__

O pn **cv 3~*# i%

UNITED STATES 1

NUCLEAR REGULATORY COMMISSION 3l

~

[

WASHINGTON, D.C. 20556 g

o.

J

%n/

...+

SUBJECT:

SUMMARY

OF MEETING WITH COMBUSTION ENGINEERING OWNERS GROUP The subject meeting was held on April 8,1993 at the Nuclear Regulatory Commission (NRC) Headquarters in Rockville, Maryland. The objectives of the meeting were to facilitate communications between the Combustion Engineering Owners Group (CE0G) and the NRC, to summarize active CEOG programs, to review the status of CEOG submittals, and to discuss issues 'of concern to the NRC.

Enclosed is a copy of the meeting. agenda, the CE0G presentation slides, the meeting attendance list, and topical report review status.

A member of each CE0G subcommittee provided an overview of the issues being addressed, CE0G and NRC interactions on the issues, status, and requested NRC action.

Each subcommittee presenter also gave details of other activities being worked on by the Owners Group.

The status of various CE0G submitted CE topical reports was discussed during the presentations. As in previous CE0G-NRC meetings, the NRC stressed that the schedule of the review of topical reports could be affected by NRC resource limitations.

A question was raised by Dr. Murley to the CE0G Licensing Subcommittee regarding license renewal of CE plants. The CE0G has stated that it is working on a first phase of the renewal issue with EPRI and that it may later identify a lead plant for review. Dr. Murley encouraged the CE0G's efforts and stated that instead of focusing on a lead plant approach the CEOG should try to resolve as many license renewal issues as possible on a generic CE basis.

Enclosures:

1.

Agenda 2.

CEOG Presentation 3.

Attendance List 4.

Topical Report Status cc w/

Enclosures:

l T. Murley F. Miraglia J. Partlow W. Russell NRR Division Directors NRR Branch Chiefs /PDs 4

9307270119 930420 PDR TOPRP EMVC-E C

PDR l

l,l k

g O.

0

.)-

DISTRIBUTION LIST FOR

SUMMARY

OF MEETING WITH COMBUSTION ENGINEERING OWNERS GROUP DATED APRIL 20,1993 Central Files NRC and. Local PDRs DRPE Reading = File-

' Licensing Assistant.

OGC E. Jordan

-NRC Participants ACRS-(10)

V. McC-ee, ED0 i

L. Plisco, E00 G. Grant, ED0

'J. Mitchell, ED0' ~

C. Hehl, Region I E. Merschoff, Region II E. Greenman, Region III-A. Beach, Region-IV K. Perkins, Region-V.

l L

\\

w Y

c.n J-NRC FILE CENTEli COPY gsm#

L

(?s<kayw@t-C PROPOSED AGENDA FOR C-E OWNERS GROUP /NRC MEETING April 8, 1993 1:30 pm Introductory Remarks J. Partlow (NRC)

W. Conway (CE0G)

Review of Interaction between CEOG & NRC and NRC status of C-E Topical Report Reviews CEOG Overview of Technical Activities NRC Discussion Topics - including Feedwater Pipe Cracking, any Problem in CE Plants?

Review Action Items and Commitments 3:30 pm Adjourn

u

,..JE i

O W

e W

o>

m

-2 v-m a

o a

E tc 2

fl.

N

<C C

Ow O

j

AGENDA g

1:30pm OPENING STATEMENTS - JAhES PARTLOW (NRC), BILL CONWAY (APS) 1:45 P M ACTIVITY REPORTS - JIM ALDERINK (CPC)

ANALYSIS SUBCOMMITTEE / JERRY HOLMAN (ENTERGY WSES)

O-SEVERE ACCIDENTS WORKING GROUP / JERRY HOLMAN (ENTERGY - WSES)

LICENSING SUBCOMMITTEE / BRUCE MONTGOMERY (BG&E)

OPERATIONS SUBCOMMITTEE / BRUCE MONTGOMERY (BG&E)

RELIABILITY AND AVAILABILITY SUBCOMMITTEE / RALPH PHELPS (OPPD)

INSTRUMENTATION AND CONTROLS WORKING GROUP / RALPH PHELPS (OPPD)

MATERIALS AND CHEMISTRY SUBCOMMITTEE / DON WRIGHT (BG&E)

O..

ALLOY 600 WORKING GROUP / MIKE MELTON (APS)

NRC STATUS OF REVIEW OF CEOG TOPICAL REPORTS (NRC) 2:45PM 3:00PM NRC DISCUSSION TOPICS (NRC) 3:25PM REVIEW OF ACTION ITEMS (CEOG AND NRC) i 3:30PM ADJOURN i

' CEOONRCCMP MISC olt

6 OPENING REMARKS g

O' INTRODUCTIONS MEETING OBJECTIVES i

i i

REVIEW INTERACTION BETWEEN CEOG AND NRC g,

t i-GOONRCCHP MISC O!S

i l

MEETING OBJECTIVES g

i S

FACILITATE COMMUNICATIONS l

i SUMMARIZE ACTIVE CEOG PROGRAMS REVIEW STATUS OF CEOG SUBMITTALS e:

1 DISCUSS ISSUES OF CONCERN TO THE NRC l

t

- - ccio. mse m.

.r 9

CEOG EXECETIVE COMMITTEE

<g MEMBERS BILL CONWAY (APS)- CMAIRMAN DAVE SAGER (FPL)- VICE CHAIRMAN GEORGE CREEL (BG&E)

DAVE HOFFMAN (CPC)

JERRY YELVERTON (ENTERGY - ANO) i ROSS BARKHURST (ENTERGY - WSES)

CHARLES FRIZZLE (MY)

O ERIC DeBARBA (NU)

BILL JONES (OPPD)

HAROLD RAY (SCE)

BILL SKIBITSKY (ABB)

GOONRCGF MISC 018

i CEOG COMMITTEE MEMBERS g

RAY BURSKI (ENTERGY - WSES) - CHAIRMAN JIM ALDERINK (CPC)- VICE CHAIRMAN RON STEVENS (APS)

JIM LIPPOLD (BG&E)

RICK ESPOLT (ENTERGY - ANO)

JOHN HUTCHINSON (FPL)

JIM HEBERT (MY)

RIK WELLS (NU)

RALPH PHELPS (OPPD)

DAVE PILMER (SCE)

BILL GOODWIN (ABB) i e

i CEDONRCCHP MISC 018

-A.

-h h-A6..-

E-S 4

--.n b 4 4.E

-a.ak ke

-4.A 4-mus CEOG OFFICERS g

CHAIRMAN RAY BURSKI(ENTERGY)

O VICE CHAIRMAN JIM ALDERINK (CPC)

STEERING COMMITTEE RALPH PHELPS (OPPD)

JOHN HUTCHINSON (FPL)

REGULATORY RESPONSE GROUP g

j CHAIRMAN RIK WELLS (NU)

~

VICE CHAIRMAN PAT DONNELLY (CPC) l

+

COMBUSTION ENGINEERING OWNER'S GROUP - 1993 CHAIRMAN EXECUTIVE RAY BURSKI COMMITTEE

~~~

(ENTERGY)

CHAIRMAN VICE CHAIRMAN (504) 739-6774 BILL CONWAY (APS)

JIM ALDERINK(CPC)

(602) 250-3900 g

(616) 764-8913 VICE CHAIRMAN DAVE SAGER (FPL)

PROJECT MANAGER REGULATORY B

RESPONSE GROUP (203)285-5494 RICK WELLS (NU)

(203) 665-3614 i

S/C RELIABN &

ANALYSIS S/C OPERATIONS S/C MATERIALS &

BRUCE AVAILABILITY S/C HOWARD JONES STEVE BR]NKMAN CHEMISTRY S/C MONTGOMERY LINDY BRAMLETT (MY)

(NU)

SCOTT BOGGS (FPL)

(207) 882-5122 (203)444-5321 (407) 694-4207 (410 2 929 (5

- 519 INSTRUMENTATION SEVERE ACCIDENT W/G ALLOY 600 W/G AND CONTROLS JERRY HOLMAN MIKE MELTON (APS)

WORKING GROUP (ENTERGY)

(602) 340-4623 TIBBS GOLLADAY (504) 739-6265 (ENTERGY)

(504)739-6262 GOGNRCCHP MISC 0t8 a

.c t

C-E OWNERS GROUP MAJOR g

EMPHASIS FOR 1993 RESPOND TO NRC SAFETY CONCERNS OBTAIN NRC APPROVAL OF VARIOUS CEOG SUBMITTALS PURSUE NEW PROGRAMS TO SHORTEN OUTAGE DURATION AND REDUCE OUTAGE RISK e

SUPPORT NUMARC INITIATIVES PURSUE NEW PROGRAMS THAT REDUCE OPERATIONS AND 9l MAINTENANCE COSTS SUPPORT LOW CEOG PLANT TRIP RATE CONTINUE TO FACILITATE EFFECTIVE INDUSTRY COMMUNICATION EVALUATE GENERIC IMPLICATIONS OF EMERGING ISSUES FOR CEOG PLANTS CEC 3NRCCHP MISC 018

t 4

ANALYSIS SUBCOMMITTEE g HOWARD JONES (MAINE YANKEE), CHAIRMAN JERRY HOLMAN (ENTERGY OPERATIONS), PRESENTER

- OVERVIEW -

9 l

CEOG/NRC INTERACTION SMALL BREAK LOCA MARGIN IMPROVEMENT PROGRAM i

[

GENERIC EVALUATION OF LOW UPPER SHELF ENERGY i-SURGE LINE THERMAL FATIGUE g.

4 MAIN STEAM LINE LEAK BEFORE BREAK i

I ALTERNATE LOW TEMPERATURE OVERPRESSURE PROTECTION i

(LTOP) P-T LIMITS GOONRCCHP MISC 018

.a i

ANALYSIS SUBCOMMITTEE g OTHER ACTIVITIES MTC SURVEILLANCE TEST MEASUREMENTS SUPPORT OF EPRI THERMAL STRATIFICATION, CYCLING, AND STRIPING (TASCS) PROGRAM 2

MODELING AND EVALUATION OF THERMAL STRESSES IN PIPING l

CONNECTED TO THE RCS SURGE LINE DOCUMENTATION UPDATE O

REACTOR ENGINEER TRAINING PROGRAM INCORE INSTRUMENT LIFE EXTENSION l

CEOONRCO{P MISC 018

f ANALYSIS SUBCOMMITTEE,g SMALL BREAK LOCA MARGIN IMPROVEMENT PROGRAM NRC CONTACT: F. ORR 1

ISSUE G

IMPROVED ECCS EVALUATION MODEL IN RESPONSE TO CHANGES TO APPENDIX K CEOG/NRC INTERACTIONS I

FORMAL RECEIPT OF QUESTIONS IN 1991 STAFF REVIEW OF CEN-373-P & AMENDMENT l-P RESOLVED MANY OPEN O

QUESTIONS CEOG/NRC AGREED SUBSTANTIAL UPGRADE OF THE REPORT IS REQUIRED TO ANSWER QUESTIONS ON MODELS AND CORRELATIONS; STAFF REQUEST CE POSITION ON REPORT STATUS 4

CE WITHDREW REPORT FROM REVIEW ON 9/30/91 UNTIL UPDATE IS c

COMPLETE

-,m sc o,.

~

ANALYSIS SUBCOMMITTEE g SMALL BREAK LOCA MARGIN IMPROVEMENT PROGRAM (cont)

O STATUS CEOG INITIATED PROGRAM TO UPGRADE TOPICAL REPORT REVISED REPORT WILL BE SUBMITTED IN TWO PHASES TO EXPEDITE REVIEW AND APPROVAL; UPGRADED REPORT, CEN-420-P VOL.1 PART 1 SUBMITIED TO STAFF 3/93; OTHER VOLUMES TO BE SUBMI'1TED 9/93 REQUESTED NRC ACTION CONFIRMATION OF REVIEW SCHEDULE, REVIEW AND APPROVE CEN-420-P, VOLUME 1 PART 1 GOONRCCHP MISC. 018

e ANALYSIS SUBCOMMITTEE g GENERIC LOW UPPER SHELF ENERGY EVALUATION NRC CONTACT: BARRY ELLIOT/KEITH WICHMAN 9

ISSUE DEMONSTRATION OF CEOG VESSEL INTEGRITY BELOW 50 FT-LB CRITERIA IN 10 CFR 50 APPENDIX G CEOG/NRC INTERACTIONS CEOG INFORMED NRC THAT A GENERIC BOUNDING ANALYSIS WOULD BE PERFORMED AS REQUESTED BY NRC AT SEPTEMBER j

INDUSTRY MEETING

\\

CEOG SUBMITTED PRELIMINARY EVALUATION'ON SCHEDULE 11/92 NRC STAFF PROVIDED COMMENTS & RECOMMENDATIONS ON PRELIMINARY EVALUATION IN J'ANUARY 1993 CEOONRCCHP MISC 018

ANALYSIS SUBCOMMITTEE g GENERIC LOW UPPER SHELF ENERGY EVALUATION (cont.)

O STATUS CEOG UPGRADING EVALUATION METHODOLOGY MATERIAL PROPERTY ORIENTATION EFFECTS MATERIAL PROPERTY CORRELAIONS FINAL REPORT TO BE SUBMITTED IN APRIL g

l REQUESTED NRC ACTION I

NONE I

GOONRCCHP MISC ots

i ANALYSIS SUBCOMMITTEE,g SURGE LINE THERMAL FATIGUE NRC CONTACT: T. CHAN O

ISSUE SURGE LINE THERMAL STRATIFICATION AND ASSOCIATED e

LOADINGS CEN-387-P REV.1-P DOCUMENTS THE STRUCTURAL INTEGRITY OF CEOG SURGE LINES FOR FORTY YEARS OF OPERATION CEOG/NRC INTERACTIONS 9

CEOG AND NRC MET IN 1991 AND SUCCESSFULLY RESOLVED THE

]

SEVEN OPEN ITEMS IDENTIFIED BY THE STAFF IN 5/91 CEOG ANSWERED ADDITIONAL QUESTIONS POSED BY THE STAFF AND CONSULTANTS; STAFF REQUESTED SUBMITTAL OF REPORT BY

)

12/91 4

CHI 3NRCCHF MISC 018 1

ANALYSIS SUBCOMMITTEE g SURGE LINE THERMAL FATIGUE (cont.)

O STATUS CEN-387-P REV.1-P SUBMITTED TO STAFF FOR REVIEW ON 12/20/91 CEN-387-P REV.1-P REFERENCED BY CEOG UTILITIES TO CLOSE OUT OPERATIONAL JUSTIFICATION TO STAFF AS REQUESTED 9

REQUESTED NRC ACTION I

REVIEW AND APPROVE CEN-387-P, ISSUE SER I

i GOONRCCHP MISC 018

ANALYSIS SUBCOMMITTEE g MAIN STEAM LEAK BEFORE BREAK NRC CONTACT: K. WICHMAN O

ISSUE CEOG REPORT CEN-404 PROVIDES THE ANALYTICAL BASIS AND APPLICABILITY OF LBB FOR THE IN-CONTAINMENT PORTIONS OF MAIN STEAM LINE PIPING IN CE PWRS CEOG/NRC INTERACTIONS ON 7/2/91, REPORT CEN-404, " LEAK BEFORE BREAK EVALUATION OF MAIN STEAM LINE PIPING" WAS SUBMfITED FOR STAFF REVIEW g

STATUS CEOG UNDERSTANDS THAT INITIAL STAFF REVIEW HAS NOT BEGUN; STAFF ASSIGNED LOW PRIORITY BECAUSE OF VESSEL INTEGRITY. ISSUES 4

CEOG MEMBER HAS REQUESTED REVIEW GC3NRCCHP MISC 018 4

4

ANALYSIS SUBCOMMITTEE gg MAIN STEAM LEAK BEFORE BREAK (cont.)

O REQUESTED NRC ACTION CONFIRMATION OF REVIEW SCHEDULE, REVIEW AND APPROVE i

CEN-404 O

ANALYSIS SUBCOMMITTEE,g ALTERNATE LOW TEMPERATURE OVERPRESSURE PROTECTION P-T LIMITS NRC CONTACT: K. WICHMAN O

ISSUE CEN-381-P REV.1-P PROVIDES THE ANALYTICAL AND VALUE IMPACT BASIS TO SUPPORT HIGHER LTOP SETPOINTS THEREBY INCREASING OPERATIONAL l

FLEXIBILITY AND ENHANCING LOWER MODE SAFETY CEOG/NRC INTERACTION MANY MEETINGS WITH THE STAFF SINCE THE PROGRAM BEGAN IN 1986; g

PARTIAL SER ISSUED 5/90 ASME CODE CASE INTIATIVE (1/92)

BASES SIMILAR TO CEOG EFFORT PROVIDES ENABLE TEMPERATURE RELIEF SIMILAR TO CEOG EFFORT SMALL PRESSURE RELIEF COMPARED TO CEOG EFFORT CEOONRCCHP MISC 085

.o ANALYSIS SUBCOMMITTEE,g ALTERNATE LOW TEMPERATURE OVERPRESSURE PROTECTION P-T LIMITS (cont.)

CEOG COMMENTED ON CODE CASE AND RECOMMENDED ITS IMPLEMENTATION TO PROVIDE INTERIM RELIEF CEOG TO PURSUE REVIEW OF TOPICAL REPORT AS LONG TERM SOLUTION METHODS IN TOPICAL REPORT USED TO SUPPORT PLANT SPECIFIC ANALYSES AND GENERIC UPPER SHELF ENERGY EVALUATIONS STATUS g.

REVIEW OF TOPICAL REPORT ON-HOLD REQUESTED NRC ACTION-DEVELOPMENT OF REVIEW SCHEDULE AND ISSUANCE OF FINAL SER CEOONRCCHP MISC 018

4 ANALYSIS SUBCOMNITTEE g OTHER ACTIVITIES INITIATED PROGRAM TO EVALUATE EOC MODERATOR TEMPERATURE COEFFICENT MEASUREMENTS CONTINUING PROGRAM TO SUPPORT AND REVIEW EPRI TASCS 1

PROGRAM AND ITS RESULTS CONTINUING A PROGRAM TO EVALUATE THERMAL STRATIFICATION IN PIPING CONNECTED TO THE RCS O,

COLLECT PLANT DATA (BENCHMARKS)

DEVELOPED PLANT WALK-DOWN PROCEDURES FOR VISUAL INSPECTION OF PIPING AND COLLECTION OF SYSTEM INFORMATION 2

DEVELOPING MODELS TO PREDICT STRATIFICATION IN SI, SDC AND PORV PIPING CEC 3NRCCHP MISC O!8

.m m

m m

L ANALYSIS SUBCOMMITTEE gg OTHER ACTIVITIES (cont.)

O CONTINUING A PROGRAM TO UPDATE SURGE LINE DOCUMENTATION FOR STRATIFIED LOADINGS CONTINUING A PROGRAM TO DEVELOP REACTOR ENGINEER TRAINING MATERIALS AND CONDUCT WORKSHOPS INITIATED A PROGRAM TO EXTEND THE LIFE TIME (DEPLETION LEVEL) FOR INCORE INSTRUMENTS INFORMATION SHARING ANALYSIS METHODS IN USE SHUTDOWN RISK EVALUATIONS FATIGUE USAGE CURVES AND ISSUES ICI REPLACEMENT STRATEGIES FUEL MANAGEMENT & ASSEMBLY TYPES GOONRCOIP MISC 018

SEVERE ACCIDENT WORKING i

GROUP JERRY HOLMAN (ENTERGY OPERATIONS-WATERFORD)

CHAIRMAN

- OVERVIEW -

CEOG/NRC INTERACTION SEVERE ACCIDENT MANAGEMENT GUIDANCE DEVELOPMENT G.L. 88-19, SG OVERFILL PROTECTION O

OTHER ACTIVITIES i

COMPARISON OF IPE LEVEL 1 ANALYSES AMONG MEMBERS WORKSHOP ON IPE LEVEL 2 ISSUES GOGNRCCHP MISC 018

SEVERE ACCIDENT WORKING GROUP SEVERE ACCIDENT MANAGEMENT GUIDANCE NRC CONTACT: R. PALLA O

ISSUE GUIDANCE FOR MITIGATION OF SEVERE ACCIDENTS INVOLVING CORE MELT CEOG/NRC INTERACTIONS ON-GOING MEETINGS BETWEEN STAFF, JOG AMAC(CEOG), AND NUMARC TO DISCUSS DEVELOPMENT OF SEVERE ACCIDENT MANAGEMENT GUIDANCE PRELIMINARY INFORMATION PROVIDED TO NRC FOR INFORMAL REVIEW AND EARLY FEEDBACK STATUS CEOG HAS DEFINED THE STRUCTURE, FORMAT, AND MUCH OF THE CONTENT OF SEVERE ACCIDENT MANAGEMENT GUIDANCE 4

GOGNRCCHP MISC 018 j

I SEVERE ACCIDENT WORKING 'M GROUP SEVERE ACCIDENT MANAGEMENT GUIDANCE NRC CONTACT: R. PALLA O

STATUS (cont.)

CEOG PROGRAM IS BASED UPON IDENTIFYING THE PLANT DAMAGE i

CONDITION AND IMPLEMENTING PRIORITIZED MITIGATING ACTIONS FOR THAT CONDITION CEOG TO SUBMIT FINAL DRAFT VERSION OF AMGS FOR INFORMAL REVIEW BY NRC 6/93 O

REQUESTED NRC ACTION PROVIDE INFORMAL FEEDBACK ON INFORMATION SUBMITTED CONTINUE SUPPORT OF NUMARC AND JOG AMAC INDUSTRY MEETINGS FOR DEVELOPhENT OF AMGS CEOGNRCOIP MISC O!8

l

(

SEVERE ACCIDENT WORKING N i

GROUP G.L. 88-19 SG OVERFILL PROTECTION NRC CONTACT: S. RHOW 1

O ISSUE G.L REQUESTED IMPLEMENTATION OF AN AUTOMATIC SG OVERFILL PROTECTION SYSTEM FOR CE PWRS CEOG/NRC INTERACTIONS IN OCTOBER 1990 CEOG SUBMITTED WRITTEN JUSTIFICATION, g,

BASED UPON SEVERAL ARGUMENTS, THAT AUTOMATIC PROTECTION IS NOT REQUIRED f

CEOG HELD MEETINGS WITH STAFF IN NOVEMBER 1990 TO DISCUSS JUSTIFICATION FOR NOT INSTALLING AN AUTOMATIC FEEDWATER l

PUMP TRIP AS ALLOWED BY G.L.

4 A

CEOONRCCHP MISC. 018

I l

SEVERE ACCIDENT WORKING l

(

l GROUP G.L. 88-19 SG OVERFILL PROTECTION NRC CONTACT: S. RHOW O,

4 STATUS IN JANUARY 1993 NRC STAFF HAD INDICATED THAT FAVORABLE SER IN ACCORDANCE WITH CEOG SUBMITTAL WILL BE ISSUED REQUESTED NRC ACTION g

COMPLETE REVIEW OF CEOG RESPONSE, ISSUE SER GC3NRCCHP MISC 018

t SEVERE ACCIDENT WORKING $M GROUP e

OTHER ACTIVITIES COMPARISON OF IPE LEVEL 1 ANALYSES AMONG MEMBERS l

WORKSHOP ON IPE LEVEL 2 ISSUES e

e 1

CIOGNRCCHP MISC olt

LICENSING SUBCOMMITTEE,g BRUCE MONTGOMERY (BG&E),

CHAIRMAN

-- OVERVIEW -

e 1

i CEOG/NRC INTERACTION RESTRUCTURED STANDARD TECHNICAL SPECIFICATIONS i

ESFAS SUBGROUP RELAY SURVEILLANCE TEST EXTENSION OTHER ACTIVITIES g

SHUTDOWN VULNERABILITY IN TECHNICAL SPECIFICATIONS 3

INSTRUMENT UNCERTAINTIES IN EOPS AND TECHNICAL SPECIFICATIONS (NON KPS/ESFAS) 4 CIDONRCCHP MISC 018

I TJCENSING SUBCOMMITTEE g RESTRUCTURED STANDARD TECHNICAL SPECIFICATIONS NRC CONTACT: C. GRIMES ISSUE DEVELOPMENT OF RESTRUCTURED STANDARD TECH SPECS TO PROVIDE IMPROVED USABILITY OF PLANT TECHNICAL SPECIFICATIONS t

CEOG/NRC INTERACTIONS NUMEROUS PROCESS AND REVIEW MEETINGS TO RESOLVE COMMENTS ON NUREG-1432 FROM 8/91 TO PRESENT REVIEW MEETINGS AND UTILITY EXECUTIVE /NRC MANAGEMENT MEETINGS HAVE RESULTED IN BENEFICIAL PROGRESS AND CLOSURE OF OPEN ITEMS STATUS CEOG SUBMITI'ED COMMENTS ON NUREG-1432 FOR STAFF REVIEW ON 7/30/91 CEC 3NRCCHP MISC 018

l I

l LICENSING SUBCOMMITTEE g RESTRUCTURED STANDARD TECHNICAL SPECIFICATIONS 4

(cont.)

O STATUS (cont.)

NRC ISSUED NUREG 1432 REVISION 0 ON SCHEDULE,9/92 REQUESTED NRC ACTION CONTINUED SUPPORT OF RSTS AND LEAD PLANT IMPLEMENTATION O

2 mmaccomse m

LICENSING SUBCOMMITTEE g ESFAS SUBGROUP RELAY TEST EXTENSION NRC CONTACT: C. DOUTT i

ISSUE D

ESFAS SUBGROUP RELAYS ARE TESTED MONTHLY IN MANY 1

PLANTS. THE OTHER RPS/ESFAS TESTING IS ACCOMPLISHED LESS FREQUENTLY (QUARTERLY, OR LONGER)

CEOG/NRC INTERACTIONS CEN-403, "ESFAS SUBGROUP RELAY TEST INTERVAL EXTENSION",

SUBMITTED TO STAFF FOR REVIEW ON 7/31/91 g

CEOG AND STAFF MET ON 10/30/91 TO DISCUSS THE BASIS AND l

METHODOLOGY FOR EXTENSION OF THE SUBGROUP RELAY TEST INTERVAL STAFF PROVIDED REQUEST FOR ADDITIONAL INFORMATION (RAI) 7/92 i

CEOONRCCHP MISC 0tB

LICENSING SUBCOMVIITTEE g ESFAS SUBGROUP RELAY TEST EXTENSION (cont.)

O STATUS (cont.)

CEOG INITIATED TASK TO ADDRESS QUESTIONS IN RAI WHICH INCLUDES NRC I.N. 92-04 i

NRC ISSUED NUREG 1366 ENDORSING THE SUBJECT SURVEILLANCE EXTENSION l

REQUESTED NRC ACTION 9

CONTINUE FORMAL REVIEW OF CEN-403 AND SUPPLEMENTAL INFORMATION 4

APPROVE CEN-403, ISSUE SER CIE3NRCCHP MISC.018

LICENSING SUBCOMMITTEE g OTHER ACTIVITIES CONTINUING A PROGRAM TO EVALUATE SHUTDOWN CONDITIONS IN gl TECHNICAL SPECIFICATIONS AND REVIEW DRAFT NUREG-1449, NRC STAFF EVALUATION OF SHUTDOWN AND LOW POWER OPERATION INITIATED PROGRAM ON APPLICATION OF INSTRUMENT UNCERTAINTIES FOR NON RPS/ESFAS PARAMETERS AND FOR EOPS INFORMATION SHARING TECHNICAL SPECIFICATION IMPROVEMENTS OR CHANGES TO ENHANCE

=

USEFULNESS TO OPERATORS:

FLCEA LCOS HIGH STARTUP TRIP 50.59 METHODOLOGY CHANGES RSTS IMPLEMENTATION i

i GOONRCCHP MISC 0t8

OPERATIONS SUBCOMMITTEE gg STEVE BRINKMAN (NU), CHAIRMAN BRUCE MONTGOMERY (BG&E), PRESENTER O

- OVERVIEW --

CEOG/NRC INTERACTION NONE OTHER ACTIVITIES O

e EPG MAINTENANCE LOWER MODE FUNCTIONAL RECOVERY GUIDELINES CIDONRCCHP MISC 018

4 OPERATIONS SUBCOMMITTEE,g OTHER ACTIVITIES MAINTENANCE OF EMERGENCY PROCEDURE GUIDELINES REVIEW INPUT FROM UTILITY EOP DEVELOPMENTS, AUDITS, SOERs, ETC.

DETERMINE IF EPG CHANGES ARE NECESSARY PROVIDES A MECHANISM FOR IMPROVEMENTS TO THE EPGs g

4 b

4 4

GOONRCCHP MISC 018

t i

OPERATIONS SUBCOMMITTEE g i

1I t

i OTHER ACTIVITIES _(cont.)

g

.i DEVELOPMENT OF LOWER MODE FUNCTIONAL RECOVERY.

l GUIDELINES i

EFFORTS DEVELOPED A TECHNICAL BASES AND STRATEGIES i

DOCUMENT FOR SAFETY FUNCTION GUIDELINES IN THE LOWER MODES 1

l TASK DEVELOPED ADDITIONAL BASES FOR:

NATURAL CIRCULATION.

j

- COMBUSTIBLE GAS CONTROL -

- RCP OPERATION STRATEGIES

}

EFFORTS ALSO INCLUDED SIMULhTOR VALIDATIONS OF FRGs i

i-i EFFORTS ARE NEARING COMPLETION WHICH WILL RESULT IN I

FUNCTIONAL RECOVERY GUIDELINES i.

GOONRCCHP MISC. 018

o OPERATIONS SUBCOMMITTEE g INFORMATION SHARING O

OUTAGE RISK MANAGEMENT MEMBERS DISCUSS INDUSTRY GUIDANCE AND METHODS EMPLOYED AT THEIR PLANT (S) TO REDUCE OUTAGE RISK INCLUDING:

PERFORMANCE OF OUTAGE PRAs, SHUTDOWN COOLING RISK ASSESSMENTS, SHUTDOWN COOLING ADMINISTRATIVE CONTROLS, ETC.

OPERATIONAL EXPERIENCE REVIEW 9

AT EACH MEETING, MEMBERS REVIEW SCRAM EXPERIENCE, ESF ACTUATIONS, NEAR MISSES, ROOT CAUSES, CORRECTIVE ACTIONS, AND TRENDS CEOG PROGRAMS INITIATED IF APPROPRIATE 1

CEOGNRCCHP MISC. 018

t MATERIALS & CHEMISTRY,g SUBCOMMITTEE SCOTT BOGGS (FPL), CHAIRMAN DON WRIGHT (BG&E), PRESENTER O

- OVERVIEW -

CEOG/NRC INTERACTION REACTOR PRESSURE VESSEL EMBRITTLEMENT PROGRAM TOPICAL REPORT: CEN-405-P OTHER ACTIVITIES g'

DEVELOPMENT OF ALTERNATE STEAM GENERATOR TUBE l

l PLUGGING CRITERIA i

i I

MATERIALS & CHEMISTRY g SUBCOMMITTEE REACTOR PRESSURE VESSEL EMBRITTLEMENT PROGRAM NRC CONTACT: S. SHENG g

ISSUE DEMONSTRATING ACCEPTABLE MARGIN FOR REACTOR VESSEL TOUGHNESS P-T CURVE OPERATING WINDOW IS RESTRICTED DESPITE SOME RELIEF FROM ASME LTOP EFFORT IN THE LONGER TERM, NEED TO MAINTAIN OPERATING FLEXIBILITY l

NEED TO DEMONSTRATE ACCEPTABLE MARGIN FOR PTS SCREENING CRITERIA i

4 GOONRCCHP MISC 018

4 l

MATERIALS & CHEMISTRY,g SUBCOMMITTEE J

REACTOR PRESSURE VESSEL EMBRITTLEMENT PROGRAM (cont.)

NRC CONTACT: S. SHENG O

4 ISSUE (cont.)

CEOG METHODOLOGY JUSTIFIES TWO ALTERNATIVE APPROACMES l

INTEGRATED SURVEILLANCE 1

- ADJUSTING CHEMISTRY FACTOR AND MARGIN USING DATA FROM A " HOST" C-E MANUFACTURED VESSEL CONTAINING CONTROLLING MATERIAL FROM THE SUBJECT VESSEL i

MARGIN REDUCTION

- ADJUSTING MARGIN USING CREDIBLE PLANT SPECIFIC DATA -

l

. croonecu mse m i

1 MATERIALS & CHKMISTRY g i

SUBCOMMITTEE l

REACTOR PRESSURE VESSEL EMBRITTLEMENT PROGRAM O

CEOG/NRC INTERACTIONS CEN-405-P REVISION 1-P, SUBMITTED TO THE STAFF DECEMBER 6, 1991 STAFF RAI ISSUED TO CEOG JANUARY 29,1992 STATUS RESPONSES WILL BE PROVIDED TO STAFF WITH REVISION 2-P OF CEN-405 IN APRIL 1993 s

REQUESTED NRC ACTION APPROVAL OF CEN-405-P REVISION 2-P FOLLOWING RECEIPT OF REPORT AND RAI RESPONSES GOONRCCHP MISC 018

i MATERIALS & CHEMISTRY,g SUBCOMMITTEE OTHER ACTIVITIES O

DEVELOPMENT OF ALTERNATE S/G TUBE PLUGGING CRITERIA PROGRAM WILL EVALUATE S/G TUBE DEGRADATION IN LIGHT OF ECT RESULTS GOAL IS TO JUSTIFY ALTERNATE PLUGGING CRITERIA ADDRESSES AXIAL INDICATIONS AT EGG-CRATE SUPPORTS DOES NOT DUPLICATE EPRIEFFORTS INFORMATION SHARING G

ALTERNATIVES TO ALL VOLATILE CHEMISTRY CONTROL S/G CREVICE CHEMISTRY STEAM GENERATOR LIFE CYCLE MANAGEMENT QC3NRCCHP MISC 013

?

RELIABILITY AND g

AVAILABILITY SUBCOMMITTEE LINDY BRAMLETT (ENTERGY OPERATIONS - ANO),

CHAIRMAN O

RALPH PHELPS (OPPD) - PRESENTER

- OVERVIEW --

CEOG/NRC INTERACTION 1

4 RELAXATION OF REACTOR COOLANT PUMP CASING INSPECTION REQUIREMENTS g

i i

MODIFICATION OF POST ACCIDENT SAMPLING SYSTEM l

REQUIREMENTS i

GOONRCOiF MISC olt i

i RELIABILITY AND g

AVAILABILITY SUBCOMMITTEE e

OTHER ACTIVITIES RELAXATION OF RESPONSE TIME TESTING REQUIREMENTS FOR CERTAIN PRESSURE AND A PRESSURE TRANSMITTERS CHARGING PUMP PACKING AND PLUNGER OPTIMIZATION PROGRAM O

FORMATION OFI&C WORKING GROUP l

I e

j GOGNRCCHP MISC 015 i

1 RELIABILITY AND g

AVAILABILITY SUBCOMMITTEE RELAXATION OF REACTOR COOLANT PUMP CASING INSPECTION REQUIREMENTS O

i ISSUE l'

CEOG REPORT CEN--412 PROVIDES THE ANALYTICAL EVALUATIONS REQUIRED BY ASNE CODE CASE N-481 FOR ALTERNATE RCP CASING EXAMINATION PROCEDURES O

CEOG/NRC INTERACTIONS CEN-412 HAD BEEN SUBMITTED FOR STAFF REVEW NOVEMBER 27, 1991 j

CEOGNRCCHF MISC 018

i RELIABILITY AND g

AVAILABILITY SUBCOMMITTEE RELAXATION OF REACTOR COOLANT PUMP CASING INSPECTION REQUIREMENTS (cont.)

e STATUS NRC INFORMED CEOG THAT CEN-412 WOULD NOT BE REVIEWED, BUT THAT PLANTS COULD IMPLEMENT RESULTS BY INFORMING STAFF AND HAVING ANALYSES AVAILABLE FOR REVIEW SEVERAL PLANTS ARE EXPECTED TO IMPLEMENT THE RESULTS IN O

THE NEAR FUTURE 4

REQUESTED NRC ACTION NONE i

CEOGNRCCHP MISC. 0t t

RELIABILITY AND g

AVAILABILITY SUBCOMMITTEE MODIFICATION OF POST ACCIDENT SAMPLING SYSTEM REQUIREMENTS g

NRC CONTACT: K. PARCZEWSKI ISSUE-CEN-415 REVISION 1, PROVIDES JUSTIFICATION FOR ELIMINATION /

MODIFICATION OF SEVERAL PASS REQUIREMENTS O

CEOG/NRC INTERACTION CEN-415 WAS SUBMITTED FOR STAFF REVIEW DECEMBER 15,1991 CEOGNRCCHP MISC _018

5 RELIABILITY AND g

AVAILABILITY SUBCOMMITTEE 9

STATUS O

STAFF REVIEW ORIGINALLY SCHEDULED TO BE COMPLETED LAST SUMMER DISCUSSIONS IN SEPTEMBER WITH K. PARCZEWSKI AND J. STROSNIDER INDICATED THAT REVIEW WOULD BE DELAYED UNTIL PLANTS INFORMED NRC OF THEIR DESIRE TO IMPLEMENT RESULTS OF CEN-415 1

SOME PLANTS HAVE SINCE ISSUED LETTERS TO STAFF INDICATING INTENT TO IMPLEMENT RESULTS WHEN SER ISSUED i

NRC RAI EXPECTED SUMMER 1993 REQUESTED NRC ACTION 1

CONFIRMATION OF RAI AND REVIEW SCHEDULES CECDNRCCHF MISC.018

.m 0

RELIABILITY AND

,g AVAILABILITY SUBCOMMITTEE OTHER ACTIVITIES PROGRAM TO ELIMINATE TIME RESPONSE TESTING REQUIREMENTS FOR CERTAIN PRESSURE AND A PRESSURE TRANSMITTERS AWAITING OUTCOME OF BWROG/NRC INTERACTION CHARGING PUMP PACKING AND PLUNGER OPTIMIZATION PROGRAM O,

IN PLANT TESTING OF VARIOUS COMBINATIONS OF PACKING MATERIAL AND PLUNGER COATINGS TO D151 ERMINE OPTIMAL COMBINATION 4

CEOONRCCHP MISC.018 4

4

i RELIABILITY AND g

AVAILABILITY SUBCOMMITTEE e

INFORMATION SHARING DISCUSSING MAINTENANCE RULE ISSUES EVALUATING WAYS CEOG CAN HELP MEMBERS IN IMPLEMENTATION DISCUSSING INDUSTRY MOV ISSUES O

EXAMINING WAYS TO REDUCE OUTAGE EXPOSURE AND DURATION CEOONRCCHP MISC.018

.0 i

INSTRUMENTATION AND

,g CONTROLS WORKING GROUP TIBBS GOLLADAY (ENTERGY OPERATIONS - WSES),

CHAIRMAN O

RALPH PHELPS (OPPD) - PRESENTER WORKING GROUP FORMED IN JANUARY 1993 MISSION IS TO PROVIDE A FOPUM FOR THE IDENTIFICATION AND RESOLUTION OF GENERIC INSTRUMENTATION AND CONTROLS ISSUES FOR CEOG PLANTS O'

THE I&C WORKING GROUP REPORTS TO THE RELIABILITY AND AVAILABILITY SUBCOMMITTEE GOONRCCHP MISC 018

INSTRUMENTATION AND

,g CONTROLS WORKING GROUP e

WORKING GROUP MAY ADDRESS I&C SYSTEMS OBSOLESCENCE I&C SYSTEMS OPERATIONAL ISSUES.

I&C SYSTEMS PERFORMANCE ENHANCEMENTS OTHER I&C ISSUES OF IMPORTANCE TO CEOG PLANTS CEOGNRCCHP MISC 018

  • e

[

ALLOY 600 WORKING GROUP,g MIKE MELTON (APS) CHAIRMAN

- OVERVIEW -

g 1

CEOG/NRC INTERACTION I

PWSCC OF ALLOY 600 CEDM PENETRATIONS

)

O 4

CEOONRCCHP MISC 018

I ALLOY 600 WORKING GROUP g PWSCC OF ALLOY 600 CEDM PENETRATIONS NRC CONTACT: BOB HERMANN O

ISSUE CRACKING OF ALLOY 600 CRDM PENETRATIONS IN EUROPE CEOG HAS BEEN WORKING WITH NUMARC AHAC TO ADDRESS SAFETY SIGNIFICANCE FOR U.S. PLANTS CEOG IS PREPARING A SAFETY EVALUATION, TO BE PROVIDED TO NUMARC, WHICH CHARACTERIZES THE ISSUE FOR CEOG PLANTS i

CEOG SUPPORTS INDUSTRY POSITION THAT PWSCC OF CEDM NOZZLE PENETRATIONS IS NOT AN IMMEDIATE SAFETY ISSUE i

CEDONRCCHP MISC 018

ALLOY 600 WORKING GROUP g ISSUE (cont) g CEOG 3D STRESS ANALYSES HAS CONFIRMED THAT:

HOOP STRESSES IN PENETRATIONS EXCEED AXIAL STRESSES ID NOZZLE CRACKS WILL BE AXIALLY ORIENTED PEAK HOOP STRESSES FOR CEOG GEOMETRIES ARE LOWER THAN THOSE CALCULATED FOR BUGEY O

CEOG PLANTS HAVE LESS WELD VOLUME, BELIEVE THAT THIS MAY CONTRIBUTE TO A LONGER TIME TO CRACK INITIATION 4

RESULTS OBTAINED TO DATE DO NOT SUPPORT CATASTROPHIC I

FAILURES a

GOGNRCCHP MISC 0t 8

E ALLOY 600 WORKING GROUP g ISSUE (cont)

O FULL CHARACTERIZATION OF NOZ7LE MATERIAL AVAILABLE FOR CEOG PLANTS DIMENSIONS OF CEOG HEAD PENETRATIONS DIFFERENT FROM OTHER DESIGNS CEOG EVALUATING IMPLICATIONS OF BUGEY O.D.

- CIRCUMFERENTIAL CRACKING g

THERE IS REASONABLE ASSURANCE THAT IE CRACKS DEVELOP AND PROGRESS THROUGH WALL, LEAKAGE WILL BE DETECTED BEFORE CHALLENGING CODE LIMITS ON THE VESSEL HEAD i

GOONRCCHP MISC Ott

6 ALLOY 600 WORKING GROUP g ISSUE (cont) g CEOG SUPPORTING INDUSTRY NDE QUALIFICATION AND DEVELOPMENT OF FLAW ACCEPTANCE CRITERIA CEOG AGGRESSIVELY WORKING TO ADDRESS INSPECTION GUIDELINES AND MITIGATION AND REPAIR TECHNICAL ISSUES INSPECTION GUIDELINES TO BE BASED ON CEOG SUSCEPTIBILITY O

MODEL GOONRCCHP MISC 018

f, ALLOY 600 WORKING GROUP,g O

CEOG/NRC INTERACTION SUPPORTED NOVEMBER 1992 AND MARCH 1993 MEETINGS WITH STAFF AND NUMARC CEOG WILL CONTINUALLY EVALUATE FINDINGS AND PRC7 'S WITH RESPECT TO INSPECTION, MITIGATION AND REPAIR ISSUES CEOG WILL UPDATE NRC ON THESE ISSUES AT NRC's REQUEST i

GOGNRCCHP MISC 018

ALLOY 600 WORKING GROUP g 9

REQUESTED NRC ACTION CONTINUE TO ALLOW PWR OWNERS GROUPS, THROUGH NUMARC AHAC, TO FULLY EVALUATE ALL ASPECTS OF THIS ISSUE AND t

PRESENT FINDINGS TO NRC INFORMATION SHARING CNGOING WITH ALL PWR OWNERS GROUPS, EPRI, EUROPEAN UTILITIES, AND EUROPEAN VENDORS i

NUMARC AHAC SERVING AS LIAISON WITH NRC 4

4 5

CE00NRCCHP MISC Ot3

PRIORITY OF CEOG TOPICAL REPORTS UNDER NRC REVIEW b

REPORT NO.. SUBJECT UPDATED PRIORITY COMMENTS h

CEN-152 Rev. 3, EOP Guidelines LOW Awaiting SER CEN-381-P, Low Temperature LOW (A)

CEOG has commented on ASME Overpressurization Transient Pressure Code Case and recommended Temperature Limit for Determination of application of code case to receive Low Temperature Overpressure interim relief from operating window Protection Setpoints problems. CEOG to pursue review of Topical Report on a longer term basis as a long term solution.

CEN-387-P Rev.1 Revised LOW NRC review almost complete.

Pressurizer Surge Line Thermal Awaiting SER.

Stratification Analysis CEN-403, ESFAS Subgroup Testing.

HIGH NRC RAI received 7/7/92. Revised h

Relaxation Topical to be submitted Summer 93.

CEN-404, Leak-Before-Break HIGH CEOG members have submitted Methodoiogy to Main Steam Line Piping letters indicating their intent to use this l

methodology.

l KEY:

A - changed priority 1 -increased priority 1 - reduced priority V

E i

CEOONRCCHP MISC 018

PRIORITY OF CEOG TOPICAL REPORTS UNDER r

0 NRC REVIEW REPORT NO.. SUBJECT UPDATED PRIORITY COMMENTS CEN-405-P, Reactor Vessel Integrated HIGH CEOG to respond to RAIin Spring Surveillance Program 1993 NRC review should continue to have high priority.

CEN-412. Reactor Coolant Casing N/A(A)

NRC has endorsed applicable ASME Inspection Relaxation Ccde Pump Case. No further NRC review required.

I CEN-415, Modified Post-Accident HIGH NRC review to be completed by the Monitoring Requirements Summer of 1993. A CEOG meinber has refenced this report and requested that the NRC complete its review by July 1993 so that they can -

implement the recommendations by h

1994.

CEN-420-P, Small Break LOCA HIGH CEOG member utility has issued letter Realistic Evaluation Model documenting their need of REM KEY:

A - changed priority 1 -increased priority 1 - reduced priority i

GOONRCCHP MISC. 018

O b

cac1osure 3 e

Attendance CE0G - NRC Meeting April 8, 1993 Name Oraanization Joss A. Calvo NRC/NRR/DRPE Ashok Thadani NRC/NRR/DSSA Tom Murley NRC/NRR Jim Partlow NRC/NRR/ADP W. F..Conway Arizona Public Service B. D. Liaw NRC/NRR/DE 1

W. Jones Omaha Public Power District i

James D. Alderink CPCo-Palisades Mike Melton APS Don Wright BG&E J. Holman Entergy John J. Hutchinson FPL

)

Robert Hermann NRC/NRR/DE/EMCB 1

Keith Wichman NRC/NRR/DE/EMCB j

Robert Jones NRC/NRR/DSSA/SRXB Jared Wermiel NRC/NRR/DRCH/HICB Terence L. Chan NRC/NRR/DE/EMEB M. Boyle NRC/NRR/DRPE Tim Matthews NUMARC John McGaha Entergy Operations Inc.

W. A. Goodwin ABB-CE R. L. Phelps OPPD Philip Richardson ABB-CE Bruce Montgomery Baltimore Gas & Electric Harold B. Ray SCE Charles Frizzle Maine Yankee-George C. Creel BG&E Eric A. DeBarba Northeast Utilities W. S. Skibitsky ABB-CE l

K. 1. Parczewski NRC/NRR/DE/EMCB Paul Hijeck ABB-CE Gordon Bischoff ABB-CE D. A. Sager FPL i

, ** 'O CE TOPICAL REPORT REVIEW STATUS Report No.

Sub.iect Review by Status / Priority CEN-152 Rev. 3 E0P Guidelines SRXB NRC reviewing, determining applicability of Palo Verde event to generic CE E0Ps.

Priority LOW CEN-381-P Rev. 1 LTOP P/T Limits Setpoints EMCB NRC has made a preliminary review and will identify problem areas to CEOG.

Applicable ASME code case due out in May 1993.

Priority LOW.

CEN-387-P Rev. 1 Surge Line Thermal Fatigue EMEB TER due from NRC contractor in mid-April 1993.

SER will be issued soon afterward.

Priority LOW k!h CEN-403 ESFAS Relay Test Interval HICB NRC issued RAI in July 1992. CE0G response due to NRC by summer 1993.

Priority HIGH E'

n CEN-404 MSL Leak Before Break EMCB NRC has made a preliminary review E'

and will identify problem areas to E

CEOG.

NRC doubtful of applicability 2

of method.

Priority HIGH

CE TOPICAL REPORT REVIEW STATUS Report No.

Sub.iect Review by Status / Priority CEN-405-P RX Pressure Vessel Embrittlement EMCB Under NRC review. CEOG to reply to RAI in Spring '93.

Priority HIGH CEN-412 RCP Casing ISI Requirements EMCB ASME code case has been approved.

g No action by NRC on this topical is now needed.

Priority NA CEN-415 PASS Requirements EMCB Under NRC review, SER in preparation, to be issued soon.

Priority HIGH CEN-420-P Small Break LOCA model SRXB NRC review will start in FY '94 and a

review will take about 2 years.

W Priority HIGH CEN-604 Reactor Vessel Materials EMCB CEOG has submitted a draft report in response to GL 92-01, will submit final report by summer 1993.

Priority HIGH

,w..

CE TOPICAL REPORT REVIEW STATUS Report No.

Subiect Review by Status / Priority Other C

.tivities:

NUREG s32 Restructured STS OTSB CEOG is working on the issue with San Onofre as the lead plant.

Submitted comments on NUREG to NRC.

O Alloy 600 PWSCC of CEDM Penetrations EMCB CEOG, as well as NRC, is still looking into issue as well as possible resolutions. Will supply further information to NRC as it becomes available.

APC/IPC Alternate Plugging Criteria EMCB CEOG is developing an APC for its plants that will be complimentary to that of EPRI. Will keep NRC informed of progress.

g

-.-