Forwards Enforcement Conference Insp Rept 50-219/93-07 on 930517-18
ML20045H448
Person / Time
Site: Oyster Creek
Issue date: 07/09/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20045H449 List:
References
NUDOCS 9307200226
Download: ML20045H448 (4)


See also: IR 05000219/1993007

Text

.

-.-

DC ")

'

l

'

Q UL 0 9 1993

Docket No. 50-219

Mr. John J. Barton

Vice President and Director

.

GPU Nuclear Corporation

,

Oyster Creek Nuclear Generating Station

'

P.O. Box 388

Forked River, New Jersey 08731

Dear Mr. Barton:

Subject:

Meeting Report No. 50-219/93-07 (Enforcement Conference)

This letter refers to the special reactive safety inspection conducted by Mr. J. Furia and Dr.

W. Pasciak of this office on May 17-18, 1993, and to the subsequent Enforcement

Conference held at the NRC Region I office, King of Prussia, Pennsylvania, on June 24,

1993. The inspection was conducted to examine the events which occurred on May 7 and 11

in the Fill Aisle of the New Radwaste Building. The inspection report for the May 17-18

inspection was transmitted to you by letter dated May 31,1993. Five apparent violations

were identified in the inspection report.

l

The enforcement conference was held as a result of the findings of the inspection and was

attended by you and members of your staff. The following matters wue discussed during

the enforcement conference: the events and their safety significance, and the facts associated

with the events; the appropriateness of the apparent violations relative to criteria outlined in

the NRC's Enforcement Policy (10 CFR Part 2, Appendix C); the possible basis for

exercising discretion in accordance with Section VII of the Enforcement Policy; your short

and long-term corrective actions; and factors that NRC considers when it determines the

amount of a civil penalty that may be assessed in accordance with Section VI.B.2 of the

'

Enforcement Policy. In addition, a summary of your root cause analysis of the event was

discussed. The conference was open to the public and members of the public were in

attendance.

The enclosed Enforcement Conference Report provides additional details regarding the above

matters and related topics discussed at this conference.

No reply to this letter is required. You will be notified of our evaluation of appropriate

enforcement action at a later date.

9307200226 930709

1\\

gDR

ADOCK 0500

9.

OFFICIAL RECORD COPY

., 7 ,.

g jj.,

&%

~

dL

klO

.

..

.-

..

JUL 0 g ygg

GPU Nuclear Corporation

.2

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By;

James H. Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards

Division of Radiation Safety

and Safeguards

Enclosure:

l

Enforcement Conference Report 50-219/93-07 with Attachments

cc w/ encl:

M. Laggart, Manager, Corporate Licensing

P. Czaya, Acting Licensing Manager, Oyster Creek

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

State of New Jersey

l

l

!

.

.

.

.

GPU Nuclear Corporation

3

Jill g g 7pg

bec w/ encl:

Region I Docket Room (with concurrences)

bec w/enci (VIA E-MAIL):

J. Joyner, DRSS

R. Blough, DRP

J. Rogge, DRP

J. Lieberman, OE

D. IIolody, RI

J. Goldberg, OGC

V. McCree, OEDO

J. Stolz, NRR/PD 1-4

A. Dromerick, NRR/PD l-4

4

,.

.

.

,

>

GPU Nuclear Corporation

4

JUL .g g gg .

l

.i

CONCUR

i:

oals:m

nass:m

onss:m

o

s

T' ki

T3

s,

. ..

1/6/93

ll /93

f/4 /93

Af

3

'l

'

7

'

OFFICIAL RECORD COPY