ML20045H350
| ML20045H350 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/15/1993 |
| From: | Burski R ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20045H351 | List: |
| References | |
| W3F1-93-0162, W3F1-93-162, NUDOCS 9307200117 | |
| Download: ML20045H350 (2) | |
Text
w
,-t
\\
ENTERGY I"Me """ "'""*'
Kaana L A 70066 Tot 504 739 67/4 -
- 1
- R. F. Burski
- l nractor J
runw saw
' ##wbrd 3 W3F1-93-0162'
' A4.05 PR 3
July 15, 1993 U.S. Nuclear. Regulatory Commission
.1 ATTN: Document Control Desk
)
Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382.
i License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of June, 1993. This report is submitted.per Section 6.9.1.6 of the Waterford 3 Technical Specifications.for Facility j
Operating License No. NPF-38.
Please note that there may be a 0.01% inaccuracy in the reported Net.
1 Generation for the month of June due to a potential problem with a watt-
- hour meter.
Because the potential inaccuracy:is-very ~small 'and would have -
1 little effect on the other. reported values no change will be made'to this-report.
If a larger inaccuracy is discovered during the resolution of the problem, the Net Generation value will be updated accordingly in a future report.
Very truly yours, nut i
R.F. Burski Director j
Nuclear Safety 1
4
.I RFB/TSB/ssf
)
Attachment
[
i R.
j t-me
'-Ww-a w
%4--e r.m
---. -v e-a.
4m
Monthly Operating Report l
Page 2 July 15,1993 cc:
J.L. Hilhoan, (NRC Region IV)
D.L. Wigginton (NRC-NRR)
R.B. McGehee l
N.S. Reynolds l
F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INPO Records Center)
NRC Resident Inspectors Office i
e
)
u l
l I
l l
l l
.