Forwards Vogtle Electric Generating Plant,Unit 1,Cycle 5 Startup Test Rept. Rept Includes Core Loading Map & Summaries of Listed Test Activities
ML20045H979
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/16/1993
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045H980 List:
References
LCV-0074, LCV-74, NUDOCS 9307220215
Download: ML20045H979 (2)


Text

,-

Georg;a Po.ver Company

( . . 40 lovernet.s Cemer Pa+way Post Owe Box 1295

. Bmungnam. A6bama 35201

. T Mephone 205 877-7122 1.

c. x. uccoy Georgia Power v,ce prevoem Nuow e

von co,ect July 16, 1993 tre sou run eac"c rystem LCV-0074 Docket Nos. 50-424 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen VOGTLE ELECTRIC GENERATING PLANT UNIT 1. CYCLE 5. STARTUP TEST REPORT Enclosed for your information is the Startup Test Report summarizing the results of some of the tests performed following core refueling for Unit 1, Cycle 5. The enclosed report includes a core loading map and summaries of the following test activities:

- Control rod drop time measurement Initial criticality

- All-Rods-Out isothermal temperature coeflicient and boron endpoint measurement Control and sliutdown bank worth measurement

- Startup and power ascension

- Reactor coolant system flow measurement Sincerely, C. K. McCoy CKM/InVM/gmb

Enclosure:

Startup Test Report xc: (See next page) 200115 fjfSI m I '

gRO72?O215 930726 p ADOCK 05000424 Ll PDR V a

4 4

9 Georgia Power A U. S. Nuclear Regulatory Commission LCV-0074 Page 2 xc: Georgia Power Company i Mr. J. B. Beasley Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 700775