ML20046D381
| ML20046D381 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 08/05/1993 |
| From: | Mcmeekin T DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20046D382 | List: |
| References | |
| NUDOCS 9308190073 | |
| Download: ML20046D381 (1) | |
Text
ll l
pu$,j w,,c a pagy
'(IODSI54000 hkCuire Nudear Station
.12700 Hagers Ferry Road Hunterstdie. NC28078.MRS DUKEPOWER August 5,1993 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
McGuire Nuclear Station Docket 50-369 Unit 1 Cycle 9 Startup Report Gentlemen:
Attached is the McGuire Nuclear Station Unit 1 Cycle 9 Startup Report for Criticality, Zero Power Physics Testing, and Power Escalation Testing as required by Section 6.9.1.1 of the McGuire Technical Specifications. This report is submitted due to the use of both Westinghouse and Babcock and Wilcox fuel in the core reload.
For questions concerning this report, please contact Kay Crane, McGuire Regulatory Compliance at (704) 875-4306.
Very truly yours, f?" LV
~
T. C. McMeekin, Vice President McGuire Nuclear Site cc:
(with attachments)
Mr. Victor Nerses, Project Manager U. S. Nuclear Regulatory Commission Otfice of Nuclear Reactor Regulation Washington, D.C.
20555 Mr. S. D. Ebneter. Regional Administrator U. S. Nuclear Regulatory Commission Region !!
101 Marietta St. NW, Suite 2900 Atlanta, Georgia 30323 Mr. T. Cooper, Resident inspecto17 0 07 2 i
McGuire Nuclear Site
/
g 9308190073 930805 4
PDR ADOCK 05000369
)
P PDR y