MNuclear s t 3 s e re a r -
Route 9 South Forked River New Jersey 08731-0388 603 971-4000 Wnter's Direct Dial Number:
C321-93-2216 August 6,1993 U. S. Nuclear Regulatory Commission Attn: Document Control Desk 1
Washington, DC 20555 Gentlemen:
Subject:
.0yster Creek Nuclear Generating Station Docket No. 50-219 Data Point Library Change for the Emergency Response Data System (ERDS)
The purpose of, this letter is to-inform you as requested by NUREG-1394 'Section 3.6 of a change-to the Data Point Library for the 0yster Creek ERDS. The purpose of the change is to ' add a point to indicate whether the ERDS data is from the Replica Simulator or the' actual plant and, additionally, 'to revise the total.
~
feedwater flow description which is now obtained from the new single venturi flow indicator.
The attachment describes the change installed. Should you have any questions, please contact Brenda'DeMerchant, Oyster Creek Licensing Engineer at 609-971-4642.
Very truly y urs, e
g John
. Barton Vice President and Director Oyster Creek ~
JJB/BDe Enclosure cc:
Administrator, Region 1 Senior NRC Resident Inspector Oyster Creek NRC Project Manager 130046 of6 9308160106 930B06 rp PDR ~ADDCK 05000219-b!.
I j
~
F-PDR y3'
-(
l l
GPU Nuclear Corporation is a subsciary of General Pubuc UtMies Corporation
~!
~
,e 4
P t
{
DATA POINT LIBRARY REFERENCE FILE-i DATE:
07/17/89 l
REACTOR UNIT:
OY1 DATA FEEDER:
N/A
.i NRC ERDS PARAMETER:
Main FD Flow POINT ID:
HB-FWFLO
]" -
PLANT SPEC POINT DESC.:
Total Feedwater Element Flow Smoothed GENERIC /COND DESC.:
Feedwater Flow into the Reactor System l
ANALOG / DIGITAL:-
A a
ENGR UNITS / DIG STATES:
LB/HR
[
9t*
ENGR UNITS CONVERSION:
Square Root y.
i MINIMUM INSTR RANGE:
0 l
gGe MAXIMUM INSTR RANGE:~
B,000,000.1 b/hr 600 inches of water
- 3 ZERO POINT
REFERENCE:
N/A REFERENCE POINT NOTES:
N/A R td.
PROC OR SENS:
S i
y NUMBER OF SENSORS:
1
.i HOW PROCESSED:
CD second average.
l
' RtV )
-5ENSOR. LOCATIONS:-
Downstream of the feedwater strings. header and upstream of the reactor
_3' i
ALARM / TRIP SET POINTS:
None
$ 6v,
UNIQUE SYSTEM DESC.:
This signal is' independent of the feedwater control-3' system.
3 s
.1 l
u l
'l
( --
l DATE:
03/24/93 REACTOR UNIT:
OY1 DATA FEEDER:
N/A NRC ERDS PARAMETER:
N/A h',
POINT ID:
SOURCE PLANT SPEC POINT DESC.:
ERDS DATA SOURCE GENERIC /COND DESC.:
N/A ANALOG / DIGITAL:
D ENGR UNITS / DIG STATES:
0 = PLANT DATA, 1 - SIMULATOR DATA ENGR UNITS CONVERSION:
N/A MINIMUM INSTR RANGE:
0 MAXIHUM INSTR RANGE:
I ZERO POINT
REFERENCE:
N/A REFERENCE POINT NOTES:
N/A PROC OR SENS:
P NUMBER OF SENSORS:
0 NOW PROCESSED:
N/A SENSOR LOCATIONS:
N/A ALARM / TRIP SET POINTS:
N/A UNIQUE SYSTEM DESC.:
N/A
o
-4 r
I 1
NRC DATA PTS.
Analoa 9
-)
AIT38494 i
APRMPWR DWTEMP
- FITRV26A FITRV26B HB-MWTH HB-FWFLO HB-RCFLO H2ITIA IRM14POR i
IRM14RNG LTID13A LT35 LT37 PITID46A' PT53 RE790 RNO3B RN05B-RN05C RN05E SRM24 TI66443A UILR
$c/
l Diaital 3
SOURCE 4
4 5