o
4
UNITED STATES
'
f
.
- p
NUCLEAR REGULATORY COMMISSION
,
g
i
REGION V
1
%
8
1450 MARIA LANE
"
% ~ "' 8
WALNUT CREEK, CALIFORNIA 94596-5368
JUL 3 01%
Docket Nos.:
50-361 and 50-362
Southern California Edison Company
Irvine Operations Center
23 Parker Street
Irvine, California 92718
Attention: Mr. Harold B. Ray
Senior Vice President, Nuclear
SUBJECT:
NRC INSPECTION REPORT NOS. 50-361/93-16 AND 50-362/93-16
,
This refers to the routine announced inspection conducted by Mr. W. J. Wagner
of this office on June 7 through June 11, 1993 and June 28 through July 2,
'
1993, and by Mr. C.A. Clark of this office on June 28 through July 2,1993,
of activities authorized by NRC Operating License Nos. NPF-10 and NPF-15.
The results of this inspection were provided in discussions held with members
of your staff on June 11 and July 2, 1993.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
No violations or deviations were identified within the scope of this
inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
'
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sinc rely,
1
-
-
,.
L. F. Miller, J .,
ief
Reactor Safety
nch
.
Enclosure:
Inspection Report Nos. 50-361/93-16 and 50-362/93-16
l l
j(r)I
9308160148 930730
ADOCK 05000361
O
l
.
1
-
.
-
- -
-
-
,
.
-
.
.
cC*
Mr..Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas
and Electric Co.
James A. Beoletto, Esq., Southern California Edison Company
)
'
Chairman, Board of Supervisors, County of San Diego
Alan R. Watts, Esq., Rourke & Woodruff
,
l
Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power
Mr. R. W. Krieger, Station Manager, Southern California Edison Company
j
Mr. Don J. Womeldorf, Chief, Environmental Management Branch
!
Mr. Richard J. Kosiba, Project Manager, Bechtel Power Corporation
-
Mr. Robert G. Lacy, Manager Nuclear Department
Mr. Steve Hsu, Radiologic Health Branch
j
Mayor, City of San Clemente
i
,
e
!
'i
$
5
!
,
)
i
l
i
.
R 3 0 1993
l
bec w/ enclosure:
'
Docket File
Resident Inspector
Project Inspector
M. Fields, Project Manager
G. Cook
1
K. Perkins
S. Richards
B. Faulkenberry
bcc w/o enclosure:
J. Zollicoffer
.;
M. Smith
J. Bianchi
REGION V
/
,
W. Wagner
C. Clark
W.Ang
H.Wong
L. Miller
-
$
1f/410 $$b
IRE 0VIST/ COPY 1 IRE 0 VEST COPY 1 IRE 0 VEST GORY 1 IRE 0 DEST COPY 1 IRE 0 VEST COPY 1
I MES'
N0 1 I ATS/ N0 1I YES (N0 )1 I /?ES / N0 1 IYES
N0
1
w
w
v
-
.
ISENDJD DCSl ISEND30 PDR1
I MEV N0 1 I MfSi NO 1
-
w
i
5
!
!
,
I
130014
i
"s C Ol-
l
_