OPERATING DATA REPORT REVISED DATA UNIT NAME Millstone Unit 2 DATE 7/08/93 COMPLETED BY S. Doboe TELEPHONE (203) 447-1791-EXT 4678 OPERATING STATUS
.1.
Docket Number:
50-336 Notes: Items 22 and 23 2.
Reporting Period:
June 1993 cumulative are weighted 3.
Utility
Contact:
S. Doboe averages. Unit operated 4.
Licensed Thermal Power (MWt):
2700 at 2560 MWTH prior.to its 5.
Nameplate Rating (Cross MWe):
909 uprating to the current 6.
Design Electrical Rating (Net MWe):
870 2700 MWTH power level.
-7.
Maximum Dependable Capacity (Gross MWe):
903.10 8.
Maximum Dependable Capacity (Net MWe):
873.10 9.
If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since. Last Report, Give Reasons:
N/A
- 10. Power Level To Which Restricted, If any (Net MWe):
N/A 11.-Reasons For Restrictions, If Any:
N/A This Month Yr.-To-Date Cumulative.
- 12. Hours In Reporting Period 720.0 4343.0 153527.0
- 13. Number Of Hours Reactor Was Critical 704.7 4035.3
-109292.9
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
- 15. Hours Generator'On-Line 699.4 3910.2-104267.6
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2-
- 17. Gross Thermal Energy Generated (MWH)
- 1859045.0
- 10163938.0
- 268145642.4
- 18. Cross Electrical Energy Generated (MWH) 620565.0 3394485.5 87798793.0
- 19. Net Electrical Energy Generated (MWH)'
598841.0 3266761.5 84217637.8
- 20. Unit Service Factor 97.1 90.0 67.9
- 21. Unit Availability Factor 97.1 90.0 68.2 2;2. Unit Capacity Factor (Using MDC Net) 95.3 86.2 64.3
- 23. Unit Capacity Factor (Using DER Net) 95.6 86.5 63.2
- 24. Unit Forced Outage Rate 2.9 3.0 15.0
- 25. Sliutdowns Scheduled Over Next 6 Months (Type,.Date, and Duration of Each):
None 26~. 'If Unit Shutdown At End Of Report Period. Estimated Date of Startup:
N/A
- 27.. Units In Test Status (Prior.to Commercial-Operation):
Forecast Achieved
-INITIAL CRITICALITY N/A N/A
' INITIAL ELECTRICITY N/A-N/A-COMMERCIAL OPERATION N/A N/A 8
- REVISED DATA DUE TO CALCULATIONAL ERROR j
+
9308160246 930810 y
PDR ADDCK 05000336 i
R pop:
i