Text
..
Cr ot,
UNITED STATES
ft
$$
NUCLEAR REGULATORY COMMISSION
[
.kj.
,
REGION IV
o
611 RYAN PLAZA DRIVE. Sulf E 400
Y,
JUL I 41993
Docket:
STN 50-482
License: NPF-42
Wolf Creek Nuclear Operating Corporation
ATTN:
Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
SUBJECT:
NRC INSPECTION REPORT 50-482/93-14 (NOTICE OF VIOLATION)
This letter refers to the inspection conducted by Mr. G. A. Pick and the
inspectors identified in the attached report for the period of May 9 through
June 19, 1993.
The inspection included a review of activities authorized for
. your Wolf Creek Generating Station. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violation includes two examples of inadequate.
,
transfer of Cycle 7 specific design information into the appropriate documents
and computer data bases.
The first example is of concern because it resulted
)
in violating a Technical Specifications surveillance requirement when
personnel failed to enter the appropriate axial flux difference limits into
the computer.
The second example cited could have resulted in a
nonconservative shutdown margin calculation because the table personnel
referenced was based on a higher rated thermal power than the current
100 percent rated thermal power. Due to inadequate communications, personnel
responsible for the implementing procedure were unaware that the core design
report tables prior to 200 effective full power days were based on a higher
rated thermal power.
Wolf Creek Nuclear Operating Corporation personnel discovered a mispositioned
valve that rendered one of two hydrogen analyzer trains inoperable.
Review by
licensee personnel identified no definite root cause; however, site personnel
promptly implemented corrective actions to prevent recurrence.
This violation
of Technical Specification 6.8.1.a will not be cited because the criteria
identified in paragraph Vll.B.2 of 10 CFR Part 2, Appendix C (Enforcement
.
Policy), were satisfied.
9307210025 930714
ADOCK 0500
2
O
l'
b
_
.
_. _
.
.
>
Wolf Creek Nuclear Operating
-2-
i
Corporation
You are required to respond to this letter and should follow the instructions
'
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
)
Notice, including your proposed corrective actions and the results of future
inspections, NRC will determine whether further NRC enforcement action is
!
necessary to ensure compliance with NRC regulatory requirements.
It is our understanding that you committed to perform reactor coolant system
thermal expansion monitoring during the next outage .that requires heatup from
,
cold shutdown conditions.
f~
a, we understand that the reactor coolant pump
tie rods will be adjusted prior to startup from Refuel VII.
If your
' '
understanding of these commitments differs, please contact me promptly.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
.L
this letter and its enclosures will be placed in the NRC Public Document Room.
The response directed by this letter and the enclosed Notice is not subject to
i
the clearance procedures of the Office of Management and Budget as required by
-
the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
'
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
-
'
Sincerely,
" '
,
A. Bill B ch, Director
Division of Reactor Projects
,
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-482/93-14 w/ attachments
cc w/ enclosures:
Wolf Creek Nuclear Operating Corp.
ATTN: Otto Maynard, Vice President
Plant Operations
P.O. Box 411
Burlington, Kansas 66839
Shaw, Pittman, Potts & Trowbridge
ATTN: Jay Silberg, Esq.
2300 N Street, NW
Washington, D.C.
20037
i
+
,-
.,
.
.
. - . - -
-
y
~
~
~' 7
-
,
i
.;,
Wolf Creek ~ Nuclear Operating
-3-
Corporation
'
l
Public Service Commission
l
ATTN:
C. John Renken
.l
Policy & Federal Department
P.O. Box 360~
!
Jefferson City, Missouri
65102
q
U.S. Nuclear Regulatory Commission
ATTN:
Regional Administrator, Region III
.
799 Roosevelt Road
Glen Ellyn, Illinois 60137
l
Wolf Creek Nuclear Operating Corp.
ATTN:
Kevin J. Moles
Manager Regulatory Services
P.O. Box 411
i
Burlington, Kansas 66839
Kansas Corporation Commission
ATTN:
Robert Elliot, Chief Engineer
Utilities Division
1500 SW Arrowhead Rd.
Topeka, Kansas 66604-4027
!
Office of the Governor
-
>
State of Kansas
i
'
Topeka, Kansas 66612
,
Attorney General
1st Floor - The Statehouse
.;
'
Topeka, Kansas 66612
Chairman, Coffey County Commission
Coffey County Courthouse
Burlington, Kansas 66839-1798
Kansas Department of Health
j
and En~vironment
Bureau of Air Quality & Radiation
l
Control
ATTN:
Gerald Allen, Public
!
Health Physicist
'
Division of Environment
1
Forbes Field Building 321
Topeka, Kansas 66620
.
i
-l
. - . .
~.
-
.
.
.
.
.-
-
-
-
- .,
4
i
Wolf _ Creek Nuclear Operating
-4-
.
i
- Corporation
Kansas Department of Health and Environment
ATTN:
Robert Eye, General Counsel
LS0B, 9th Floor
'
900 SW Jackson
.
>
Topeka, Kansas 66612
3
.
I
?
',
t
6
-i
e
6
!
E
a
P
,
!
,
e
,
.
- - .
- . -
. - . -
. . . -
. . . ,
.-
L,i
l
1
M IdIN
Wolf Creek Nuclear Operating
-5-
Corporation
bcc to DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/'\\)
DRSS-FIPS
Section Chief, Rill (DRP/3C)
RIV File
SRI, Cailaway, Rill
MIS System
Lisa Shea, RM/ALF, MS: MNBB 4503
Project Engineer (DRP/A)
Chief, Technical Support Section
G. A. Pick, SRI
D. L. Kelley
T. O. McKernon
A. B Beach
J. F. Ringwald
AQJ
_
n
'
RIV: SRI:DRP/A
RE:DRS/ M A,,PE:DRPfd
C:DRS/0Sk C:DRP/A h D:DRhhh
GAPick k d
TOMcKerndn MASatorius
JLPellet
WDJohnson
ABBeac
'
7 /
/93
7//L/93
1 / @/93
l/b/93
iO
6/24/93
j //p/93
i
i
200004
l
k..
D
- -
,
'
Wolf Creek Nuclear Operating
-5-
R 1 4 1993
Corporation
bcc to DMB (IE01)
'
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/A)
DRSS-FIPS
Section Chief, RIII (DRP/3C)
RIV File
SRI, Callaway, RIII
MIS System
Lisa Shea, RM/ALF, MS: MNBB 4503
Project Engineer (DRP/A)
Chief, Technical Support Section
G. A. Pick, SRI
D. L. Kelley
T. O. McKernon
A. B. Beach
J. F. Ringwald
1
.
t
l
i
i
M > _Y
n
-3
.
RIV: SRI:DRP/A
RE:DRS/ @ A,PE:DRPfd
C:DRS/0Sk_C:DRP/Ah D:DR6kYk
GAPick
TOMcKerndn MASatorius
JLPellet
WDJohnson
ABBeachh
'
6/24/93
]//p/93
7/jd/93
7//2/93
1 /\\}/93
1/b/93
,
i