Proposed Revised TS Page 6.7-5 Incorporating Ref to Revised Methodologies Described in WCAP-13677 & NSPNAD-93003
ML20046B580
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/29/1993
From:
NORTHERN STATES POWER CO.
To:
Shared Package
ML20046B562 List:
References
NUDOCS 9308050183
Download: ML20046B580 (2)


Text

.....

Exhibit C Prairie Island Nuclear Generating Plant License Amendment Request Dated July 29, 1993 Revised Technical Specification Page Exhibit C consists of a revised page for the Prairie Island Nuclear Generating Plant Technical Specifications with the proposed changes incorporated. The revised page is listed below:

Pa r.e -

TS-6.7-5 n

9308050183 930729 t;"l PDR ADOCK 05000282 ha p

PDR LM

I l

TS.6.7-5 I

1 XN-NF-77-57 (A), XN-NF-77-57, Supplement-1 (A), " Exxon Nuclear Power Distribution Control for Pressurized Water Reactors Phase l

II", May, 1981 l

WCAP-13677-A, "10 CFR 50.46 Evaluation Model Report: W-COBRA / TRAC 2-Loop Upper Plenum Injection Model Update to Support ZIRLOn4 j

Cladding Options", April 1993 1

NSPNAD-93003-A, " Transient Power Distribution Methodology",

l (latest approved version)

I

c. The core operating limits shall be determined such that all j

applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as I

shutdown margin, and transient and accident' analysis limits) of j

the safety analysis are met.

i

d. The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements thereto, shall be supplied upon issuance, for each reload cycle, to the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.

t T

B. REPORTABLE EVENTS The following actions shall be taken for REPORTABLE EVENTS:

a. The Commission shall be notified by a report submitted pursuant to the requirements of Section 50.73 to 10 CFR Part 50, and
b. Each REPORTABLE EVENT shall be reviewed by the Operations Committee and the results of this review shall be submitted to the Safety Audit Committee and the Vice President Nuclear Generation.