Text
,
~.
k l
d-Pubbc Service Decinc and Gas Gepny Stanley LaBruna Pubhc Service Dectnc and Gas Company P.o Box 236. Hancocks Bridge. NJ 08038 609-339-1700 v.a P,wo.mv - mow Enwwe %
NLR-N93120 LCR 92-10 United States Nuclear Regulatory Commission Document Control Desk 1j Washington, D.C.
20555 Gentlemen:
RESPONSE TO NEW JERSEY STATE COMMENT SALEM GENERATING STATION UNIT 2 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 In a letter dated January 25, 1993, Public Service Electric and Gas Company (PSE&G) submitted a request for amendment of Facility operating License DPR-75 for Salem Generating Station, Unit No.
2.
The proposed changes revised the plant heatup and cooldown curves based on data obtained from analysis of Capsule X, which was withdrawn from Salem Unit 2 during the sixth refueling outage.
In a letter dated May 21, 1993, The State of New Jersey (Bureau of Nuclear Engineering) notified the NRC that the revised heatup curve, Page 3/4 4-28, incorrectly showed the area of acceptable operation above the criticality limit.
1 PSE&G offers the following response tc this comment.
Technical Specification page 3/4 4-28 is a graph, with the axes indicated pressure (PSIG) and indicated temperature (Degrees F).
The graph contains three limitation curves, a leak test limit, a heatup limit and a criticality limit.
These curves are independent of each other.
The heatup curve defines the allowable combinations of pressure and temperature for specific temperature change rates as below and to the right of the limit line.
Unacceptable operation is defined above and to the left of the curve.
When considering acceptable pressure-temperature combinations for plant heatup, the criticality curve can be disregarded.
Whether the " acceptable operation" label is placed above or below the criticality curve is immaterial.
031111 i
9309050186.930729 E3
.yy
)
PDR ADOCK 05000311 Mi P
{&]
L i
~
1 Document Control Desk 2
JUL 2 91993 NLR-N93120 i
Should you have any questions on this transmittal, please contact us.
Sincerely, k
i i
E C
Mr.
T.
T. Martin, Administrator - Region I U.
S.
Nuclear Regulatory Commission I
475 Allendale Road i
King of Prussia, PA 19406 Mr. J.
C.
Stone, Licensing F'oject Manager - Salem U.
S.
Nuclear Regulatory Commission One White Flint North
- i 11555 Rockville Pike Rockville, MD 20852 Mr.
T. P. Johnson (SO9)
USNRC Senior Resident Inspector Mr.
K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 j
l
-i i
1 l
LIMITING ART AFTER 15 EFPY:
1/4T, 151*F 3/4T, 102*F 2000 E4 ifs;'a i i i i!
i,i
! i, f
i 4
i i
i i i iiiiil l i il l i r
4 i
i j
i i
LEAK TEST LDi!T
/
/
/
I 2250
/
/
i i
j I
I
/
i i
t i I!
I t
t il f !
I i
l l
"~~'
b n
i j
k j
j u
n i
i e
I I
l
!/
/
i 1750
'/
l 9
A
! }
I
/
- /
~
1 I
/
7 1500
' UNACCFFTABl.E
- /
/
ACCEPTA3LE O N ON
+
OPEP.ATION e
i 6
i
/*
/
i v
i i
--6 w 1250 l
l J
3
,/
1 g
i i
e i
f 1000 l
l
/
O L,
h
_- ;_ HEATL7 RATE UP
/
I i
w I
p/
0 to 60 F/HR u
750 r-q i
g 6
4 1
/!
i i
i a
i i
i if i
i a
j CRmCALITY LIMIT L
/
500 l
l B ASED ON INSERVICE l
HYDROSTAllC TY.ST TEMPERATURE (284 0F)
Z r
i i
250 l
l i
FOR TTrIE SERVICE PERIOD &
UP TO 15 EFPY 1.-
i I ilI i f II I II1 iiiii t
i i
i g
? I ili+ l I IIIii1 11 I O
50 100 150 200 250 300 350 400 450 500 twoscATED ttwPERATURE (oto.r)
SALEM UNIT 2 REACTOR COOLANT SYSTEM HEATUP LIMITATIONS APPLICABLE FOR THE FIRST 15 EFPY WITH MAXIMUM HEATUP RATE OF 60 F/HR.
CURVE CONTAINS NO MARGIN FOP INSTRUMENT ERROPS.
i SALEM JNIT 2 3/4 '4-28 AMENDMENT NO.