ML20046A957

From kanterella
Jump to navigation Jump to search
Forwards Rev 48 to McGuire Nuclear Station Physical Security Plan That Addresses Devitalization of Designated Vital Area & Potential Use of Rifles in Contingency Response Program. Plan Withheld,Per 10CFR73.21
ML20046A957
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 07/28/1993
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9308020148
Download: ML20046A957 (2)


Text

I I

SAEGUARDt, w;\\a...a m

& I% J I C U w ',

Dakefrur*Compay 1:~O6 Hage rs lim kys t VG! I A i r g y:[ y toy [, 3 ',,L,,,,,.,,*..,

g, y,,q, n 7 McC:nre %uclea' Go nor& n De;ptunt 1

,, i.p., p,,,

,,,v. p, y ya YhEN S,c..,. --.- ~ 7

Hw: tor.sulle AC :% ^ n.>

ATTA? E

~

DUKE POWER July 28,1993 U. S. Nuclear Regulatory Commission ATTS: Document Control Desk Washington, D.C. 20555

Subject:

McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Physical Security Plan. Revision 48 Gentlemen:

As required by 10 CFR 50.54(p), enclosed are four copies of Revision 48 to the McGuire Nuclear Station Physical Sccurity Plan that addresses the devitalization of a designa.ed vital area during unit refueling outages and/or major maintenance. In addition, Revision 48 address:s the potential use of rifles in the contingency response program and refers to the Nuclear Security Training and Qualification Plan (Revision 1) for rifle training and qualification criteria. Revision 1 to the Training and Qualification Plan is teing prepared for separate submittal to the NRC. ne enclosed Synopsis of Changes details the specific text changes These changes do not decrease the effectiveness of the McGuire Nuclear Stauon Physical Security Plan.

Since Revision 48 details features of the McGuire Nuclear Station security system,I request Revision 48 be withheld from public disclosure pursuant to 10 CFR 73.21.

Very Truly Yours.

/

f)f L.

T. C. McMeckin Attachment A /

930B020148 93072s

/ pj A

fDR ADOCK 05000369 8 4r "o"

t-i s, u.,,a -

i U. S. Nuclear Regulatory Commission i

July 28,1993 Page 2 t

xc:

W/2 Copies of Enclosures Mr. S. D. Ebneter Regional Administrator, Region 11 U. S. Nuclear Regulatory Commission P. O. Box 2257 Atlanta, Georgia 30301 W/O Enclosures Todd Cooper

]

McGuire Resident inspector j

Victor Nerses ONRR McGuire Project Manager I

e f

i I

I

?

i 5

l l

..a

-