OPERATING DATA REPORT (CORRECTED COPY)

DOCKET NO:

50-313 DATE:

August 4,1993 COMPLETED BY: K. R. Hayes TELEPHONE:

(5011 964-5535 OPERATING STATUS 1.

Unit Name: Arkansas Nuclear One - Unit 1 2.

Reporting Period:

June 1-30,1993 3.

Licensed Thermal Power (MWt): 2.568 4.

Nameplate Rating (Gross MWe): 902.74 5.

Design Electrical Rating (Net MWe): 850 6.

Maximum Dependable Capacity (Gross MWe): 883 7.

Maximum Dependable Capacity (Net MWe): 836 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted. If Any (Net MWe): None 10.

Reasons For Restriction.t If Any:

None MONTH YR-TO-DATE CUMULATIVE I 1.

Hours in Reporting Period.

720.0 4343.0 162450.0 12.

Number of Hours Reactor was Critical.

720.0 4301.8 117300.8 13.

Reactor Reserve Shutdown Hours.

0.0 0.0 5044.0 14.

Hours Generator On-Linc.

720.0 4281.5 115103.2 15.

Unit Reserve Shutdown Hours.

0.0 0.0 817.5 16.

Gross Thermal Energy Generated (MWH).

I817517 10767961 263905115 17.

Gross Electrical Energy Generated (MWH).

612000 3675190 88053060 18.

Net Elec'rical Energy Generated (MWH).

585023 3517633 83718234 19.

Unit Service Factor.

100.0 98.6 70.9 l

20.

Unit Availability Factor.

100.0 98.6 71.4 21.

Unit Capacity Factor (Using MDC Net).

97.2 96.9 61.6 22.

Unit Capacity Factor (Using DEC Net).

95.6 95.3 60.6 23.

Unit Forced Outage Rate.

0.0 1.4 11.4 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage 1R11 is scheduled to becin September 7.1993 and startup is scheduled for November 1.1993.

25.

If Shut Down At End of Report Period Estimated Date of Startup:

26.

Units in Test Status (Prior to Commercial Cperation):

Forecast Achieved INITIAL CRITICALITY 08/0604 INITIAL ELECTRICITY 08/17n4 COMMERCIAL OPERATION 12/1954 9308190358 930813 E