Wisconsin 1 Electnc POWER COMPANY 231 W Michigan. PO Bcx 2046, Mrlwtsuice.VA 53201 (414)224-2345 VPNPD 13 9 NRC 08 8' August 5, 1993 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached'are monthly operating reports for Units 1 and 2 of.the Point' Beach Nuclear Plant'for the calendar month of July 1993.
Sincerely,
[
Bob Link Vice President Nuclear Power MFB/jg lcc:
L.
L. Smith, PSCW NRC Regional Administrator,' Region III L
NRC Resident Inspector A
'l 9308130094;930731
- 9?
I-PDR 1ADDCK;05000266- '&,in R-
~
PDR AschekfayofHiaanExqr('aiyxygkra
+
t
' OPERATING DATA-REPORT g
DOCKET No.-50-266
'[
DATE:
08/02/93 COMPLETED BY: Richard F. Arnold TELEPHONE:
(414)755-6193 OPERATING STATUS
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
- 2. REPORTING PERIOD ' July.- 1993
- 3. LICENSED THERMAL POWER (MWT):
1518.5 4.' NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0 6.
MAXIMUM. DEPENDABLE CAPACITY (GROSS MWE):
509.0
- 7. MAXIMUM DEPENDABLE CAPACITY.(NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA.
9.
POWER LEVEL TO WHICH' RESTRICTED, IF ANY (NET MWE):
NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA' THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS I.N REPORTING PERIOD 744.0 5,087.0 199,295.0 l -
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL ~
744.0 4,162.6 165,045.9
~
~
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS. GENERATOR ON LINE.
744.0 4,127.8 161,967.2
- 15. UNIT RESERVE SHUTDOWN HOURS' O.0 0.0 846.9
- 16. GROSS THERMAL ENERGY. GENERATED (MWH)-
1,128,640 6,177,437 227,914,410
- 17. GROSS ELECTRICAL ENERGY GENERATED 382,210 2,091,840 76,968,240
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 365,623 1,999,262 73,351,425
- 19. UNIT SERVICE FACTORE 100.0%
81.1%
81.3%
20.' UNIT AVAILABILITY FACTOR 100.0%
81.1%
81.7%
l21. UNIT CAPACITY FACTOR.(USING MDC NET)'
'101.3%
81.0%
75.5%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.9%-
79.1%
74.1%
23.' UNIT FORCED OUTAGE RATE 0.0%
0.0%-
1.6%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE-12 5..IF: SHUTDOWN AT.END'OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA LDATA REPORTED AND FACTORS' CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
. ~, _.. - _ _ - _ _. _ -. ~ _. _ - _. -.,. - -.. - _.. ~.. _. -. -. _. -. - - _. -. _ _. _ _....,. - _ - -
- e POINT BEACil NUCLEAR PLANT -
DOCKET No.
50-266
=
AVERAGE DAILY UNIT IMER LEVEL UNIT NAME Point Beach. (( nit 1 MONTil JULY - 1993 DATE Aurust 2.1993 f
(
COMPLSTED BY R. F. Amold TELEPilONE 414/755-6193 l-AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY f-POWER LEVEL POWER LEVEL POWER LEVEL f.
DAY _
MWe NET p_A_1 MWe NET DAY MWe NET
=
1 492 11 495 21 485 2
492 12 495 22 485 3
492 13 495 23 484 4
492 14 493 24 484 493 25 473 5
494 15 I
6-494 16 493 26 493 7
494 17 492 27 493 3
494 18 491 28 495 9
495 19 489 29 495 10 494 20 488 30 494 31 495 PBF-0028a (03-90) -
.g ag POINT BEACH NUCLEAR PLANT
-Docket No.
50 4.66.
Unit Name Point Beach. Unit 1 UNIT SilUTDOWNS AND POWER REDUCTIONS Date -
Aurust 2.1993 Completed By R. F. Arnold REPORT MONTil JULY - 1993 Telephone No.
414/755 4 193 E
Method of Shutting No.
Date Type' Duratum.
Reawn' Down tjeensee Event System Component Cause and Corrective Action
.NA NA NA NA NA NA NA NA NA i
Reason:
' Method:
' Exhibit G - Instructions
'F: Forced 2
S: Scheduled A - Equipment Failure (explain) -
1 - Manual for preparation of B.- Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 -- Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4
- Continuation of E - Operator Training &
Previous Shutdowti Licensing Exam 5 - Reduced Load F - Administrative 6 Other (explain)
Exhibit I - Same Source 1
5 G - Operational Error (explain)
H - Other (explain)
PBF-CD28b (03 00)
i
~
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE August 2, 1993 l
COMPLETED BY R.
F. Arnold
{
TELEPHONE 414/755-6193
[
i
'l Unit 1 operated at approximately 491 MWe net for the report period with no significant load reductions.
j i
Safety-related maintenance included:
1.
Removed the A3 bridge and replaced control rectifier _on-1DYO3 125 VDC/120 VAC inverter.
2.
Installed amptector on three 480 V breakers (B52-15A, B52-15B and B52-18A) which supply power to containment accident recirculation fans.
l
- 3. A spool piece was installed in the south service water header to facil. ate the repair of an isolation valve to a Zurn struiner j
4.
Replaced three insulating links and moved' sensor taps to j
400 amps on a spare 480 V breaker (B52-22B).
J
- 5. Rebuilt 1P2B charging pump.
t t
I i
4 l
P P
2 6
h i
3 OPERATING. DATA-REPORT
_g, DOCKET NO. 50-301 DATE:
08/02/93 COMPLETED BY Richard F. Arnold TELEPHONE:
(414)755-6193 OPERATING STATUS
- 1. UNIT NAME: : POINT BEACH NUCLEAR' PLANT - UNIT 2.
NOTES
-2.
REPORTING PERIOD: July - 1993 3.' LICENSED THERMAL POWER ~(MWT):
1518.5 4.: NAMEPLATE RATING (GROSS MWE): -523.8
- 5. DESIGN. ELECTRICAL RATING (NET MWE): ' 497.0
- 6.. MAXIMUM DEPENDABLE _ CAPACITY (GROSS MWE):
509.0.
- 7. MAXIMUM DEPENDABLE CAPACITY-(NET MWE):~ 485.0 8.-IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF.ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 5,087.0
-184,080.0
. 12. NUMDER OF HOURS REACTOR WAS CRITICAL 744.0 5,074.7 161,350.6
- 13. REACTOR RESERVE SHUTDOWN HOURS -
0.0 4.0 233.9
- 14. HOURS GENERATOR ON LINE 744.0-5,066.3 159,048.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,116,051 7,569,048.
228,215,309
- 17. GROSS ELECTRICAL ENERGY GENERATED 381,700 2,601,290 77,601,410
_18. NET ELECTRICAL _ ENERGY GENERATED'(MWH).
364,667 2,489,279
'73,975,686
- 19. UNIT SERVICE, FACTOR 100.0%
99.6%
86.4%
- 20. UNIT AVAILABILITY FACTOR 100.0%
99.6%.
86.6%
- 21. UNIT CAPACITY' FACTOR (USING MDC NET) 101.1%
100.9%
82.2%
- 22. UNIT. CAPACITY. FACTOR (USING DER NET) 98.6%~
-98.5%.
80.9%
23.1 UNIT FORCED OUTAGE RATE 0.0?
0.4%
-1.0%
24.' SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage,.09/25/93, 42 days
- 25. IF SHUTDOWN AT END'OF REPORT PERIOD,-ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS PEQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
,-.-a w-s-+sw wir
=
-r w
w t++sv
-+w
&+-ws>=*
- w-m ww -Nt-e v
we*+
v%u eeT'
-rf u
- iw w e-~
e
-w-c
+
w-w w atwn- + v e em e v *-w ervm+-
- ee e en w sw w e-r twww ri a
emwri,-we
POINT BEACl{ NUCLEAR PLANT DOCKET NO.
50-301 t
~ AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. U' it 2- _
n
- MONTil JULY - 1993 DATE Aurust 2.1993.
COMPLETED BY R. F. Arnold TELEPilONE 414/755-6193 AVERAGE AVERAGE
' AVERAGE -
DAILY DAILY DA!LY POWER LEVEL POWER LEVEL POWER LEVEL D6.X MWe NET D_AX MWe NET D_AX MWe NET 1
491~
11-494 21 486 2
491 12 494 22 485
.3 490 13 494 23 483 4
452 14 493 24 482
.5
'494 15 ~
493 25
~490 2
6 494 16 492 26 492 7
494 17 -
491 27 493 S'
495 18 490' 28 494 9
495 19 489
'29 494 10 493
-20 487 30 494 31.
494 FBF-0028a -
- (03-90) t-
~,.
.-,--__.,2._.-_.
.... ~.
..;,_,_._.-_..,_.-;~.._......_..,..,.
~'
POINT DEACil NUCLEAR PLANT Docket No.
50-301 Unit Name Point Beach. Unit 2 UNIT FilUTDOWNS AND POWER REDUCTIONS Date Aucust 2.- 1993 Completed By R. F. Arnold REPORT MONTil JULY - 1993 Telephone No.
414/755-6193 Method of Shutting Duration 90,,
Licensee Event System Cornponent Cause and Conective Action s
Report No.
Code' Code' To Prevent Recurrence No.
Date Type' (Hours) '
Reason' Reactor NA NA-NA NA NA NA NA NA NA
'F: Forced 2 Reason:
'Methal:
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain)'
1 - Manual for preparation of B - Maintenance or Testing Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction
. 4 - Continuation of E - Operator Training &
Previous Shutdowti Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain) 11 - Other (explain)
PBF-@28b (03-90)
ty b/,. j '
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE August 2, 1993 COMPLETED BY R.
F. Arnold TELEPHONE 414/755-6193 Unit 2 operated at approximately 490 MWe net throughout the report period with no significant load reductions.
Safety-related maintenance included:
- 1. ~ Rebuilt C-1 containment equipment access air lock (lower) valve and performed leak test.
- 2. Replaced the I/P converter on the valve controller for MS-02015, steam generator "1B" steam. header atmospheric steam-dump.
3.
Replaced the following 480 V breakers as part of the molded caso circuit breaker program: B52-3211M, B52-3213M, B52-328F,.
B52-328H, B52-4211D and B52-427J.