OPERATING DATA REPORT REVISED DATA UNIT NAME Millstone Unit 2 DATE 7/08/93 COMPLETED BY S. Doboe TELEPHONE (203) 447-1791-EXT 4678 OPERATING STATUS

.1.

Docket Number:

50-336 Notes: Items 22 and 23 2.

Reporting Period:

June 1993 cumulative are weighted 3.

Utility

Contact:

S. Doboe averages. Unit operated 4.

Licensed Thermal Power (MWt):

2700 at 2560 MWTH prior.to its 5.

Nameplate Rating (Cross MWe):

909 uprating to the current 6.

Design Electrical Rating (Net MWe):

870 2700 MWTH power level.

-7.

Maximum Dependable Capacity (Gross MWe):

903.10 8.

Maximum Dependable Capacity (Net MWe):

873.10 9.

If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since. Last Report, Give Reasons:

N/A

10. Power Level To Which Restricted, If any (Net MWe):

N/A 11.-Reasons For Restrictions, If Any:

N/A This Month Yr.-To-Date Cumulative.

12. Hours In Reporting Period 720.0 4343.0 153527.0
13. Number Of Hours Reactor Was Critical 704.7 4035.3

-109292.9

14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
15. Hours Generator'On-Line 699.4 3910.2-104267.6
16. Unit Reserve Shutdown Hours 0.0 0.0 468.2-
17. Gross Thermal Energy Generated (MWH)
  • 1859045.0
  • 10163938.0
  • 268145642.4
18. Cross Electrical Energy Generated (MWH) 620565.0 3394485.5 87798793.0
19. Net Electrical Energy Generated (MWH)'

598841.0 3266761.5 84217637.8

20. Unit Service Factor 97.1 90.0 67.9
21. Unit Availability Factor 97.1 90.0 68.2 2;2. Unit Capacity Factor (Using MDC Net) 95.3 86.2 64.3
23. Unit Capacity Factor (Using DER Net) 95.6 86.5 63.2
24. Unit Forced Outage Rate 2.9 3.0 15.0
25. Sliutdowns Scheduled Over Next 6 Months (Type,.Date, and Duration of Each):

None 26~. 'If Unit Shutdown At End Of Report Period. Estimated Date of Startup:

N/A

27.. Units In Test Status (Prior.to Commercial-Operation):

Forecast Achieved

-INITIAL CRITICALITY N/A N/A

' INITIAL ELECTRICITY N/A-N/A-COMMERCIAL OPERATION N/A N/A 8

  • REVISED DATA DUE TO CALCULATIONAL ERROR j

+

9308160246 930810 y