NO.1 DOC D T. m. 50-325 LICDZ5E W, DFE-TI Elifl0tfRST FORl7FJCWICAL SPRfmuf.hTION CEAEE W2 Daar Mr. Ippoliro; la scecrumce with Axecdent No, i> tr< Facility Lirenne No. DF?Al lanuai Segreskr 13, 1973, Brunsrfd Tuit 1 att shut down by

~

Septesber 24,197B, to irapect the inaccessibh Kvhw11c annbhers in the Unit i drrnll. Erwe of a ecutinuing ryetem capacity shortar caused by the ned to extend a forced :r.sintecertee mreAge on Brunavid Unit. 2 in ordsr to coatinua teating of the jn tucp riser nais ends, Carolica Pwer & L1gic Cccepray la requesting c temporary, one-tim.ly, Technical $pcificntiur channe for Unit 1 to gn.end cha inaccessible suuhber inspctjan period for an Additional im days through October 4, 1978.

The rusoce for roquesting this ch/mp are ex follava:

1..

3rcaswick Unit 2. had to be abut down by a -ar-r=1 scram on Septerher 6, 1978, because of high chlorides in the restite water.

High chineides wars caused by madenser tube 1==W *1ch were a result of d.tmage

~

caused by a bimwn utraction steam expanelee belle =*.

During the repair of this Annage. the decision was made to conduct testa ca Unit 2 jet pump riser safe ends, as a ree-alt of acperience te the Duane Arnold Flant where cracks were discoured au jet pump riser j

safe -nde.

The celief shich we are requesting will provide auf-firiant Mma to couplete our cesting on the Unit 2 safe ends and j

l take rhta unit to 50 percent power befor= abutting down Unit 1.

t I

2.. With our paesent load predictions, we estimate that the reserve levn1 on our dyateR BRT drUp as 1DW $8 150 Mkl withcmt additional f0TCEd l

outages if the Brunswick Unit 1 uwr= shut down prior to restart. of Brunswick Unit t.

This level of reserve. la considered extre=47 Iw.

Should another forced outage of a large snaerating unit ocent ce cur systes, the av*11*b111ty of purchased pour is ths quantity that w:uld be required la untertain. The low coal nsstn being experienced due i

to railroad strNs makes it more and nest difficult to purchase poowr.

1 The shut down of Brunswick Unit 1 prior to Ennswick Unit 2 restart vauld also furtkr reduce the coal reserves ou the CP&L systes %ich i

f are alta.ady low at same plants.

4 t

_ ~~- - ~ ~

} O s) l

.e

,J

-s

s.

IABLE 4.7.5-l_

i E$

HYDRAULIC SNUBBER INSPECTION SCHEDULE 6

ti E

NUMBER OF '40BBERS FOUND liiOPERABLE NEXT REQUIRED

{

DU_ RING INSPECTION OR_0URING INSPECTION INTERVAL?

INSPECTION IMIERVAL**

s 21 0

18 months + 25%

1 12 months T 25%***

2 6 months T 25%

~

3 or 4 124 days

+ 254 5, 6, or 7 62 days

+ 25%

>B 31 days i 25%

  • Snubbers may to categorized into two groups, " accessible" and " inaccessible".

This categorization w

3 shall be based upon the snubber's accessibility for inspection during reactor operation.

These two groups may be inspected independenti f according to the above schedule, sq 0,

~'

    • The requirea inspection' interval shall not be lengthaned more than one step at a time.
      • For the inaccessible snubber inspection interval scheduled to end September 14, 1978, a one-time only exempticn is allowed to extend this inspection interval through october 4,1978 l

0 I

h 7

0.-

4 0

.,d 6,noxsenemnummmempmssmennemam__ -

w

+-

'Is

?

. r -. %

.m

~

f

/

+

.{'s

~

o accanoe of the.=kwe ressouc, the best av llchle altsrnative f

for CP&L would be to operate Brunswick Unit I untf1 Unit 2 can make up the needed capacity.

During the last Unit h 1 dryuell arroner inspectica, we found one inoperabic sanhber, and none were found hperable during the last Unit 2 inspection. We believe that extending the 12 month + 25

~

percent inspectica interval by a total of 20 days will not comprowise the public health or safety for the reasons stated in the " Safety Evalua-tion by the Office of Nuclear Reactor Regulatico Supporring A-ndment so.15 to Facility 1.icense h DPR-71" dated September 13. 1978. To further ensure that public health and safety is not compromised during this extension, we will inceruct on-shift operarArs to pay particular attentico to seismic mmbes and operating p.srameters on the recircula-tion and safety systems. Any seismic event or indicated abnormal dynamic loads (higher than prainnsly observed or expected) on recirculation system or any safety syerez will he analyzed promptly for probable fapact on anubbers and primary systen integrity. Es will abut down temmadiately for any sesre:ref comproeM. Also, we will continue to municor drywell tecrsrure, pressure, and leakage for indications of primary system integrith and will take action required by technical

}

specifications.

The affected technical avecification page, 3/4 7-31, has been revised to reflect chis change and la attached to this letter. Havinions are marked by a vertical br in the right hand margin.

In accordance with 10CFR170.12(c). ve have determined that this t*ehaical specifierthe change request is a Class II ---a4= ant h=c==*e it is =^= tat atrattre in nature. Therefore. our check in the amount of $1,200 is enclosed as paysant for the amend ot fee.

Your prompt attention to this argent request will be greatly appreciated.

Yaare very truly, u

1. K. 5tley

)

Senior Vice President Fouer $stpply nes/ f S

Att=c =-aat 2Dth day of September 1978 Swern to ami subscribed before we h

'I+_k0 '

hW_

Notary Public

\\\\

fHrg' UN My Commission Expires: Det(der 4,1981 cc: Mr. J. P. O'Reilly g

goTAg,-

g 5

U B LIC 5

W 35N-n amu 2