, _..
f July 26,'1993.
- c..
Docket Nos. 50-295'
, DISTRIBUTION; and 50-304
' Docket' File B. Clayton, RIII x
NRC & _ Local PDRs PDIII-2 y/t. file Mr. D. L. Farrar PDIII-2 r/f OGC Manager, Nuclear Regulatory Services J. Partlow TGibbons Commonwealth Edison Company J. Roe.
SWeins Executive Tower.s West III, Suite 500 J. Zwolinski J. Dyer 1400 OPUS Place C. Moore Downers Grove, Illinois 60515 C. Shiraki j
NRR Mail Room (yt#0930155) r
Dear Mr. Farrar:
SUBJf.CT : APPROVAL OF COMMONWEALTH EDISON COMPANY'S REQUEST TO RELOCATE THE ZION EMERGENCY OPERATIONS FACILITY (E0F) (TAC NOS. M85138 AND M85139)
On March 31, 1993 Commonwealth Edison Company submitted a change requestito its Generic Generating Stations Emergency Plan (GSEP) Manual.
This' change request consisted of revisions associated with the use of your Corporate Emergency Operations Facility (CEOF) as an interim Emergency Operations Facility (EOF) until the nearsite E0F is activated.
This change request 'also --
encompassed a change to designate the CEOF as the backup E0F for Zion Nuclear, Power Station.
The purpose of this letter is to inform you that the staff has approved your request to designate the CE0F as the backup EOF for the Zion Nuclear Power Station.
However, as you are aware, the remaining changes requested by you'
+
in your March submittal are still under staff review.
This concludes our review effort related to this specific aspect of your submittal and closes TAC Nos. M85138 and M85139.
Sincerely,
%ginalSigned By.-
Clyde Y. Shiraki, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation' cc:
See next page OFC M PI)III-2 PM:PDIII-2 D:PDIII-2 hk b JDYERdk NAME CSHIRAKI DATE 9/M/93 1 / N 93 7f]h/93_
/ /93
/
/93'
/ /93-COPY YES)NO
/hNO YES[)
YES/NO YES/NO YES/NO l
DOCUM11N NAME:
ZQ3&I39.YEL L'
Dm % wn r+ eq 9308120273 930726 MIED UN!.5lh;h,, h h[N[
l h
PDR ADOCK 05000295 P
PDR ph l Q1 a
~.
July 26,1993 Docket Nos. 50-295 DISTRIBUTION:
and 50-304 Docket File B. Clayton, RIII NRC & Local PDRs PDIII-2 y/t file Mr. D. L. Farrar PDIII-2 r/f OGC Manager, Nuclear Regulatory Services J. Partlow TGibbons Commonwealth Edison Company J. Roe SWeins Executive Towers West III, Suite 500 J. Zwolinski J. Dyer 1400 OPUS Place C. Moore Downers Grove, Illinois 60515 C. Shiraki NRR Mail Room (yt#0930155)
Dear Mr. Farrar:
SUBJECT:
APPROVAL OF COMMONWEALTH EDISON COMPANY'S REQUEST TO RELOCATE THE ZION EMERGENCY OPERATIONS FACILITY (EOF) (TAC NOS, M85138 AND M85139)
On March 31, 1993, Commonwealth Edison Company submitted a change request to its Generic Generating Stations Emergency Plan (GSEP) Manual.
This change request consisted of revisions associated with the use of your Corporate Emergency Operations f acility (CE0F) as an interim Emergency Operations Facility (EOF) until the nearsite EOF is activated.
This change request also encompassed a change to designate the CE0F as the backup EOF for Zion Nuclear Power Station.
The purpose of this letter is to inform you that the staff has approved your request to designate the CE0F as the backup EOF for the Zion Nuclear Power Station.
However, as you are aware, the remaining changes requested by you in your March submittal are still under staff review.
This concludes our review effort related to this specific aspect of your submittal and closes TAC Nos. M85138 and M85139.
Sincerely, Origintd Signed Bv-Clyde Y. Shiraki, Project Manager Project Directorate Ill-2 Division of Reactor Projects - Ill/IV/V Office of Nuclear Reactor Regulation i
cc:
See next page 0FC M;PI)lll-2 PM:PDIll-2,
D:PDIII-2 M
d JDYER M k NAME CSHIRAKI DATE 9/O/93 1 / 8 93 7 03/93 _
/ /93
/ /93
/ /93 COPY YES/NO h NO YES[)
YES/NO YES/NO YES/NO DOCUMlTO NAME:
Z Q3M39. YE L V
g I
w g-i.- - - -,
D 4
y
+=a r
(
Mr. D. L. Farrar Zion Nuclear Power Station Commonwealth Edison Company Unit Nos. I and 2 cc:
Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603 Dr. Cecil Lue-Hing Director of Research and Development Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Phillip Steptoe, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.
Zion, Illinois 60099 Regional Administrator, Region III I
U. S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601
- ja
- -