Forwards Safety Insp Repts 50-334/93-11 & 50-412/93-12 on 930517-21,25-28,0607 & 0713 & Nov.Lack of Test Control Evident
ML20046B338
Person / Time
Site: Beaver Valley
Issue date: 07/28/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20046B339 List:
References
NUDOCS 9308040093
Download: ML20046B338 (3)


See also: IR 05000334/1993011

Text

.

.

[

'i' 2 " E 3

Docket Nos. 50-334

50-412

Mr. J. D. Sieber

Senior Vice President

Nuclear Power Division

Duquesne Light Company

Post Office Box 4

Shippingport, Pennsylvania 15077

Dear Mr. Sieber:

SUBJECT:

NRC COMBINED INSPECTION REPORT NOS. 50-334/93-11 AND

50-412/93-12

This refers to the announced safety inspection conducted by Mr. M. Buckley of this office

from May 17 to 21,1993, and May 25 to 28,1993, on site with additional information

provided between June 7 and July 13, 1993. The findings of the inspection of this additional

information was forwarded to your staff on July 13, 1993. The inspection included a review

of activities authorized for the Beaver Valley Power Station in Shippingport, Pennsylvania.

At the conclusion of the onsite inspection, the findings were discussed with Mr. D. Spoerry

and other members of your staff.

Areas examined during the inspection are discussed in the enclosed report. The purpose of

this inspection was to followup on your activities, concerning Generic Letter 89-10, to

determine that motor-operated valves (MOVs) are being maintained in a condition that

ensures they will perform their function during accident conditions. MOVs play an

important role in protecting the health and safety of the public by assuring reliable operation

of safety-related valves during design-basis accident conditions. The inspection consisted of

an examination of the MOV testing program and a review of previously identified MOV

issues.

Based on the results of this inspection, certain of your activities appeared to be in violatiori

of NRC requirements, as specified in the enclosed Notice of Violation. A lack of test

control was evident in that ICH-MOV142 was overthrusted to the point where the stem was

bent, the anti-rotation device of 1FW-MOV151C was overtorqued during tests, and Nuclear

Engineering inaccurately dispositioning an administrative overthrust condition for 1CH-

MOV275C.

030019

A:BV931112. INS

l

OFFICIAL RECORD COPY

(j} '

9309040093 930728

I

PDR

ADOCK 05000334

O

PDR

_ _ _ _ _ _ _ _ _ _ _ _

.

JUL 2 8 g)g3

.

Mr. J. D. Sieber

2

You are required to respond to this letter and should follow the instructions specified in the

'

enclosed Notice of Violation when preparing your response. In your response, you should

document the specific actions that you have taken and any additional actions you plan to

prevent recurrence. After reviewing your response to this Notice, including your proposed

corrective actions and the results of future inspections, the NRC will determine whether

further NRC enforcement action is necessary to ensure compliance with NRC regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject to the clearance

1

procedures of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1989, Pub. L No. 96.511.

l

Sincerely,

l

1

l

Jacque P. Durr, Chief

Engineering Branch

Division of Reactor Safety

Enclosures:

1. Notice of Violation

2. NRC Inspection Report Nos. 50-334/93-11 and 50-412/93-12

A:BV931112. INS

OFFICIAL RECORD COPY

_ _ _ _ _ _ _ _ _ - _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

_ ___

_

_

-.

.-

1

.

,.

1'

JUL 2 8.1993

.

'

Mr. J. D. Sieber

3

i

cc w/encis:

G. S. Thomas, Vice President, Nuclear Services

g

!

D. E. Spoerry, Vice President, Nuclear Operations

L. R. Freeland, General Manager, Nuclear Operations Unit

K. D. Grada, Manager, Quality Services Unit

N. R. Tonet, Manager, Nuclear Safety Department

H. R. Caldwell, General Superintendent, Nuclear Operations

i

{

K. Abraham, PAO, (2 copiesi

'

Public Document Room (PI:- )

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

State of Ohio

i

l

bec w/encls:

Region I Docket Room (with concurrences)

SRI, Perry, Region III

bec w/encls (VIA F MAIL):

W. Butler, NRR

G. Edison, NRR

V. McCree, OEDO

[

t

i

i

'

.

l

l

RI:DRS

RI:-

S

RI:DRS

Buckley

Ea n

Durr

-,,;,7

7//093

7//fi93

7pf93

l

A:BV931112. INS

OFFICIAL RECORD COPY

l

'

l