Forwards Insp Rept 50-302/93-13 on 930502-0605 & Notice of Violation.W/O Notice of Violation
ML20046B790
Person / Time
Site: Crystal River 
Issue date: 07/01/1993
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beard P
FLORIDA POWER CORP.
Shared Package
ML20046B791 List:
References
NUDOCS 9308060218
Download: ML20046B790 (3)


See also: IR 05000302/1993013

Text

.

.

.

JUL -l 1993

i

i

i

Docket No. 50-302

License No. DPR-72

,

Florida Power Corporation

Mr. P. M. Beard Jr.

Senior Vice President, Nuclear Operations

ATTN: Manager, Nuclear Operations Licensing

P. O. Box 219 - NA-21

Crystal River, FL 34423

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-302/93-13)

This refers to the inspection conducted by P. Holmes-Ray and R. Freudenberger

of this office on May 2 - June 5,1993. The inspection included a review of

activities authorized for ycur Crystal River facility. At the conclusion of

the inspection, the findirgs were discussed with those members of your staff

identified in the enclosr,d report.

Areas examined during che inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

,

Violation (Notice).

The violation is of concern because the examples all

involved errors which occurred during a period of high demand on operations

department resources and which resulted in operation of the facility in

abnormal system configurations.

In addition, the enclosed Inspection Report

identifies activities that violated NRC requirements that will not be subject

to enforcement action because the liceasee's efforts in identifying and/or

.

correcting the violation meet the criteria specified in Section VII.B. of the

Enforcement Policy.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter, its enclosures, and any reply will be placed in the NRC Public

Document Room.

I

/

.

jl

9309060218 930701

DR

ADDCK 0500

2

_

.

.

9

.

.

3

~

Florida Power Corporation

2

,

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

'

ORIGNAt SGNFP SY

1AARVIN V. SawLE

Marvin V. Sinkule, Chief

Reactor Projects Branch 2

Division of Reactor Projects

,

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encls:

Gary L. Boldt

Vice President, Nuclear Production

Florida Power Corporation

P. O. Box 219-SA-2C

4

Crystal River, FL 34423-0219

i

.

B. J. Hickle, Director

Nuclear Plant Operations

Florida Power Corporation

P. O. Box 219-NA-2C

"

Crystal River, FL 34423-0219

R. C. Widell, Director

l

Nuclear Operations Site Support

Florida Power Corporation

i

P. O. Box 219-NA-21

Crystal River, FL 34423-0219

Gerald A. Williams

Corporate Counsel

Florida Power Corporation

MAC - ASA

P. O. Box 14042

-

'

St. Petersburg, FL 33733

Attorney General

1

Department of Legal Affairs

The Capitol

Tallahassee, FL 32304

j

i

cc w/encls cont'd:

(See page 3)

j

,

l

4

m

-

- ,

.

Florida Power Corporation

3

JUL -l 1993

i

cc w/encls cont'd:

Bill Passetti

Office of Radiation Control

Department of Health and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee, FL 32399-0700

Administrator

Department of Environmental

Regulation

!

Power Plant Siting Section

State of Florida

2600 Blair Stone Road

Tallahassee, FL 32301

.

Joe Myers, Director

Division of Emergency Preparedness

Department of Community Affairs

'

2740 Centerview Drive

Tallahassee, FL 32399-2100

,

!

Chairman

j

Board of County Commissioners

i

Citrus County

5

110 N. Apopka Avenue

Inverness, FL 36250

j

,

Robert B. Borsum

B&W Nuclear Technologies

1700 Rockville Pike, Suite 525

i

Rockville, MD 20852-1631

bec w/encis-

K. Landis, RII

S. Vias, RII

H. Silver, NRR

Document Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

6745 N. Tallahassee Road

Crystal River, FL 34428

R 440RP

RI (RP

4 71)

RS'hin

['KL dis

m

07/ [ /93

l07/ \\ /93

,