ML20046D169
| ML20046D169 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/10/1993 |
| From: | Haynes H, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20046D170 | List: |
| References | |
| MP-93-631, NUDOCS 9308160242 | |
| Download: ML20046D169 (1) | |
Text
...
)
NORTHEAST UTILtTIES cenm, Omces. seeen meet. sem conn ci,cui w raucw -
,mi.e. rz.
l mun m w mmew wccow.
P.O. BOX 270
.E[$.$d E7w,
HARTFORD. CONNECTICUT 06141-0270 k
k J
(203) 665-5000 cy,,,,
August 10, 1993 MP-93-631 Re:
P U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating License No. DPR-65 t
Docket No. 50-336 e
Dear Sir:
4 This letter is forwarded to provide the report of operating and shutdown experience relating-to Millstone Unit 2 for the month of July 1993, in accordance with Appendix A Technical Specifications, Section 6.9.1.6.
One 4
additional copy of the report is enclosed. Also enclosed is a revised copy of the June, 1993, Operating Data Report.
-Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: Stephen E. Scace Vice President - Millstone Station 1
i
[L%L
.Q BY: Harry F. Ha e
Director - M i tone Unit SES/sid cc: T. T. Martin, Region 1 Administrator G. S. Vissing, NRC Project Manager,' Millstone Unit No. 2 P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos. 1,2&3 l
9308160242 930810 8 'l.
os34u scv 44e PDR; ADDCK 05000336 re p^