Ak Entergy Operations,Inc.
- ENTERGY m+
mmm
( 1437 2&L C. R. Hutchinson
- <.v v <
a.-
August 10, 1993 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.
20555 Attention:
Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-93/00098 Gentlemen:
In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for July 1993.
t If you have any questions or require additional information, please contact this office.
Yours truly, s/
hV CRhMC attachments:
1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdown and Power Reduction cc:
(See Next Page) l
[
I 9308160236 930731
/
1 PDR ADDCK 05000416 ;3 g
- ~ ~ ~
R PDR y
I i
t Amgust 10, 1993 GNRO-93/00098' I
Page 2_of 3 i
cc:
Mr. R. H. Bernhard (w/a)
Mr. D._C. Hintz (w/a)
Mr. R. B. McGehee (w/a)
Mr. N.
S.
Reynolds (w/a) i Mr. H. L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St.,
N.W.,
Suite 2900 I
Atlanta, Georgia 30323 i
Mr.
P. W.
O'Connor, Project Manager j
i Office of Nuclear Reactor Regulation j
U.S.
Nuclear Regulatory Commission 1
Mail Stop 13H3 Washington, D.C.
20555 i
i 1
l 9
'h
.i i
.i i
r h
h a
- y
I
)
DOCKET NO 50-416 DATE 08/04/93 COMPLETED BY L.
F.
Dauchtery TELEPHONE (601) 437-2334 OPERATING STATUS
- 1. -
Unit Name:
GGNS UNIT 1 2.
' Reporting Period:
July 1993 l
3.
Licensed Thermal Power (MWt):
3833 MWT 1
.4.
Nameplate Rating (Gross MWe):
1372.5 MWE 5.
Design Electrical Rating (Net MWe):
1250 MWE 6.
Maximum Dependable Capacity (Gross MWe) : 1190 MWE 7.
Maximum Dependable Capacity.(Net MWe):
1143 MWE 8.
If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report.
Give Resason:
N/A 9.-
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictiore. If Any: __
N/A This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 744 5.087 76.983 112. Number of Hours Reactor was Critical 744.0 5.087.0 62i633 1 L
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line
~744.0 5.087.0 60.300.7
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2.825.975 19.288.813 211.528.953
- 17. Gross Electrical Energy Generated (MWH) 889.616 6.221.755 67.303.587'
- 18. Not Electrical Energy Generated (MWH) 854,096 5.981.275 64.449.199
-19. Unit Service Factor 100.0 100.0 80.8'
- 20. Unit Availability Factor 100.0 100.0 80.8
- 21. Unit Capacity Factor.(Using MDC Net)
'100.4 102.9-77.91
- 22. Unit Capacity Factor (Using DER Net) 91.8' 94.1 70.7' i
- 23. Unit Forced Outage Rate 0
0
- 5. 7 -. -!
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration.of Each):
Beain Refuelina Outace-6 on 10/08/93 for an estimated duration of 40' days.
,j
- 25. If Shut Down ht.End of Report Pe"iod. ' Estimated Date of Startup:'
I
-26.: Units in Test Status (Prior to Commercial Operation).
l Forecast Achieved INITIAL CRITICALITY 08/18/82
[
-INITIAL ELECTRICITY 10/20/84 i
COMMERCIAL OPERATION 07/01/85 i
L I
l f
i
]
DOCKET NO 50-416 DATE 08/04/93 COMPLETED BY L.
F.
Dauchterv TELEPHONE (601) 437-2334 f
MONTH July 1993 Day--AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Het)
(MWe-Net) 1 1161 17 1151
.2 1161 18 1158 i
3 1151 19 1155 i
4 1162 20 1152 E
5 1161 21 1157 6.
1160 22 1157 f
7 1159 23 1156 8
1162 24 1151
.i
.t 9
1166 25 1157 10 1086 26 1154 t
11 1051-27 1153 12 1162 28 1152
-13:
1138 29 1090 d
r
.14 L 1161 30 1155 i
15 1144 31 1142 l
i 116.
1162 N/A i
i
'I
.i i
'l i
c!
-l I
k 9
UNIT S'IUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-416 DATE 08/04/93 COMPLETED BY L.
F.
Daucthtery TELEPHONE (601) 437-2334 REPORT MONTH July 1993 No.
Date Type Duration Reason Method of Licensee System Component Cause &
(1)
Hours (2)
Shutting Event Code Code Corrective Down Report #
(4)
(5)
Action to Reactor Prevent (3)
Recurrence None 1
2 3
4 F:
Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee-B-Maintenance or Test 3-Automatic Scram Event Report (LER)
-C-Refueling 4-Continued File (NUREG-0161)
D-Regulatory Restricting 5-Reduced load
'E-Operator Training &
6-Other Licensing Examination 5
F-Administrative Exhibit 1-Same Source G-Operational Error (Explain)
H-Other (Explain)
. ~..