Forwards Partially Withheld Insp Repts 50-254/93-20 & 50-265/93-20 on 930719-23 & Nov.Expresses Concern for Violation Because Design of Barriers Resulted in Identification of Degradation.Nov Withheld
ML20046C297
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/04/1993
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20046C298 List:
References
NUDOCS 9308100102
Download: ML20046C297 (2)


See also: IR 05000254/1993020

Text

r-

.

OG*

.

t-

S

ION

M

Docket No. 50-254

Docket No. 50-265

Commonwealth Edison Company

ATTN: Mr. L. O. DelGeorge, Vice President

Nuclear Oversight and

Regulatory Services

Executive Towers West III

1400 Opus Place, Suite 300-

Downers Grove, IL 60515

Dear Mr. DelGeorge:

SUBJECT:

QUAD CITIES PHYSICAL SECURITY INSPECTION AND NOTICE OF VIOLATION

This refers to the inspection conducted by Mr. T. J. Madeda of this office on

July 19-23, 1993.

The inspection included a review of activities authorized

for your Quad Cities Power Station, Units 1 and 2.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in tLe report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representatives records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice). The violation is of concern because the design of the

barriers resulted in our identification of a degradation.

Your security

organization had monitored these barriers and had not identified the problem.

The barrier degradation did not have a direct, significant impact on plant

safety.

Although Section 2.201 provides for a written statement of explanation to this

office within 20 days of your receipt of this Notice, we note that this

violation had been corrected and those actions, including your root cause

analysis, were reviewed during this inspection.

Therefore, no response with

respect to this matter is required.

r.ncin uro Contains

S!Jr4U.*RDS 117010LATION

9308100102 930804

PDR

ADOCK 05000254

pc.n separation This

O

PDR

yu;e la recontrolled

j- b

l

S

,

L

y

.

_

.

.

.

p

Commonwealth Edison Company

2 400

4l933

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended.

Therefore, the

material will not be placed in the Public Document Room.

Sincerely,

Bruce L. Jorgensen, Acting Chief

,

Reactor Support Program Branch

Enclosures:

1.

Notice of Violation

2.

Inspection Reports

No. 50-254/93020(DRSS);

No. 50-265/93020(DRSS)

(SAFEGUARDS INFORMATION)

cc w/ enclosures:

R. Pleniewicz, Site Vice President

R. Bax, Station Manager

A. Misak, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory

.

Services Manager

NRR/DRIS/RSGB9D

NMSS/HIDG0N/4E4

OE Director

cc w/ enclosures, w/o

SAFEGUARDS INFORMATION

OC/LFDCB

Resident Inspectors LaSalle

Dresden, Quad Cities

Richard Hubbard

'

J. W. McCaffrey, Chief, Public

Utilities Division

Licensing Project Manager, NRR

Robert Newmann, Office cf Public

'

Counsel

State Liaison Officer

,

Chairman, Illinois Commerce

'

Commission

l

'

RIII

RI If ~

'

E7elocure Contains

RI

RIII

I

Madeda/jp

r ed

iland

Jtrrgensen

smanans IrrcanTIon

08/$/93

)

&d-13

Upco sopration This

!

Toce Is r e tm P rd

{

,

.

,

. -

- - - - - - - - -

- - -

-

- -

. - -