ML20046D426

From kanterella
Jump to navigation Jump to search
Revised Page 1 Sheet of Operating Data Rept for Apr 1993 for Ano,Unit 1
ML20046D426
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/30/1993
From: Hayes K
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20046D424 List:
References
NUDOCS 9308190355
Download: ML20046D426 (1)


Text

__

~

OPERATING DATA REPORT (CORRECTED COPY) 1 DOCKET NO:

50-313 DATE:

August 3,1993 COMPLETED BY: K. II. Hay es TELEPHONE:

(501) 964-5535 OPERATING STATUS 1.

Unit Name: Arkansas Nuclear One - Unit 1 2.

Reporting Period:

April 1-30.1993 3.

Licensed Thermal Power (MWt): 2.568 4.

Nameplate Rating (Gross MWe): 902.74 5.

Design Electrical Rating (Net MWe): 850 6.

Maximum Dependable Capacity (Gross MWe): 883 7.

Maximum Dependable Capacity (Net MWe): 836 l

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted. If Any (Net MWe): None 10.

Reasons For Restrictions. If Any:

None MONTH YR-TO-DATE CUMULATIVE I 1.

Hours in Reporting Period..

719.0 2879.0 160986.0 12.

Number of Hours Reactor was Critical.

719.0 2837.8 115836.8 13.

Reactor Reserve Shutdown Hours.

0.0 0.0 5044.0 14 Hours Generator On-Line.

719.0 2817.5 113639.2 15.

Unit Reserve Shutdown Hours.

0.0 0.0 817.5 16.

Gross Thermal Energy Generated (MWH)..

1692223 7043693 260180847 17.

Gross Electrical Energy Generated (MWH).

577100 2414165 86792035 18.

Net Electrical Energy Generated (MWH).

551529 2311166 82511767 19.

Unit Service Factor.

100.0 97.9 70.6 i

20.

Unit AvailabilityFactor.

100.0 97.9 71.1 21.

Unit Capacity Factor (Using MDC Net).

91.8 96.0 61.3 22.

Unit Capacity Factor (Using DEC Net).

90.2 94.4 60.3 23.

Unit Forced Outage Rate.

0.0 2.1 11.6 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

25.

If Shut Down At End of Report Period. Estimated Date of

~

I Startup:

26.

Units in Test Status (Prior a Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/74 i

INITIAL ELECTRICITY 08/17/74 COMMERCIAL OPERATION 12/19/74 i

9308190355 930813 K

PDR ADOCK 05000313 O's

.R PDR

'