ML20046B295
| ML20046B295 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 07/30/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cottle W HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20046B296 | List: |
| References | |
| NUDOCS 9308040036 | |
| Download: ML20046B295 (5) | |
See also: IR 05000498/1993020
Text
= - ,
.
.
4
g@ M o
uq?
NUCLEAR REGULATORY COMMISSION
y,
g
,
~
I (/2
REGION IV
,
o, -
[
611 RYAN PLAZA DRIVE. SUITF 400
'y
AR LINGTON, T E XAS 76011-8064
....+
_
JUL 3 01993
Dockets:
50-498
50-499
Licenses:
NPF-80
,
Houston Lighting & Power Company
ATTN: William T. Cottle, Group
'
Vice President, Nuclear
P.O. Box 1700
Houston, Texas 77251
[
SUBJECT:
NRC INSPECTION REPORT NO. 50-498/93-20; 50-499/93-20 (NOTICE OF
VIOLATION)
This refers to the inspection conducted by Mr. J. 1. Tapia, and the inspectors
identified in the attached report, of this office on May 23 through July 3,
1993.
The inspection included a review of activities authorized for your
South Texas Project, Units 1 and 2, facility. At the conclusion of the
inspection, the findings were discussed with you and those members of your
staff identified in the enclosed report.
l
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
,
and representative records, interviews with personnel, and observations of
activities in progress.
The purpose of the inspection was to determine
whether activities authorized by the license were conducted safely and in
accordance with NRC requirements.
Based on the results of this inspection, certain activities appeared to be in
violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
The violation involved failure to include an active field
t
change in a surveillance test procedure revision.
It is of concern because
actions taken in response to a previous violation failed to prevent the
current violation from occurring.
You are required to respond to this letter and should follow the instructions
,
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
930804o036 930730
$DR
ADOCK 05000498
?p { l
/ /
I
-
.
..
.
-
.
.
.
- .- . ,
!
.
h
,
!
.
.
Houston Lighting & Power Company
-2-
,
i
!
l
The response directed by this letter and enclosed Notice are not subject to
,
the clearance procedures of the Office of Management and Budget, as required
l
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
'
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
i
Sincerely,
!
"
!
,
'
s
-
A
!
.
A. Bill Be
h, Director
/
Division o Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violaticn
2.
Appendix B - NRC Inspection Report
l
50-498/93-20;-50-499/93-20 w/ attachment
>
l
cc w/ enclosures.
Houston Lighting & Power Company
l
ATTN: James J. Sheppard, General Manager
i
Nuclear Licensing
!
P.O. Box 289
i
Wadsworth, Texas 77483
!
City of Austin
Electric Utility Department
ATTN:
J. C. Lanier/M. B. Lee
721 Barton Springs Road
i
,
t
City Public Service Board
,
,
ATTN:
K. J. Fiedler/M. T. Hardt
P.O. Box 1771
l
'
San Antonio, Texas 78296
'
4
'
Newman & Holtzinger, P. C.
ATIN:
Jack R. Newman, Esq.
1615 L Street, NW
Washington, D.C.
20036
Central Power and Light Company
ATTN:
D. E. Ward /T. M. Puckett
P.O. Box 2121
Corpus Christi, Texas 78403
,
6
F
T
-- -
.
. . _ . .
.-. --
-
.
.
._
.. . - - - - . . .
. .. . .
-. . ..-
.i
i
- ..
i
Houston Lighting & Power Company
-3-
i
' i
INP0
!
Records Center
!
700 Galleria Parkway
!
Atlanta, Georgia 30339-5957
!
t
Mr. Joseph M. Hendrie
j
50 Bellport Lane
j
Bellport, New York 11713
Bureau of Radiation Control
l
State of Texas
3
1100 West 49th Street
Judge, Matagorda County
l
Matagorda County Courthouse
l
1700 Seventh Street
l
Bay City, Texas 77414
l
- 1
Licensing Representative
!
Houston Lighting & Power Company
j
Suite 610
j
Three Metro Center
i
Bethesda, Maryland 20814
l
- l
Houston Lighting & Power Company
' i
ATTN:
Rufus S. Scott, Associate
General Counsel
P.O. Box 61867
Houston, Texas 77208
'
i
N
i
!
t
i
!
!
?
4
0
. i
-
!
$
!
t
i
)
.
--me
p-
+
u--w
l
.
-
JUL 301993
Houston Lighting & Power Company
-4-
bcc to DMB (IE01)
-
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/A)
Lisa Shea, RM/ALF, MS: MNBB 4503
,
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/A)
'
R. Bach:aann, OGC, MS: '5-B-18
Section Chief (DRP/TSS)
,
A. D. Beach, D:DRP
G. A. Pick, SRI, WC
,
- RIV: SRI
- RI
- TL:DRS
- RI
- DRS
- DRS
JITapia/1r
RJEvans
PCWagner
JMKeeton
RBVickrey
MFRunyan
/ /93
/ /93
/ /93
/ /93
/ /93
/ /93
- SC:DRP/A
D:DR
WDJohnson
ABBeach[
/ /93
(/y/93
- Previously Concurred
o
!
JUL 3 01993
<
Houston Lighting & Power Company
-4-
i
- bec to'DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/A)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/A)
R. Bachmann, OGC, MS: 15-B-18
Section Chief (DRP/TSS)
A. B. Beach, D:DRP
G. A. Pick, SRI, WC
t
.
!
,
!
- RIV: SRI
- RI
- TL:DRS
- RI
- DRS
- DRS
JITapia/lr
RJEvans
PCWagner
JMKeeton
RBVickrey
MFRunyan
/ /93
/ /93
/ /93
/ /93
/ /93
/ /93
- SC:DRP/A
D:DRR$
WDJohnson
f;pBeach7
/ /93
(/?p/93
- Previously Concurred
i
,
030011
l