i
b
$
JUL
G 1993
Docket No. 50-336
Mr. John F. Opeka
Executive Vice President - Nuclear
Northeast Nuclear Energy Company
P. O. Box 270
Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT: REQUALIFICATION PROGRAM EVALUATION REPORT NO.
50-336/93-12 (OL-RQ)
From June 1 - 3, 1993, the NRC administered requalification examinations to thirteen
employees of your company who operate the Millstone Unit 2 Plant. Twelve of the thirteen
operators passed the written, walkthrough, and simulator portions of the examination. One
operator failed the written portion of the examination, and seven additional operators passed
the simulator portion. As a result of these evaluations, your requalification program has
been assigned an overall program rating of satisfactory in accordance with the criteria of
This evaluation addressed areas important to public health and safety ed was conducted in
accordance with Revision 7 to NUREG-1021, " Operator Licensing Examiner Standards," ES-
601, " Administration of NRC Requalification Program Evaluations." The evaluation had two
purposes, evaluating the effectiveness of the licensed operator requalification training
program at maintaining the competency oflicensed operators, and examining the individual
operators to determine if they would satisfy the regulatory rcquirement of passing an NRC-
administered examination prior to license renewal. At the conclusion of the examination, the
l
results of the examination were discussed with Mr. Ruth, Mr. Becker, and other members of
l
l
your staff.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and
the enclosure will be placed in the NRC Public Document Room.
i
OFFICIAL RECORD COPY
G:MS9312.RER
i
l
D
DO K O 00
.
,
l
,
-~
.
. _ _ .
'JUL
61993
,
Mr. John F. Opeka
2
Should you have any questions regarding this examination and inspection, please contact me
at 215-337-5291.
Sincerely,
f
/'
Lee H. Bettenhausen, Chief
Operations Branch
Division of Reactor Safety
Enclosure: Requalification Program Evaluation Report No.
50-336/93-12 (OL-RQ) w/ Attachments 1 and 2
Attachments:
1. Northeast Utilities Letter MP-93-514 from S. E. Scace
to Dr. L. Bettenhausen, dated June 28,1993
2. Simulator Facility Report
,
cc w/ encl; w/o Attachments 1 and 2:
W. D. Romberg, Vice President, Nuclear Operations
J. S. Keenan, Nuclear Unit Director
,
'
R. M. Kacich, Director, Nuclear Licensing
D. O. Nordquist, Director of Quality Services
M. Wilson, Nuclear Licensing
i
Gerald Garfield, Esquire
Nicholas Reynolds, Esquire
NRC Resident Inspector
State of Connecticut, SLO
cc w/enci and Attachments 1 and 2:
S. E. Scace, Vice President, Millstone Station
'
R. Spurr, Acting Supervisor, Training Department
.
F
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
-
1
OFFICIAL RECORD COPY
G:MS9312.RER
. - - .
__
.
- -_
,
.
..
JUL
61993-
.
Mr. John F. Opeka
-3
bec w/ encl; w/o Attachments 1 and 2:
K. Ihnen, Chief Examiner, DRS
Mark Jones, NRC Consultant (EG&G)
Frank Jaggar, NRC Consultant (EG&G)
OL Facility File
bec w/ concurrences and w/ encl; w/o Attachments 1 and 2:
k
Region I Doc. et Room
bec w/ encl and Attachments 1 and 2:
Master Exam File
-l
.
bec w/ encl; w/o Attachments 1 and - (VIA E-MAIL):
2
V. McCree, OEDO
R. Gallo, Chief, OLB, NRR
NOTIFY VIA E-MAIL AND NO ATTACIIED FILE
W. Lanning, DRP
L. Bettenhausen, DRS
R. Blough, DRP
J. Durr, DRS
R. Conte, DRS
G. Meyer, DRS
L. Doerflein, DRP
K. Ihnen, DRS
P. Swetland, SRI
RI:DRS
RI:DRS
RI:DRS
Be
ausen
1hrien/dmg
Meyer
07M/93
07/01/93
07/(/93
OFFICIAL RECORD COPY
G:MS9312.RER
-.
.
_
_
_ . - . _ .
.
.
.