Text
.
- 9
$
JUL
2 1933
Docket No. 50-309
Mr. Charles D. Frizzle
President
Maine Yankee Atomic Power Company
83 Edison Drive
Augusta, Maine 04336
Dear Mr. Frizzle:
SUBJECT:
REQUALIFICATION PROGRAM EVALUATION REPORT NO. 50-309/
93-09 (OL-RQ)
From May 24 - 27,1993, '.ne NRC administered requalification examinations to employees
i
'
of your company who orerate the Maine Yankee facility. These examinations addressed
areas important to pubbc health and safety and were conducted in accordance with Revision 7
,
!
to NUREG-1021, Operator Licensing Examiner Standards, ES-601, " Administration of NRC
Requalification Program Evaluations." The evaluation had two purposes, evaluating the
effectiveness of the licensed operator requalification training program at maintaining the
competency of licensed operators and examining the individual operators to determine if they
would satisfy the regulatory requirement of passing en NRC-administered examination prior
j
to license renewal. Both purposes were met successfully. At the conclusion of the
.
examination, the results and findings were discussed with Mr. Blackmore and other members
t
'
of your staff.
As evaluated by the NRC, all twelve operators passed the written and operating portions of
'
the examination and two of the three crews, made up of these twelve operators, passed the
i
simulator portion of the examination. The evaluation was conducted in accordance with the
i
criteria established in NUREG-1021, as cited above. As a result of the evaluation, your
l
requalification program has been assigned an overall program rating of satisfactory. We
,
regret any disturbance to your program caused by our delay in making the decision to fail the
one crew on their simulator examination.
i
?
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and
the enclosure will be placed in the NRC Public Document Room.
i
,
!
!
OFFICIAL RECORD COPY
G:MY9309.RER
9307140055 930702
ADOCK 05000309
f
V
PDrt
~
_
>
-
-
.
_
JUL
21993
,
7
,.
,
,
Mr. Charles D. Frizzle
2
j
Should you have any questions regarding this examination, please contact me at
215-337-5291.
.
!
Sincerely,
j
p,
_.
,
4
Lee H. Bettenhausen, Chief
.
Operations Branch
Division of Reactor Safety
l
Enclosure: Requalification Program Evaluation
}
Report No. 50-309/93-09 (OL-RQ)
i
cc w/ encl:
i
G. Leitch, Vice President, Operations
P. L. Anderson, Project Manager (Yankee Atomic Electric Company)
R. W. Blackmore, Plant Manager
J. A. Ritsher, Attorney (Ropes and Gray)
l
P. Dostic, State Nuclear Safety Inspector
Peter Brann, Assistant Attorney General
j
U. Vanags, Maine State Planning Office
.
C. Brinkman, Combustion Engineering, Inc.
l
First Selectmen of Wiscasset
Maine State Planning Officer
!
Public Document Room (PDR)
Local Public Document Room (LPDR)
l
Nuclear Safety Information Center (NSIC)
,
K. Abraham, PAO (2)
j
NRC Resident Inspector
2
,
j
bec w/ encl:
,
Region I Docket Room (with concurrences)
J. Prell, DRS
!
John Hanek, EG&G
Steve Johnson, EG&G
OL Facility File
l
3
h
OFFICIAL RECORD COPY
G:MY9309.RER
-!
l
.-
--
-
.
JUL
21993
.
l
Mr. Charles D. Frizzle
4
bec w/enci (VIA E-MAIL):
V. McCree, OEDO
J
E. Trottier, LPM, NRR
W. Butler, NRR
!
i
NOTIFY VIA E-MAIL AND NO AWACIIED FILE
I
_
L. Bettenhausen, DRS
i
G. Meyer, DRS
j
J. Prell, DRS
i
t
,
i
,
i
.
h
5
I
,
i
!
t
- !
(
i
RI- R
RI:DRS
RI:DRS
Pr / ig
Meyer
nhausen
.
/93
Of/(/93
0{T/193
'
'
1p'%
_
.
OFFICIAL RECORD COPY
G:MY9309.RER
!
+
P
I
'
>
-
.
-- -