Forwards Insp Rept 50-213/93-08 on 930509-0619 & Notice of Deviation
ML20046B274
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/26/1993
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20046B275 List:
References
NUDOCS 9308040013
Download: ML20046B274 (3)


See also: IR 05000213/1993008

Text

i'

.

JUL 2 61993

[

Docket No. 50-213

,

1

Mr. John F. Opeka

l

Exeutive Vice President - Nuclear

Connecticut Yankee Atomic Power Company

,

P.O. Box 270

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT: NRC INSPECTION REPORT NO. 50-213/93-08

This letter transmits the report of the safety inspection conducted by Messrs. W. Raymond

and P. Habighorst of this office during the period May 9,1993, to June 19,1993, at the

Haddam Neck Plant, Haddam Neck, Connecticut. The report covers activities authorized by

'

'

NRC License No. DPR-61. This inspection focused on issues important to public health and

safety. Preliminary findings were discussed with Mr. J. Stetz of your staff at the conclusion

of the inspection.

,

During this report period, we found Haddam Neck operated in a safe and conservative

,

manner. However, during this inspection we noted that one of the emergency diesel

generator non-emergency trips did not function as described in the Update Final Safety

_

Analysis report, as specified in the enclosed Notice of Deviation. The deviation is of concern

because periodic testing did not identify the deficiency, and is another example of equipment

,

configuration deficiencies potentially affecting safety-related equipment. Previous

deficiencies were (1) the wire discrepancy on the 'B' service air compressor (NRC Inspection

Report 50-213/92-04), and (2) the wiring error in the 115 kilovolt breaker failure protection

circuit (Augmented Inspection Team Inspection No. 50-213/93-80). You are required to

respond to this letter and should follow the i1structions specified in the enclosed Notice when

i

preparing your response.

We appreciate your cooperation.

!

Sincerely,

Orird O ' $ 3/

A. Randolph Blough, Chief

030016

Projects Branch No. 4

,

,

Division of Reactor Projects

!

Enclosures:

NRC Region I Inspection Report No. 50-213/93-08,

,

Appendix A, Notice of Deviation

h

9308040013 930726

[I

{

PDR

ADOCK 05000213

G

ppg

,

,

.,

'

JUL 2 61993

.

Connecticut Yankee Atomic

2

Power Company

'

,

cc w/ encl:

,

W. D. Romberg, Vice President, Nuclear. Operation Services

J. P. Stetz, Vice President, Haddam Net'r ' tation

G. H. Bouchard, Director, Nuclear Quality Services

,

D. J. Ray, Unit Director

'

R. M. Kacich, Director, Nuclear Licensing

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

K. Abraham, PAO (2)

Public Document Room (PDR)

Imal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

i

State of Connecticut SLO

,

b

1

l

I

-

. -_

JUL 2 61993

.

.

Connecticut Yankee Atomic

3

Power Company

bec w/ encl:

Region I Docket Roc.n (with concurrences)

bec w/enci (VIA E-MAIL):

J. Stolz, NRR/PD I-4

V. McCree, OEDO

A. Wang, PM, NRR

i

,

i

l

'

f

.

k

!

'i

i

.

RI:DRP

RI:DRP

N RI:DRP

-

'

g RAYMOND

DOERFLEIN

BLOUGH

~7/26/93

~T/a4/93

7 /u /93

OFFICIAL RECORD COPY

G:\\ BRANCH 4\\HN9308.lNS

.

--

.

-

,

,

. . _