| ML20045H307 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/12/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Boulette E BOSTON EDISON CO. |
| Shared Package | |
| ML20045H308 | List: |
| References | |
| NUDOCS 9307200069 | |
| Download: ML20045H307 (4) | |
See also: IR 05000293/1993008
Text
.
-
-
-
'
,
n.
US
JUL 121993
Docket No. 50-293
Dr. E. Thomas Boulette, Phd
'
Senior Vice Preside-nt (Nuclear)
Boston Edison Company
Pilgrim Nuclear Power Station
RFD No.1
Rocky Hill Road
Plymouth, Massachusetts 02360
l
'
Dear Dr. Boulette:
SUBJECT:
NRC REGION 1 INSPECTION REPORT NO. 50-293/93-08
This letter transmits the NRC Region I inspection report for the routine, announced
inspection conducted by Ms.12 anne M. Kay of this office on April 26-30,1993, at the
,
corporate office in Braintree, Massachusetts and the Pilgrim Nuclear Power Station in
'
Plymouth, Massachusetts. Ms. Kay discussed the results of this inspection with you and
other members of your staff at the conclusion of the inspection.
Our inspectors reviewed your actions to resolve six deficiencies previously identified during
NRC inspection number 50-293/91-201. Timely and effective resolution of identified
deficiencies play an important role in protecting the health and safety of the public. This
inspection included review of resolutions and corrective actions pertaining to setpoints,
drawings, procedures, instrumentation and setpoint calculations. The inspection consisted of
selected examinations of design records and procedures, interviews with personnel, and
'
observations by the inspectors.
Our inspectors concluded that the setpoint calculation program to support the twenty-four
month fuel cycle was comprehensive and adequately accounted for instrument, loop,
measuring & test equipment inaccuracies, and technical specification requirements. Within
the scope of this inspection, no safety concerns we.re identified.
,
9307200069 930712
DR
ADOCK 05000293
l
\\
%
..
.
. -
-
-
.
.
.
JUL 121993
Dr. E. Thomas Boulette, Phd
2
Your cooperation with us is appreciated.
l
Sincerely,
Jacque P. Durr, Chief
l
'
Engineering Branch
Division of Reactor Safety
Enclosure: NRC Region I Inspection Report No. 50-293/93-08.
)
l
I
OFFICIAL RECORD COPY /.:PIL9308.It15
..
.
-
-
=
-
-
JUL 121993
Dr. E. Thomas Boulette, Phd
3
cc w/ encl:
E. Kraft, Vice President, Nuclear Operations and Station Director
L. Schmeling, Plant Manager
V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department
D. Tarantino, Nuclear Information Manager
N. Desmond, Compliance Division Manager
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts
The Honorable Edward M. Kennedy
i
The Honorable John F. Kerry
The Honorable Edward J. Markey
The Honorable Terese Murray
The Honorable Peter V. Forman
B. Abbanat, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil Defense Director
Paul W. Gromer, Massachusetts Secretary of Energy Resources
Sarah Woodhouse, Legislative Assistant
A. Nogee, MASSPIRG
Regional Administrator, FEMA
Office of the Commissioner, Massachusetts Department of Environmental Quality
Engineering
Office of the Attorney General, Commonwealth of Massachusetts
T. Rapone, Massachusetts Executive Office of Public Safety
Chairman, Citizens Urging Responsible Energy
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Massachusetts, SLO Designee
i
l
0FFICIAL RECORD COPY A:PIL9308. INS
j
=
_,
,
.- -
.-
JUL 121993
Dr. E. Thomas Boulette, Phd
4
bec w/ encl:
Region I Docket Room (with concurrences)
bec w/enci (VIA E-MAIL):
W. Butler, NRR
R. Eaton, NRR
V. McCree, OEDO
RI:DRS
RI:DRS
R
Ka
uland
Durr
&y
l')
6/c /93
6/27/93
f/7/93
0FFICIAL RECORD COPY A:PIL9308. INS