Amend 82 to License NPF-30,revising TS Section 3/4.9.12, Figure 3.9-12 to Reflect Min Initial Enrichment of 4.45 W/O U-235 for Fuel Storage in Region 2 of Plant Spent Fuel Pool
ML20045H554
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/07/1993
From: Wharton L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20045H555 List:
References
NUDOCS 9307200374
Download: ML20045H554 (4)


Text

e nuou 4

UNITED STATES g4-

%f j

NUCLEAR REGULATORY COMMISSION J

j{Q

  • g j

WASHINGTON, D.C. 20f/A0001 g-f 1

UNION ELECTRIC COMPANY

[ALLAWAY PLANT. UNIT 1 DOCKET NO. 50-483 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.82 License No. NPF-30 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment filed by Union Electric. Company (UE, the licensee) dated June 12, 1992, as clarified by letter dated August 31, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment.is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-30 is hereby amended to read as follows:

9307200374 930707 DR ADOCK 0500 3

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 82, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the license.

UE shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance, and is to be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION a

L. Raynard Wharton, Project Manager Project Directorate III-3 Division of-Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance:

July 7, 1993

i i

ATTACHMENT TO LICENSE AMENDMENT N0. 82 i

OPERATING LICENSE NO. NPF-1Q l

DOCKET NO. 50-483 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page is identified by.the J

captioned amendment number. Corresponding overleaf page is provided to maintain document completeness.

REMOV1 INSERT 3/4 9-16 3/4 9-16 t

f 5

FIGURE 3,9.

MINIMUM REQUIRED FUEL ASSEMBLY.BURNUP AS A FUNCTION OF INITIAL ENRICHMENT TO PERMIT STORAGE IN REG 10N2 45000-40000-ABOVE THE CURVE IS ACCEPTABLE OfA/V-5 TUEL 2No.

3 330000-Eo vi k

y25000-W G

b l/

D 20000-

/

~h STANDARD FUEL U

U m

315000-h

/

/

ci 010000-BELOW THE CURVE IS NOT ACCEPTABLE 5000-t 0-1.5 2,0 2.5 3.0 3.5 4.- 0 4.5

5. 0 FUEL' ASSEMBLY INITIAL ENRICHMENT, W/0 U-235 t

'CALLAWAY - UNIT 1 3/4 9-16 Amendment No. J2,23,82