ML20045H448
| ML20045H448 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 07/09/1993 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | J. J. Barton GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20045H449 | List: |
| References | |
| NUDOCS 9307200226 | |
| Download: ML20045H448 (4) | |
See also: IR 05000219/1993007
Text
.
-.-
DC ")
'
l
'
Q UL 0 9 1993
Docket No. 50-219
Mr. John J. Barton
Vice President and Director
.
GPU Nuclear Corporation
,
Oyster Creek Nuclear Generating Station
'
P.O. Box 388
Forked River, New Jersey 08731
Dear Mr. Barton:
Subject:
Meeting Report No. 50-219/93-07 (Enforcement Conference)
This letter refers to the special reactive safety inspection conducted by Mr. J. Furia and Dr.
W. Pasciak of this office on May 17-18, 1993, and to the subsequent Enforcement
Conference held at the NRC Region I office, King of Prussia, Pennsylvania, on June 24,
1993. The inspection was conducted to examine the events which occurred on May 7 and 11
in the Fill Aisle of the New Radwaste Building. The inspection report for the May 17-18
inspection was transmitted to you by letter dated May 31,1993. Five apparent violations
were identified in the inspection report.
l
The enforcement conference was held as a result of the findings of the inspection and was
attended by you and members of your staff. The following matters wue discussed during
the enforcement conference: the events and their safety significance, and the facts associated
with the events; the appropriateness of the apparent violations relative to criteria outlined in
the NRC's Enforcement Policy (10 CFR Part 2, Appendix C); the possible basis for
exercising discretion in accordance with Section VII of the Enforcement Policy; your short
and long-term corrective actions; and factors that NRC considers when it determines the
amount of a civil penalty that may be assessed in accordance with Section VI.B.2 of the
'
Enforcement Policy. In addition, a summary of your root cause analysis of the event was
discussed. The conference was open to the public and members of the public were in
attendance.
The enclosed Enforcement Conference Report provides additional details regarding the above
matters and related topics discussed at this conference.
No reply to this letter is required. You will be notified of our evaluation of appropriate
enforcement action at a later date.
9307200226 930709
1\\
gDR
ADOCK 0500
9.
OFFICIAL RECORD COPY
., 7 ,.
g jj.,
&%
~
dL
klO
.
..
.-
..
JUL 0 g ygg
GPU Nuclear Corporation
.2
Your cooperation with us in this matter is appreciated.
Sincerely,
Original Signed By;
James H. Joyner
James H. Joyner, Chief
Facilities Radiological Safety
and Safeguards
Division of Radiation Safety
and Safeguards
Enclosure:
l
Enforcement Conference Report 50-219/93-07 with Attachments
cc w/ encl:
M. Laggart, Manager, Corporate Licensing
P. Czaya, Acting Licensing Manager, Oyster Creek
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
State of New Jersey
l
l
!
.
.
.
.
GPU Nuclear Corporation
3
Jill g g 7pg
bec w/ encl:
Region I Docket Room (with concurrences)
bec w/enci (VIA E-MAIL):
J. Joyner, DRSS
R. Blough, DRP
J. Rogge, DRP
J. Lieberman, OE
D. IIolody, RI
J. Goldberg, OGC
V. McCree, OEDO
J. Stolz, NRR/PD 1-4
A. Dromerick, NRR/PD l-4
4
,.
.
.
,
>
GPU Nuclear Corporation
4
JUL .g g gg .
l
.i
CONCUR
i:
oals:m
nass:m
onss:m
o
s
T' ki
T3
s,
. ..
1/6/93
ll /93
f/4 /93
Af
3
'l
'
7
'
OFFICIAL RECORD COPY
,l
'
..